Permit GopherAlberta and B.C. property, permit and zoning records

1975 Pendrell St, Vancouver

An address in West End, Vancouver, zoned RM-5B (Residential). 7 building permits are on file, most recently “#309 Interior alterations to provide residential improvement to an existing dwelling unit…” (issued 10 April 2026). The City's 2026 assessed value is $30,558,000.

Zoning
RM-5B · Residential
Neighbourhood
West End
Permits on file
7
Assessed value (2026)
$30,558,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1975 Pendrell St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150861, 634 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
634
Households
425
Median age
58.4
Median household income (2020)
$68,500
Own their home
56%
Vancouver: 45%
Average household size
1.5
Under 15
5%
65 and over
35%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-04-10 #309 Interior alterations to provide residential improvement to an existing dwelling unit at #309 - 1975 PENDRELL ST. on the third floor of this existing multiple dwelling building on the site. Okay for DTI per City staff · $50,000
    Lopes Renovation + Construction Inc
    Issued
  2. 2021-07-22 #509- 5th floor Interior alterations only to provide improvements to this existing multiple dwelling unit on the the 4th floor (#509) of this existing multiple dwelling building on this site. Scope of work: Kitchen and bathroom upgrade. New interior doors. E2 - Appliances - Upgrading the dishwasher and fridge to Energy Star appliances · $65,000
    applicant withheld (individual)
    Issued
  3. 2021-04-22 #401 - 4th Floor Interior alterations only to provide improvements to this existing multiple dwelling unit on the the 4th floor (#401) of this existing multiple dwelling building on this site. Scope of Work: Kitchen; Re and re cabinets, appliances, and countertops Bathroom; Re and re vanity, toilet, tub, shower and fixtures. Re and re flooring throughout · $59,500
    no contractor listed
    Issued
  4. 2020-09-11 Interior alterations to provide improvements for unit #301 in this existing multiple dwelling building. Scope of work includes validating bathroom modification and to add appliances to kitchen. OK for field review as per City staff: 1. This building is not sprinklered. Energy Upgrade: L2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights · $4,000
    no contractor listed
    Issued
  5. 2019-11-20 Interior alterations to replace existing single-stage conventional fire alarm system with new addressable singe stage system and to provide modernization of existing elevator to allow for elevator recall from ground to 6th floor & penthouse of this existing multiple dwelling residential building for CSA-B44 upgrade. Scope of work: - Replace existing conventional FACP with new addressable single stage system and replace existing fire alarm annunciator to show automatic emergency elevator recall zones. - Upgrade electrical equipment for elevators in the machine rooms to suit new elevator power requirements. - Install new geared machines, wiring & traveling cable, equipment for ascending over-speed protection, door operator, elevator cab interior finishes and operating fixtures. - Install new relays and upgrade existing FAS initiation devices to addressable type and to allow for activation of the automatic emergency elevator recall sequence. - Programming of Elevator Recall and FEO functions. Building Review Branch Notes: · $226,940
    no contractor listed
    Issued
  6. 2019-04-15 #511 Interior alterations to provide improvements to dwelling unit #511 on the 5th floor of this multiple dwelling building on this site. OK for field review per City staff. Notes: 1. Building is not sprinklered 2. Energy trigger chosen; L2 - SWH - Install low flow shower heads in all showers · $35,000
    Refine & Design Real Estate Inc
    Issued
  7. 2019-03-26 #205 Interior alterations to provide improvements to this existing dwelling unit #205 on the 2nd floor in this existing multiple dwelling building on this site. OK for field review per City staff: - remove and replace kitchen cabinets, counter tops, sink and appliances - remove entry closet to create a new doorway to kitchen area - remove bath tub and install walk-in shower - remove and replace plumbing fixtures - install new flooring, pot lights, and vanity cabinet at bathroom Building Not Sprinklered – No sprinkler inspection or permit required. Energy Checklist Selected: L2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) · $65,000
    Lopes Renovation + Construction Inc
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.