Permit GopherAlberta and B.C. property, permit and zoning records

1930 Haro St, Vancouver

An address in West End, Vancouver, zoned RM-5B (Residential). 3 building permits are on file, most recently “1920 Haro Street Interior alterations to this existing unit in this existing multiple dwe…” (issued 24 February 2020). The City's 2026 assessed value for the 7 accounts at this address is $12,892,000.

Zoning
RM-5B · Residential
Neighbourhood
West End
Permits on file
3
Assessed value (2026)
$12,892,000
7 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1930 Haro St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153589, 905 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
905
Households
645
Median age
45.6
Median household income (2020)
$60,800
Own their home
30%
Vancouver: 45%
Average household size
1.4
Under 15
4%
65 and over
22%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2020-02-24 1920 Haro Street Interior alterations to this existing unit in this existing multiple dwelling building on this site. Scope to include: Extending the second floor bathroom over the existing open to below by adding approximately 28 sq.ft. Reconfigure bathroom for a better layout. OK For Field Review Per City staff.2020 · $35,000
    Fifth Element Construction & Renovations Ltd
    Issued
  2. 2019-05-08 Interior alterations to provide improvements to this 2 level multiple dwelling building in this multiple dwelling building on this site. OK for field review per City staff. Notes: 1. Building inspector to determine on site if a separate sprinkler permit is required. 2. Energy trigger chosen: L2 - SWH - Install low flow shower heads in all showers · $130,000
    Lonetree Enterprises Ltd
    Issued
  3. 2019-01-09 1928 Haro street - Interior alterations to provide tenant improvements to this existing multiple dwelling. Scope of work to include: Install new mill work in living room and master bedroom. Remove and replace all existing fixtures as well as new tile in bathroom on second floor. Remove a little wall and bathtub and replace with shower, and update the remaining plumbing fixtures and redo the tile in the Master Ensuite. OK for Field Review as per City staff.2018 Selected Energy Upgrade: L2 - SWH - Install low flow shower heads in all showers · $20,000
    applicant withheld (individual)
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.