1780 Fir St, Vancouver

An address in Fairview, Vancouver, zoned FCCDD (Comprehensive Development). 1 building permit is on file, most recently “To construct a 6-storey mixed-use building consisting of: 1st storey - 5 retail CRU's (sh…” (issued 8 May 2025). The City's 2026 assessed value is $18,475,000.

Zoning
FCCDD · Comprehensive Development
Neighbourhood
Fairview
Permits on file
1
Assessed value (2026)
$18,475,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1780 Fir St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153686, 886 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
886
Households
480
Median age
53.2
Median household income (2020)
$83,000
Own their home
46%
Vancouver: 45%
Average household size
1.9
Under 15
12%
65 and over
34%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-05-08 To construct a 6-storey mixed-use building consisting of: 1st storey - 5 retail CRU's (shell only) 2nd to 6th storeys - 100 dwelling units; Amenity Rooms on Level 2 Rooftop - outdoor amenity all over 2 levels of underground parking accessed from W 2nd Av. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. 3. The building is divided by a firewall to permit combustible construction above the 1st storey. 4. Design area of the floor areas above the basement shall be twice the design area otherwise permitted by NFPA 13 per Sentence 3.2.6.1.(2). 5. Only two CRUs may be used as restaurants at any given time, due to limited vertical kitchen exhaust shafts in the building. 6. Pre-shaft: Two 2-hour vertical shafts are proposed from the ceilings of CRUs #1 and #4 to the roof. The ductwork and exhaust fans will be installed by the future tenant. STAGED CONSTRUCTION STAGE I: Excavation & Shoring (S.Yoo) ISSUED: Apr. 25, 2024 REVISION I: Addition of Archeological Term to 'Terms and Conditions' (S.Yoo) ISSUED: Apr. 29, 2024 REVISION II: Revisions to Shoring Drawings (S.Yoo) ISSUED: Jul. 19, 2024 STAGE II: Foundation up to Grade (S.Yoo) ISSUED: Dec. 3, 2024 STAGE III: Full Construction (S.Yoo) ISSUED: May 8, 2025 REVISION III: Addition of 2 Washrooms on Level 1; Revisions to Fire Separations and Fire-Blocking Details; Miscellaneous Mechanical Changes including City Connection Details; and Revisions per City staff · $35,000,000
    Kindred Construction Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Fairview

1126 W 13TH Av
To replace the structural posts in the front covered area of this existing multiple dwelling building. OK to process as DTI as per City staff · no contractor listed
2026-11-05
1401 W 8TH Av
#300-1401 W 8th Avenue Interior alterations to provide tenant improvements to this existing Radio Communication Station to add one meeting room within unit #300 on the 3rd level of this existing commercial building on this site. Okay for FR as per City staff · Multigroup Enterprise Corp
2026-11-05
1650 W 1ST Av
Exterior alterations for targeted building envelope repairs to the south roof deck membrane in this existing multiple dwelling building on this site. The scope includes to remove and replace the sanitary piping on this roof deck. Ok for Field review per City staff · no contractor listed
2026-11-04