Permit GopherAlberta and B.C. property, permit and zoning records

1750 Beach Av, Vancouver

An address in West End, Vancouver, zoned R1-1 (Residential Inclusive). 8 building permits are on file, most recently “SPECIAL EVENT: To erect and install 1 - 62' x 350' grandstand with incorporated bleacher …” (issued 8 July 2025). The City's 2026 assessed value for the 2 accounts at this address is $422,920,200.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
West End
Permits on file
8
Assessed value (2026)
$422,920,200
2 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1750 Beach Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Permit history

  1. 2025-07-08 SPECIAL EVENT: To erect and install 1 - 62' x 350' grandstand with incorporated bleacher seats for the Honda Celebration of Light for a limited period of time expiring July 29, 2025. Notes: 1. 10 - 10' x 10' and 11 - 10' x 20' tents are also integrated into the grandstand and bleacher arrangements. 2. Permit reviewed and approved to VBBL #12511 (2019) Revision #1 (P Volpi, July 9/25): · $90,000
    no contractor listed
    Issued
  2. 2024-12-09 SPECIAL EVENT: To erect and install a 12' x 12' by 6' high stage for the Polar Bear Swim event for a limited period of time expiring January 1, 2025. Noe: Permit reviewed and approved to VBBL #12511 (2019) · $7,220
    no contractor listed
    Issued
  3. 2023-12-20 SPECIAL EVENT: To erect and install 1- 12' x 12' by 6' height stage and 1 - 10' x 10' pop-up tent for the Polar Bear Swim event for a limited period of time expiring January 1, 2024. Note: permit reviewed and approved to VBBL #12511 (2019) · $5,870
    no contractor listed
    Issued
  4. 2023-06-28 SPECIAL EVENT: To erect and install bleacher seating for the Honda Celebration of Light event for a limited period of time expiring July 31, 2022. Note: This application and associated documents were reviewed and approved under the current by-law (VBBL (2019) #12511). · $112,624
    no contractor listed
    Issued
  5. 2022-12-19 SPECIAL EVENT: To erect and install 1 - 12' x 12' by 6' height stage and 1 - 10' x 10' pop-up tent for the Polar Bear Swim event for a limited period of time expiring January 1, 2023. · $4,770
    no contractor listed
    Issued
  6. 2022-07-26 SPECIAL EVENT: To erect and install bleacher seating for the Honda Celebration of Light event for a limited period of time expiring July 31, 2022. · $112,624
    no contractor listed
    Issued
  7. 2019-07-05 To erect and install bleacher seating for the Honda Celebration of Light event for a limited period of time expiring August 16th, 2019. · $120,000
    no contractor listed
    Issued
  8. 2018-07-10 To erect and install bleacher seating for the Honda Celebration of Light event for a limited period of time expiring August 11, 2017. · $87,680
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.