Permit GopherAlberta and B.C. property, permit and zoning records

162 W 1st Av, Vancouver

An address in Mount Pleasant, Vancouver, zoned CD-1 (462) (Comprehensive Development). 4 building permits are on file, most recently “Interior alterations to provide tenant improvements for a new retail (limited service foo…” (issued 29 May 2025). The City's 2026 assessed value for the 303 accounts at this address is $246,265,002.

Zoning
CD-1 (462) · Comprehensive Development
Neighbourhood
Mount Pleasant
Permits on file
4
Assessed value (2026)
$246,265,002
303 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 162 W 1st Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154174, 8,739 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
8,739
Households
5,105
Median age
35.2
Median household income (2020)
$104,000
Own their home
46%
Vancouver: 45%
Average household size
1.7
Under 15
9%
65 and over
8%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-05-29 Interior alterations to provide tenant improvements for a new retail (limited service food) tenant on the ground floor of the existing mixed-use building (building 1) on this site. Building is sprinklered TENANT: Body Energy Club Ltd · $60,000
    Myth Decoration Group Ltd
    Issued
  2. 2022-08-18 162 W 1st Ave Interior alterations to provide improvements to the ancillary offices to the theatre at this existing mixed-use building on this site. E2 - HVAC - Clean and Balance all Air Systems (per City staff.7.2.3.2 of ASHRAE 90.1-2016) · $100,000
    Group West Management Corporation
    Issued
  3. 2021-12-06 #453 Interior alterations only to improve the residential dwelling unit in this existing multiuse building on this site. work to include: remove drop in tub in ensuite washroom and replace with shower stall, drywall, tile work to suite. OK for field review per City staff: E2 - SWH - Install low flow shower heads in all showers · $13,250
    applicant withheld (individual)
    Issued
  4. 2017-08-08 1731 Manitoba St - Main floor Interior alterations to provide improvements for New Retail Ltd Food tenant at 1731 Manitoba St in this existing mixed-use building. Scope of work: demolish/construct partition walls, ceiling work, new millwork and finishes, electrical work to enlarge sitting area and reduce kitchen area. REVISION: portion of ceiling remains as T-bar. No change to G.W.B. Nov. 1/17 mk TENANT: Yandoux Patisserie Ltd. OK for TIPS as per City staff. Note: Maximum 16 seats permitted. Related to Special Sprinkler Inspection No. IA-2017-00838. Energy Upgrade Exempt: Base Building built to 90.1-2007 or better. · $20,000
    MYK Construction Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

523 E 10TH Av
To construct a 20-storey mixed-use building (176 secured market rental units) consisting of: 1st storey - child care facility (shell only); rental office; co-work space 2nd to 19th storeys - dwelling units; indoor & outdoor amenities on Level 2 20th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation & Shoring; Foundation up to Grade; Revisions to the Building’s Interior and Exterior per City staff(S.Yoo) ISSUED: Nov. 3, 2026 REVISION I: Change of General Contractor - In review STAGE II: Full Construction - In review · ITC BC BUILDERS INC.
2026-11-03
1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.