This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1601 Quebec St, Vancouver
An address in Mount Pleasant, Vancouver, zoned CD-1 (612) (Comprehensive Development). 3 building permits are on file, most recently “To construct a 17-storey residential building, consisting - townhouses on level 1 and 2 -…” (issued 21 July 2020). The City's 2026 assessed value for the 93 accounts at this address is $284,358,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154174, 8,739 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2020-07-21
To construct a 17-storey residential building, consisting - townhouses on level 1 and 2 - dwelling units on Level 3 to 17 all over 3-level of underground parking, from access off of Switchmen Street. Stage #1 - excavation and shoring - issued 2020-01-14 Stage #2 - full construction - issued 2020-07-21 - COVID 2019 Rozina issued revision permit on Jan 29 2021. Changes in the revision: Level P3 - Private storage rooms were deleted and 3 storage locker rooms were created. An extra private storage room was created. Level P1 - Service rooms sizes changed. Level 2 - Steam equipment room and mechanical closet added. Level 16 - Exterior patio doors changed to foldable doors. Level 17 - New metal and glass canopies added over patio doors. · $84,000,000
no contractor listed Issued -
2019-05-31
To demolish this existing one storey Temporary Presentation Center "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver."\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $100,000
no contractor listed Issued -
2019-05-03
Interior alterations to allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing commercial builidng
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes2026-10-16