Permit GopherAlberta and B.C. property, permit and zoning records

1551 Grant St, Vancouver

An address in Grandview-Woodland, Vancouver, zoned CD-1 (807) (Comprehensive Development). 9 building permits are on file, most recently “To develop a 6-storey Multiple Dwelling containing 35 Secured Market Rental Dwelling Unit…” (issued 25 January 2023). The City's 2026 assessed value is $19,288,000.

Zoning
CD-1 (807) · Comprehensive Development
Neighbourhood
Grandview-Woodland
Permits on file
9
Assessed value (2026)
$19,288,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1551 Grant St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150348, 529 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
529
Households
320
Median age
39.6
Median household income (2020)
$81,000
Own their home
42%
Vancouver: 45%
Average household size
1.8
Under 15
11%
65 and over
13%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2023-01-25 To develop a 6-storey Multiple Dwelling containing 35 Secured Market Rental Dwelling Units, all over one level of non-combustible underground parking. · $9,075,000
    Hovercraft Builders Ltd
    Issued
  2. 2022-07-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. 75% of recycling is required Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
    Kingsman Excavating Ltd.
    Issued
  3. 2022-07-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. 75% of recycling is required Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
    Kingsman Excavating Ltd.
    Issued
  4. 2022-07-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. 90% of recycling is required Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 90 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
    Kingsman Excavating Ltd.
    Issued
  5. 2022-07-22 To provide for the Demolition/Deconstruction of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. 75% of recycling is required Note: 1) This permit is subject to the Green Demolition Bylaw with a recycling requirement of 75 percent of non-hazardous construction materials. 2)The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [contact removed]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. 3) Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside of Vancouver. · $15,000
    Kingsman Excavating Ltd.
    Issued
  6. 2022-05-24 To provide for the Salvage and Abatement of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. QP is Steven Seewald of ALARA Environmental Health & Safety Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please upload all documents digitally signed and sealed related to S/A using the City's electronic permitting system as per BULLETIN 2015-008-EV.
    Kingsman Excavating Ltd.
    Issued
  7. 2022-05-24 To provide for the Salvage and Abatement of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. QP is Steven Seewald of ALARA Environmental Health & Safety Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please upload all documents digitally signed and sealed related to S/A using the City's electronic permitting system as per BULLETIN 2015-008-EV.
    Kingsman Excavating Ltd.
    Issued
  8. 2022-05-24 To provide for the Salvage and Abatement of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. QP is Steven Seewald of ALARA Environmental Health & Safety Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please upload all documents digitally signed and sealed related to S/A using the City's electronic permitting system as per BULLETIN 2015-008-EV.
    Kingsman Excavating Ltd.
    Issued
  9. 2022-05-24 To provide for the Salvage and Abatement of this existing One-Family Dwelling building on this site. OK for SIPS processing as per City staff. QP is Steven Seewald of ALARA Environmental Health & Safety Ltd. Note : This is a salvage and abatement permit only and does not authorize any demolition or deconstruction work on the house. Once you have completed your salvage and abatement, please upload all documents digitally signed and sealed related to S/A using the City's electronic permitting system as per BULLETIN 2015-008-EV.
    Kingsman Excavating Ltd.
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Grandview-Woodland

2320 Trinity St
#302 2320 TRINITY ST Interior alterations to provide improvements to this unit #302 on 3RD floor of this existing multiple dwelling building on this site. Project scope: Kitchen and bathroom reno Okay for DTI as per City staff · Modern Star Contracting Ltd
2026-10-30
1710 E Pender St
To construct a 19-storey mixed-use building (191 social housing units) consisting of: 1st storey - 2 CRUs; 7 live/work artist studios (Class A); indoor amenity 2nd to 18th storeys - dwelling units; indoor & outdoor amenities on Levels 4 & 7 19th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of the 2025 VBBL. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation and Shoring (S.Yoo) ISSUED: Oct. 22, 2026 · Chandos Construction
2026-10-22
2244 Mcgill St
#204-2244 MCGILL ST Interior alteration toto provide improvements to this existing residential unit #204 on 2nd floor in this existing multiple dwelling building on this site. Scope of work includes: removing of drywall to install wardrobe Okay for DTI as per City staff · no contractor listed
2026-10-20
Something wrong on this page? Tell us and we'll check it against the City's records.