Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1535 W 3rd Av, Vancouver
An address in Fairview, Vancouver, zoned IC-2 (Industrial). 1 building permit is on file, most recently “Change of Major Occupancy - Interior and exterior alterations to combine Unit #1535 and #…” (issued 22 October 2018). The City's 2026 assessed value is $7,060,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154165, 661 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2018-10-22
Change of Major Occupancy - Interior and exterior alterations to combine Unit #1535 and #1539 into one unit and change of major occupancy from Artist Studio (Group F2) to Office (Group D) in this one storey plus mezzanine commercial building. Scope of work includes alterations to the parking and loading area, installing skylights and two (2) rooftop units, and convert the second storey to a mezzanine. Upgrade Levels: F4, S4, N4, A4, E3. Energy Upgrade E3 - Select L3 - HVAC - Balance all systems (per City staff.7.2.3 of ASHRAE 90.1-2010) Revision#1 - Jan 11, 2019, J. Chen - Apply plywood diaphragm on top of new enclosed offices for seismic upgrade. - Reduce number of offices on both levels. - Provide additional assembly details. - Change stair dimensions. - Change double doors on the north elevation to overhead doors. - Extend deck at rear of the building, relocate exterior ramp and change ramp guard wall material to wood. - Change parking and bike storage layout. - Change lighting fixtures. * The space above the new enclosed offices cannot be accessed and is not permitted to be occupied. See Commitment Letters from landlord and tenant. · $110,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Fairview
To replace the structural posts in the front covered area of this existing multiple dwelling building. OK to process as DTI as per City staff · no contractor listed2026-11-05
#300-1401 W 8th Avenue Interior alterations to provide tenant improvements to this existing Radio Communication Station to add one meeting room within unit #300 on the 3rd level of this existing commercial building on this site. Okay for FR as per City staff · Multigroup Enterprise Corp2026-11-05
Exterior alterations for targeted building envelope repairs to the south roof deck membrane in this existing multiple dwelling building on this site. The scope includes to remove and replace the sanitary piping on this roof deck. Ok for Field review per City staff · no contractor listed2026-11-04