Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1528 W 28th Av, Vancouver
An address in Shaughnessy, Vancouver, zoned R1-1 (Residential Inclusive). 2 building permits are on file, most recently “Building Permit for DP-2019-00391 (Infill MD at Front) To construct a new two-storey mult…” (issued 2 February 2021). The City's 2026 assessed value for the 7 accounts at this address is $11,691,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150662, 414 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2021-02-02
Building Permit for DP-2019-00391 (Infill MD at Front) To construct a new two-storey multiple dwelling infill building containing 4 dwelling units ($2,075,145.60) at the front, providing a total of 6 parking space on the site, with vehicular access from the Lane. See BP-2020-01691 for Drawings, Application Documents and Time Log. ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2019******** Building envelope and environmental separation as per Part 5 Design: · $2,075,146
Haebler Construction (2003) Inc Issued -
2021-02-02
Building Permit for DP-2019-00391 (MCD at rear) Interior and exterior alterations and addition to convert this character house one family dwelling to MCD containing 2 dwelling units ($1,383,430.40) and to stratify the lot. ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2019******** Building envelope and environmental separation as per Part 5 Design: · $1,383,430
Haebler Construction (2003) Inc Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Shaughnessy
Exterior and interior alterations to convert the built-in garage to a theatre, add to the existing rear covered porches (main and second floors), alter the porte cochere and to construct a new detached garage at the rear of this existing two storey plus cellar single detached house. · no contractor listed2026-10-30
Exterior and interior alterations to extend the front and rear of the existing attached garage, add to the rear of the basement and main floors, increase the ceiling heights on the upper by replacing the roof to this existing two storey plus basement with attached one car garage single detached house on this corner with lane site. Scope of work includes an entirely new roof, new low grade patio on the south side and reconstruction of the main and upper floors. This building is not sprinklered. Related to DP-2025-00741. · Henry Creative Inc2026-10-22
To construct a 6-storey residential building (124 dwelling units) consisting of: 1st to 5th storeys - dwelling units 6th storey (rooftop) - indoor & outdoor amenities all over 1 level of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of VBBL 2025. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation & Shoring; Foundation up to Grade (S.Yoo) ISSUED: Oct. 16, 2026 REVISION I: Revisions to Foundation Drawings related to DPMA DP-2026-00827 - In review · STRAND CONTRACTING LTD.2026-10-16