Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1500 Haro St, Vancouver
An address in West End, Vancouver, zoned RM-5 (Residential). 3 building permits are on file, most recently “Exterior alterations to install an accessible ramp to the front entrance facing north of …” (issued 5 March 2025). The City's 2026 assessed value for the 38 accounts at this address is $33,486,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153839, 1,379 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-03-05
Exterior alterations to install an accessible ramp to the front entrance facing north of this existing multiple dwelling building on this site. Scope of work includes: Removing and disposing existing planters and landscaping. New landscaping and concrete ramp. · $150,000
no contractor listed Issued -
2020-09-08
Exterior alterations for concrete repair to existing concrete cladding on all elevations of this existing residential building. Scope of work includes repair of spalling concrete, new liquid waterproofing membrane on balconies, and painting to match existing colour. OK for Field Review per City staff · $150,000
no contractor listed Issued -
2018-07-09
Exterior alterations only for aluminum window replacements and caulking on all four sides of the building. Scope of work includes removal of WWOP security bar from the bedroom at Unit 102. OK for BP only per City staff. OK for colour change of window frames from dark brown to black as per City staff. Arch B & Sch D-1 submitted. ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2014******** Building Permit Review Notes: - The work is NOT associated with water ingress damage. - New windows and balcony doors shall conform to AMA/WDMA/CSA101/I.S.2/A440, NAFS. - Revision to this permit or a separate permit is required for concrete repair or any work not in the scope. · $1,068,000
A-1 Window Mfg Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in West End
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd2026-10-30
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd2026-10-30
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc2026-10-30