Permit GopherAlberta and B.C. property, permit and zoning records

138 E 8th Av, Vancouver

An address in Mount Pleasant, Vancouver, zoned C-3A (Commercial). 4 building permits are on file, most recently “Interior alterations to change the use from Retail to Beauty and Wellness Center and prov…” (issued 1 May 2024). The City's 2026 assessed value for the 20 accounts at this address is $16,836,000.

Zoning
C-3A · Commercial
Neighbourhood
Mount Pleasant
Permits on file
4
Assessed value (2026)
$16,836,000
20 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 138 E 8th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153163, 396 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
396
Households
265
Median age
34.8
Median household income (2020)
$60,400
Own their home
13%
Vancouver: 45%
Average household size
1.5
Under 15
2%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2024-05-01 Interior alterations to change the use from Retail to Beauty and Wellness Center and provide first TI for a new tenant on the ground floor of this existing mixed use building. · $100,000
    no contractor listed
    Issued
  2. 2019-06-19 To construct a 6-Storey mixed-use building with commercial unit (shell only) on the ground floor and 18 market dwelling units on levels 2 to 6 all over 2 levels of underground parking accessed from the adjacent lane. Separate tenant improvement permit is required for shell tenant space. This permit has been reviewed under the 2014 Vancouver Building By-law (#10908). STAGED CONSTRUCTION Stage 1: Excavating and Shoring - issued Feb. 12, 2019 Stage 2: Full Structural - issued Jun. 19, 2019 Revision #1: Change of Owner and Building Contractor - issued Nov. 28, 2019 Revision #2: Revised Shoring design on the west wall and revised Structural drawings to replace previously issued Stage 2 set - issued August 12, 2020 Stage 3: Full Construction - issued Dec. 2, 2020 · $8,000,000
    Prima West Construction Ltd
    Issued
  3. 2018-12-07 To demolish this existing one storey commercial building on this site. Ok for SIPS as per City staff: Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or [contact removed] outside Vancouver · $50,000
    MVP Demolition Inc
    Issued
  4. 2018-06-18 Salvage & Abatement To allow salvage of non-structural building components prior to or during abatement work and removal of non-structural hazardous materials in this existing one storey commercial building. A separate building permit is required to demolish the building. QP: Trevor Getty of Antiguity Environmental Consulting Relate to Permit: BP-2018-02654
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.
2026-10-30
345 W 11TH Av
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.