This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1350 W 8th Av, Vancouver
An address in Fairview, Vancouver, zoned C-3A (Commercial). 11 building permits are on file, most recently “#504 - 5th floor Interior alterations to provide improvements for this existing office te…” (issued 22 September 2026). The City's 2026 assessed value for the 32 accounts at this address is $52,453,177.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153132, 1,360 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-09-22
#504 - 5th floor Interior alterations to provide improvements for this existing office tenant on the 5th floor (#504) of this existing commercial building. Scope of work: Install glass on to existing pony wall to create an interior partition. Okay for DTI as per City staffuctural is required. · $20,000
no contractor listed Issued -
2025-10-09
#300 - 1367 W Broadway Exterior alterations to add a new air handling unit on the roof and Interior alterations to provide tenant improvements to unit 300 (full floor tenant) on the 3rd floor of this existing health care office tenant in this commercial building on this site. Scope of work includes: new interior partitions, doors, new plumbing fixtures, HVAC upgrades, sprinkler configuration and air handling unit on the roof. Revision #1 - July 31, 2026 • Installing mag lock to D300c • Adding extra exit into lobby • Relocating of kitchen to North of Stair 1 (East Elevation) • Reconfiguring central interior walls to include additional staff spaces • Expanding Exam rooms and relocating along west side of the building • Expanding procedure rooms and reconfiguring the walls at rear house space serving procedure rooms • Relocating Level 4 rooftop air handling unit to interior mechanical room and equipment room Increase work cost of $900,000 Relocating Two (2) smaller heat recovery units to level 4 rooftops · $5,900,000
no contractor listed Issued -
2022-09-20
Elevator modernization Interior alterations to provide elevator modernization to the existing addressable single stage fire alarm system to incorporate emergency recall of elevator #3 to meet the requirements of CSA-B44 in this existing 10-storey mixed-use commercial residential building, over 3 levels of underground parking. Scope of work: - Reprogram existing addressable single stage fire alarm control panel to suite the automatic emergency elevator recall function. - Add/upgrade existing addressable smoke detectors, heat detectors, relays and reprogram existing addressable FAS initiation devices to allow for activation of the automatic emergency elevator recall sequence. ******THIS PERMIT HAS BEEN REVIEWED AND ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 ******** Building Review Branch Notes: 1. Elevator 1 & 2 are not part of scopes. · $12,000
no contractor listed Issued -
2022-03-01
#400 - 4th floor To alter the interior of unit 400 to provide improvements to the staff room for this existing General Office tenant. Scope of work: demo & install interior walls & doors, millwork, plumbing fixtures & electrical work, finishes & painting throughout. OK for Field Review per City staffork in unit #201 - 2nd floor. Energy upgrade: E2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $70,000
Counterpoint Interiors Inc Issued -
2022-03-01
#201 - full 2nd floor tenant To alter a portion of the interior of unit #201 to provide improvements to the staff room in this existing General Office unit. Scope of work: demo & install interior walls & doors, millwork, plumbing fixtures & electrical work, finishes & painting throughout. OK for Field Review per City staffork in unit #201 - 2nd floor. Energy upgrade: E2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per City staff.4.1.1.(i) of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $20,000
Counterpoint Interiors Inc Issued -
2020-05-19
#409 - 4th floor Interior alterations to provide improvements for this existing office tenant on the 4th floor (#409) of this existing commercial building. Scope of work: to reconfigure the staff/copy room and to provide a new ttserver room. Tenant: British Columbia Academic Health Science Network Society. Selected energy upgrade: E2 - Lighting - Upgrade to Local Control (per City staff.4.1.1.(a) of ASHRAE 90.1-2016) OK for field review as per City staff. · $59,350
Gara Construction Ltd Issued -
2020-02-18
#201-2nd floor (full floor) *Building #1/S.L. 2 Interior alterations to provide improvements for this existing full floor office unit #201 on the 2nd floor of this commercial building on this site. Scope of work per VBBL 2019: minor demolition of demountable partitions and removal of doors, construct new partition wall to create a new office, new glazing and doors, relocate fire bell, electrical work. TENANT: Bell Alliance OK for field review per City staff: 1. Building inspector to determine if sprinkler permit is required. 2. Energy trigger chosen; E2 - Lighting - Upgrade to incorporate Schedule Shutoff (per City staff.4.1.1(i) of ASHRAE 90.1-2016) · $42,000
Counterpoint Interiors Inc Issued -
2019-01-03
#420 Interior alterations to provide tenant improvements to this existing office space unit #420 on the 4th floor in a commercial building. Scope of work to include: Removal of some interior partition walls to allow for light and creation of new glass partition walls and interior partitions to create small phone rooms. OK For Field Review as per City staff.2018 L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1 - 2010)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t · $106,000
no contractor listed Issued -
2018-10-22
#507-5th floor Interior alterations for a new General Office tenant on the 5th floor (#507) in this existing commercial building. Scope of work to include: demolish all interior partition walls, doors, ceiling, flooring, finishing and millwork, construct new partition walls, doors, millwork, card reader, ceiling, finishes, electrical, mechanical and sprinkler work. REVISION #1-Removal of p.14 from original set of plans (Fire Protection Construction). Refer to SP-2019-00283. May 8/19 nb/jm · $671,135
Canadian Turner Construction Company Ltd Issued -
2018-07-06
#602 Interior/exterior alterations to provide a new gas fireplace including a new exhaust vent at this existing residential dwelling unit #602 at this existing mixed-use commercial and residential building. Energy Upgrade Selected: L2 - HVAC - Replace gas fireplace with sealed combustion unit with electronic ignition - Energuide rating 60 or greater. Notes: · $8,000
applicant withheld (individual) Issued -
2017-03-17
(#602) Interior alterations to provide improvements to the existing kitchen and bathrooms for unit #602 in this existing multiple dwelling building. Scope includes some interior demolition and new cabinets and counter-tops. Okay for field review per City staff: L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) · $60,000
applicant withheld (individual) Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Fairview
To replace the structural posts in the front covered area of this existing multiple dwelling building. OK to process as DTI as per City staff · no contractor listed2026-11-05
#300-1401 W 8th Avenue Interior alterations to provide tenant improvements to this existing Radio Communication Station to add one meeting room within unit #300 on the 3rd level of this existing commercial building on this site. Okay for FR as per City staff · Multigroup Enterprise Corp2026-11-05
Exterior alterations for targeted building envelope repairs to the south roof deck membrane in this existing multiple dwelling building on this site. The scope includes to remove and replace the sanitary piping on this roof deck. Ok for Field review per City staff · no contractor listed2026-11-04