Permit GopherAlberta and B.C. property, permit and zoning records

1308 Beach Av, Vancouver

An address in West End, Vancouver, zoned R1-1 (Residential Inclusive). 3 building permits are on file, most recently “To install a temporary generator with enclosure for the existing Jervis Street Pump Stati…” (issued 13 September 2023). The City's 2026 assessed value is $26,042,000.

Zoning
R1-1 · Residential Inclusive
Neighbourhood
West End
Permits on file
3
Assessed value (2026)
$26,042,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1308 Beach Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59150827, 513 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
513
Households
355
Median age
40.4
Median household income (2020)
$70,500
Own their home
38%
Vancouver: 45%
Average household size
1.5
Under 15
4%
65 and over
22%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2023-09-13 To install a temporary generator with enclosure for the existing Jervis Street Pump Station on this City of Vancouver park. Related DP-2018-00924; M/A DP-2021-00005 Rev #1 - Electrical equipment tags updated Ok for Field Review as per City staff · $480,000
    no contractor listed
    Issued
  2. 2023-04-03 Interior and exterior alterations to the existing pump station to provide an addition of a new emergency generator and its enclosure and revisions to the landscaping for this existing pump station use on this site. ******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 ******** Building Review Branch: · $500,000
    no contractor listed
    Issued
  3. 2022-10-21 1308 Beach Ave Exterior and interior alterations to add an access door to the existing pump station on this site. OK for DTI per City staffpt 16, 2022 NOTE: NO GROUND DISTURBANCE - any ground disturbance may be in contravention to the Heritage Conservation Act and will require appropriate permits and clearances from the Provincial Archaeology Branch, First Nations and the City of Vancouver. · $150,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.