This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
128 W 6th Av, Vancouver
An address in Mount Pleasant, Vancouver, zoned I-1 (Industrial). 6 building permits are on file, most recently “Exterior alterations to provide improvements to this existing Artist Live/Work Studio Cla…” (issued 22 February 2024). The City's 2026 assessed value for the 39 accounts at this address is $28,061,800.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154173, 895 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2024-02-22
Exterior alterations to provide improvements to this existing Artist Live/Work Studio Class A & B Building on this site. Scope of work includes the addition of a gate. Ok for field review as per City staffn KG on Dec. 4, 2023 BRB cleared the review as per City staff: · $20,000
no contractor listed Issued -
2020-10-21
#405 - CF-2019-008209 – Interior alterations to remove an unauthorized mezzanine addition in this existing Artist live/work Studio (#405) on the 4th Level in the existing Artist Live/Work Studio Class A & B Building (Lofts on 6th - approved under BU403048). Scope of work includes: Remove mezzanine, spiral stair and the sprinkler system underneath; existing structural beam, diagonal brace, bathroom and laundry room ceiling to remain as is. OK for field review as per City staff. Notes: ~ Structural Assurance letter for removal of mezzanine submitted by D. · $4,000
no contractor listed Issued -
2020-03-03
#401-4th floor - Interior alterations to remove an unauthorized mezzanine in this existing Artist Studio with associated residential unit forming an integral part of the Artist Studio (#401 on the 4th floor) in this existing mixed-use building. OK for Field Review per City staff: Exempt per City staffite to previously approved layout only. Notes: · $1,500
no contractor listed Issued -
2020-01-09
Interior alterations and a change of major occupancy from Wholesale (Group F2) to General Office (Group D) in this existing mixed use building. Proposed work to formalize the work without permit per City staff. Maximum Occupant Load = 60 persons Building Review Branch Notes: A permanent sign indicating a maximum occupant of 60 persons must be posted in a conspicuous location. · $140,000
no contractor listed Issued -
2018-04-12
#309 Interior alterations to provide improvements to the washroom of artist live/work studio #309 on the 3rd floor of this existing mixed use building on this site. OK for Field Review per City staff: L2 - HVAC - Replace washroom baseboard with in-floor radient system · $24,000
no contractor listed Issued -
2018-03-16
Exterior alterations to provide rainscreening and window replacement at South Elevation, and improvements to waterproofing at various exterior horizontal surfaces, on various floors of this existing commercial/industrial building. OK for Field Review per City staffnder Feb 08/2018 · $728,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Mount Pleasant
To construct a 20-storey mixed-use building (176 secured market rental units) consisting of: 1st storey - child care facility (shell only); rental office; co-work space 2nd to 19th storeys - dwelling units; indoor & outdoor amenities on Level 2 20th storey - indoor & outdoor amenities all over 2 levels of underground parking accessed from the lane. Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. STAGED CONSTRUCTION STAGE I: Excavation & Shoring; Foundation up to Grade; Revisions to the Building’s Interior and Exterior per City staff(S.Yoo) ISSUED: Nov. 3, 2026 REVISION I: Change of General Contractor - In review STAGE II: Full Construction - In review · ITC BC BUILDERS INC.2026-11-03
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed2026-10-30
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.2026-10-30