Permit GopherAlberta and B.C. property, permit and zoning records

1155 Pacific St, Vancouver

An address in West End, Vancouver, zoned RM-5A (Residential). 1 building permit is on file, most recently “Interior alterations to provide residential improvements from fire and water damage to co…” (issued 4 May 2026). The City's 2026 assessed value is $27,220,000.

Zoning
RM-5A · Residential
Neighbourhood
West End
Permits on file
1
Assessed value (2026)
$27,220,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1155 Pacific St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153371, 842 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
842
Households
555
Median age
35.6
Median household income (2020)
$61,600
Own their home
20%
Vancouver: 45%
Average household size
1.6
Under 15
5%
65 and over
12%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-05-04 Interior alterations to provide residential improvements from fire and water damage to common hallways and multiple units on multiple floors of this existing multiple dwelling building on this site. 4th Floor – Unit 409 5th Floor – Unit 509 & 508 6th Floor – Unit 609 Scope of work: Replacement of interior finishes (walls, flooring, ceiling) due to fire and water damage Okay for Field Review as per City staff · $200,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.