Permit GopherAlberta and B.C. property, permit and zoning records

1111 Haro St, Vancouver

An address in West End, Vancouver, zoned RM-5B (Residential). 1 building permit is on file, most recently “Interior alterations to remove the two parking spaces to install an electrical room on th…” (issued 21 August 2025). The City's 2026 assessed value for the 61 accounts at this address is $60,555,002.

Zoning
RM-5B · Residential
Neighbourhood
West End
Permits on file
1
Assessed value (2026)
$60,555,002
61 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1111 Haro St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153682, 683 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
683
Households
400
Median age
33.2
Median household income (2020)
$61,200
Own their home
10%
Vancouver: 45%
Average household size
1.6
Under 15
4%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-08-21 Interior alterations to remove the two parking spaces to install an electrical room on the P1 level of this existing multiple dwelling building on this site. Electrical room will contain the new BC Hydro service entrance equipment and high voltage transformer. Existing service entrance equipment and high voltage transformer to be demolished. Note: 1.0. Application is reviewed under VBBL 2019. 2.0. Scope of work is minor renovation and applicable upgrade triggers are F1, S2, N1 and A2. · $1,300,000
    Sasco Contractors Ltd
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.