Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1101 Pacific St, Vancouver
An address in West End, Vancouver, zoned RM-5A (Residential). 1 building permit is on file, most recently “Interior and exterior alterations: To provide interior and exterior alterations including…” (issued 4 October 2019). The City's 2026 assessed value is $31,181,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153371, 842 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2019-10-04
Interior and exterior alterations: To provide interior and exterior alterations including replacing doors and windows at all levels; replacing roof membrane, siding and planters, interior layout, washer and dryer, flooring, upgrades to mechanical and electrical systems, domestic water re-piping and new emergency generator in this existing 11-storey multiple dwelling rental building on this site. Related to DP-2018-00282 Revision No. 1 as per City staffscope from major renovation to minor renovation b- Deleted generator room and associated shafts and doghouse c- Revised site plan to include removal of 1 tree and addition of 1 tree d- Revised building assemblies P2b,P3 and P3b e- Revise suite entry door to Suite S101 (into Lobby) f- Revised Suite S101 exterior swing exit door to a slider and deleted the exterior exit gate. §• Relocated stair exit door D101.2 (into Lobby) back to original position and added vision glazing to deal with door swing into exit corridor h- Deleted all proposed new insulation and gwb from interior side of all peripheral walls i- Deleted all proposed stacked washer/dryers from suites Note: "This permit has been reviewed under the 2014 Vancouver Building By-law (#10908)." · $6,000,000
no contractor listed Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in West End
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd2026-10-30
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd2026-10-30
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc2026-10-30