Permit GopherAlberta and B.C. property, permit and zoning records

108 E 5th Av, Vancouver

An address in Mount Pleasant, Vancouver, zoned I-1B (Industrial). 5 building permits are on file, most recently “Interior alterations to demise this existing Office space into two units and provide firs…” (issued 12 June 2026). The City's 2026 assessed value is $81,980,000.

Zoning
I-1B · Industrial
Neighbourhood
Mount Pleasant
Permits on file
5
Assessed value (2026)
$81,980,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 108 E 5th Av, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59154173, 895 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
895
Households
425
Median age
38.8
Median household income (2020)
$104,000
Own their home
47%
Vancouver: 45%
Average household size
1.8
Under 15
9%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-06-12 Interior alterations to demise this existing Office space into two units and provide first tenant improvements to one of the newly created unit on the 4th floor of this existing commercial building on this site. · $3,800,000
    Novacom Building Partners Ltd.
    Issued
  2. 2025-12-11 First Tenant Improvement - Interior alteration to combine unit 102 and 106 E 5th Av, and Change of Major Occupancy from Industrial - shell (Group F2) to Health Care Office (Group D) for the VCH UPCC (Urgent Primary Care Centre) tenant on the level 1 of this mixed-use building on the site. Scope includes enclosing Level 1 Upper Floor by a 2 hr fire separation to become a storey. *** Reviewed under the VBBL 2019 *** · $6,696,136
    EllisDon Corporation
    Issued
  3. 2025-03-10 #300 First Tenant Improvement for a single tenant located on Level 3 of a 9-storey mixed use building constructed above 5 levels of below-grade parking. The single tenant on Level 3 will contain laboratory spaces (Group F-3), with subsidiary offices (Group D) and amenity spaces (Group A-2). Work also involves supporting mechanical services in two service spaces located on Level 2 and two service rooms located on Level P1. Notes: 1. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511) with amendments effective on July 1, 2024. 2. Building to be sprinklered to NFPA 13 requirements. STAGED CONSTRUCTION Stage 1 - Full Construction - First TI (Issued March 10, 2025) Revision #1 - Removed 6 laboratories from the Level 3 project scope, revised mechanical shaft orientation in Autoclave Room 348 and reversed door swing in NMR Room 345. (Issued January 12, 2026) Revision #2 - Change of Mechanical and Plumbing EOR from Kevin Shea to Mary On, effective May 22, 2026. (Issued June 1, 2026) · $22,000,000
    Canadian Turner Construction Company Ltd
    Issued
  4. 2024-12-09 Interior alterations for this First Tenant Improvement for a single tenant located on floors 5 to 9. The levels will contain digital industry (animation) and office spaces, with an interconnected floor level 5 to 9 and a staff theatre located within an interconnected space on level 6 and 7. VBBL 2019 - NFPA 13 - AL-2024-00053 Stage 1 - First TI - Full Construction issued on Dec. 9, 2024. Revision #1 (Oct 31, 2025) - The changes primarily involve the reconfiguration of the interior layout on floors 5 through 9, including changes of room types/sizes, wall layouts, workstation layouts, and kitchen/staff-lunch room layout (please see summary of change). · $24,000,000
    Novacom Building Partners Ltd.
    Issued
  5. 2023-05-04 To construct a 9-storey mixed use building containing: 1st storey - Health Care Office shell (Group D) & Industrial use (Group F-2) 2nd storey - General office (Group D) shell and Industrial use (Group F-2) 3rd storey - Laboratory (Group F-2) shell only 4th storey - General office (Group D) shell only 5th to 9th storeys - Digital industry (Group D) shell only, all over 5 levels of underground parking having vehicular access from the lane. NOTE: 10% of floor area on Levels 2 to 9 allocated as accessory amenity area that is used by the tenants. Exact layout to be confirmed and coordinated as part of the TI Permit by Tenant. NOTE: THIS BUILDING IS CONSTRUCTED OF UNBONDED POST- TENSIONED CONCRETE. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511). Radio Antenna System to be installed in this building. STAGED CONSTRUCTION Stage 1 - E& S - issued Dec 22, 2021 Stage 2 - Foundation to Grade - issued Oct 20, 2022 Stage 3 - Full Construction - issued May 4, 2023 BP Rev#1 - July 11, 2024 · $50,000,000
    Icon West Construction Corp
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Mount Pleasant

1255 E 15TH Av
#12 - 1255 E 15TH AV Interior alterations to provide residential improvement to an existing dwelling unit at #12 - 1255 E 15th Ave. on the second floor of this townhouse in existing multiple dwelling building on the site. Okay for DTI per City staff · no contractor listed
2026-10-30
95 E 15TH Av
To demolish this existing single detached house (1946) ($40,000) on this site (non rental) This demolition permit also permits abatement work to be completed to WorkSafe standards. Related permit: DB-2026-03052 This permit is subject to the Green Demolition Bylaw (11023). Pre-1950 homes require recycling of a minimum 75 percent of non-hazardous construction materials, and pre-1940 homes with character will require a minimum 90% recycling of non-hazardous construction materials. In addition, pre-1910 homes or pre-1950 heritage listed homes, require deconstruction and salvage of a minimum of three metric tonnes of wood. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025. · JMS DEMO AND LANDSCAPING LTD.
2026-10-30
345 W 11TH Av
To construct a Multiple Dwelling “Multiplex” with a two-storey two-unit rear building with four carport parking spaces, having vehicular access from the lane. 1.\tMechanical unit proposed – Exterior components located in the courtyard, Interior components located in the second-floor mechanical room · BTH Black Tusk Homes
2026-10-16
Something wrong on this page? Tell us and we'll check it against the City's records.