Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1067 Robson St, Vancouver
An address in West End, Vancouver, zoned DD (Comprehensive Development). 4 building permits are on file, most recently “Interior alterations for a new retail (first) tenant in this new 2 storey + mezzanine she…” (issued 25 February 2020). The City's 2026 assessed value is $36,946,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153483, 869 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2020-02-25
Interior alterations for a new retail (first) tenant in this new 2 storey + mezzanine shell CRU building. The retail tenant (Foot Locker) will occupy the entire building. NO DP REQUIRED AS PER City staffit application ** Stage 1: Full interior t.i. construction. (Feb. 25/20, B. Smith) Sprinkler Permit Notes (Also see File Notes Tab): 1. Sprinkler permit SP-2019-01788 originally submitted for base building permit BP-2018-05692. Tenant improvement for a single tenant applied for under BP-2019-04453. · $1,860,000
no contractor listed Issued -
2019-08-07
To construct a new two storey commercial building (Group E retail ) as shell space for a future retail tenant. · $3,471,600
no contractor listed Issued -
2019-06-13
To demolish the existing retail building on this site by means of demolition. OK for SIPS as per City staff abatement permit · $45,500
Marcon Project (612) Ltd Issued -
2019-04-23
Salvage and abatement permit only for DB-2019-01288 and to be completed under the supervision of a registered professional. This permit does not authorize demolition, deconstruction or construction work.and to be completed under the supervision of a registered professional. OK for SIPS as per City staffn permit
Marcon Project (612) Ltd Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in West End
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd2026-10-30
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd2026-10-30
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc2026-10-30