Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1055 W Broadway, Vancouver
An address in Fairview, Vancouver, zoned C-3A (Commercial). 4 building permits are on file, most recently “#303 - 3rd floor Interior alterations to provide tenant improvements for a new Health Car…” (issued 15 November 2021). The City's 2026 assessed value for the 37 accounts at this address is $33,347,800.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153133, 666 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2021-11-15
#303 - 3rd floor Interior alterations to provide tenant improvements for a new Health Care Office (Dental) on the 3rd floor (#303) in this existing commercial building on this site. Scope of work: remove all doors, walls, finishes and construct new walls, millwork, finishes, for new layout. Electrical, plumbing (4 new sinks), & sprinklers to suit. TENANT: Dolce Dental OK for field review as per City staffnkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade in incorporate Automatic FULL OFF per (9.4.1.1 (h) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. · $300,000
Seasons Contracting Ltd Issued -
2019-08-19
#202 - 2nd floor Interior alterations to provide tenant improvements to office unit #202 on the second floor of this existing commercial building. Scope of work: - install new kitchen millwork, counter top, plumbing fixtures, lighting, flooring and wall finishes - remove existing interior partitions and install new to create two offices, storage and copy room - existing patio to remain as is, guardrail to remain at 42" height OK For Field Review as per City staff.2019 Selected Energy Upgrade: L2 - Lighting - Upgrade all hard wired Lighting within an occupied space to High Efficiency light systems · $50,000
CE Miles Construction Ltd Issued -
2018-09-11
#601 Interior alterations to relocate the partition wall in this existing office unit for new office tenant in this existing commercial building. Work to include: demolish on interior partition, remove all interior finishes, supply and install new finishes, construct new vestibule and create separate office within. Energy Upgrade Selected: L2 - Lighting - Upgrade to incorporate Space Control systems (per City staff.4.1.2 of ASHRAE 90.1 - 2010) Ok for field review per City staff · $20,000
Fusion Project Management Ltd Issued -
2017-11-22
#404 - 4th floor Interior alterations to provide improvements to this existing office unit on the 4th floor (unit #404) of this existing commercial building on this site. Scope of work: new partition walls and door to create a room. Relocate some pot lights and add one sprinkler head. OK for field review per City staff: energy trigger chosen; L2 - Lighting - Upgrade to incorporate Automatic Lighting Shutoff (per City staff.4.1.1 of ASHRAE 90.1-2010) · $5,500
Trans Pacific Homes Inc Issued
The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Fairview
To replace the structural posts in the front covered area of this existing multiple dwelling building. OK to process as DTI as per City staff · no contractor listed2026-11-05
#300-1401 W 8th Avenue Interior alterations to provide tenant improvements to this existing Radio Communication Station to add one meeting room within unit #300 on the 3rd level of this existing commercial building on this site. Okay for FR as per City staff · Multigroup Enterprise Corp2026-11-05
Exterior alterations for targeted building envelope repairs to the south roof deck membrane in this existing multiple dwelling building on this site. The scope includes to remove and replace the sanitary piping on this roof deck. Ok for Field review per City staff · no contractor listed2026-11-04