Permit GopherAlberta and B.C. property, permit and zoning records

1001 Robson St, Vancouver

An address in West End, Vancouver, zoned DD (Comprehensive Development). 2 building permits are on file, most recently “Exterior and interior alterations to provide tenant improvements for a new retail tenant …” (issued 5 March 2025). The City's 2026 assessed value is $33,099,000.

Zoning
DD · Comprehensive Development
Neighbourhood
West End
Permits on file
2
Assessed value (2026)
$33,099,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 1001 Robson St, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Vancouver's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – Vancouver.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (59153483, 869 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
869
Households
375
Median age
41.2
Median household income (2020)
$73,000
Own their home
47%
Vancouver: 45%
Average household size
1.7
Under 15
6%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-03-05 Exterior and interior alterations to provide tenant improvements for a new retail tenant on the ground floor of this existing commercial building on this site. Appeal no. Z36216 was heard by the Board of Variance on January 14, 2025 and was allowed thereby granting a zoning relaxation of Section 14.3 from the Zoning and Development By-law. Subject to the following conditions: 1) That the development shall otherwise comply with the requirements and regulations of the Zoning and Development By-law to the satisfaction of the Director of Planning. Okay for DB for Exterior alterations to the storefront per City stafff work includes the following: 1) Re & Re of mechanical roof top units. New mechanical units are of similar physical size, providing equivalent cooling loads, and utilizing the existing roof openings. 2) Exterior alterations to alter the existing storefront to include the following: new cladding and stucco finish, re & re of glass canopies. 3) Related to Building Permit no. BP-2024-04592. 3) Separate permits required for all sign and awnings. · $1,910,000
    3469051 Canada Inc
    Issued
  2. 2025-01-21 Interior alterations to combine #1001 (Retail - E) and #1009 (Retail - E) on the ground floor of this existing commercial building on this site. Scope of work: To demolish partition wall separating unit and to bring the space to a shell. Subsequent Permits will be required for tenant improvements Related to permit DB-2024-04706 Addressing Note: 1009 Robson St has been cancelled and is to be removed from the building. 1001 Robson St is to be posted on the building and clearly visible from the street prior to final inspection. OK for Field Review per City staff · $100,000
    no contractor listed
    Issued

The City of Vancouver publishes permits when they are issued and does not show whether the work was completed, so every Vancouver permit shows as Issued with its issue date.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in West End

1090 W Georgia St
#650 - 6th floor Interior alterations to provide improvements to this existing vacant office space on the 6th floor (#650) of this existing commercial building on this site. Scope of work; remove 2 walls. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1090 W Georgia St
#600 - 6th floor - ( demising into #600 and #660) Interior alterations to the 6th floor to demise unit 600 (to be #600 and #660) and provide improvements to #660 in this existing commercial building. Scope of work; demo to north half of suite and construct a demising wall, and partition walls for new layout. Electrical, plumbing, & Sprinklers to suit. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). · Makcom Construction Ltd
2026-10-30
1030 W Georgia St
Unit 600: Interior alterations to remove the existing convenience stair between 5th & 6th floor in this existing commercial building. BRB notes: -To infill the existing convenience stair opening with new structural floor assembly maintaining fire separation with 2h F.R.R. - Separate building permit and sprinkler trades permit will be required for other tenant improvement works on the 6th floor for any alterations/reconfigurations of floor space. - This application is reviewed under VBBL 2025. · Aura Office Environments Inc
2026-10-30
Something wrong on this page? Tell us and we'll check it against the City's records.