Help: Weekly permits
What this page does
This page lists every building permit Red Deer issued in one week, with the total value, a count by trade and the full list with address, work, company and value. A new week is published every Monday. Free, no account.
How to use it
- Use ← Week of … and Week of … → to move to the week before or after.
- Permits by trade shows which kinds of work led the week. A permit with several trades is counted once, under its main trade.
- Scroll to All permits and click an address to open its page.
- To get this page by email every Monday, use Get the digest every Monday at the bottom: enter your email, tick the box and press Subscribe, then click the link we email you. Free; every email has an unsubscribe link.
- Need filters by trade and value, alerts or CSV? That's the permit feed.
Red Deer building permits, week of 21 September 2026
The City of Red Deer issued 33 building permits between 21 and 27 September 2026, worth $3.9M in all. Renovation led with 12 permits, then solar with 8 and new build with 6. Clearview Ridge and Timberlands were the busiest neighbourhoods.
Permits by trade
| Trade | Permits | Bar |
|---|---|---|
| Renovation | 12 | |
| Solar | 8 | |
| New build | 6 | |
| Garage or shed | 4 | |
| Deck | 1 | |
| Addition | 1 |
Watch a neighbourhood
Get one email each Monday with that neighbourhood's permits. Free.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Need filters by trade and value, alerts and CSV export? The permit feed is $29 a month for every city we cover →
All 33 permits
| Issued | Address | Work | Contractor or applicant | Value |
|---|---|---|---|---|
| 2026-09-25 | 3020 22 St, Unit 410 Aspen Ridge |
Space being converted from unknown previous/demised. Into office/clinical setting. Renovation Commercial | ROOTED QUARTERS INC | $250,149 |
| 2026-09-25 | 116 Garrison Cir Garden Heights |
DETACHED DWELLING - Basement development including 1 bedroom, 1 bathroom, 1 office and 1 living area with a dry bar. Renovation Basement Plumbing | JENCOR CONTRACTING INC. | $23,281 |
| 2026-09-25 | 19 Edwards Cr Eastview Estates |
SOLAR - Installation of a roof mounted solar PV array, critter guard, and home energy monitoring system Solar | CBI SOLAR | — |
| 2026-09-25 | 21 Thatcher Av Timberlands |
DECK - Construction of a new 10 ft x 15 ft residential rear deck, approximately 24 inches above grade, with stairs and guard. Deck | KALASKE CONSTRUCTION | — |
| 2026-09-25 | 14 Glass Cl Glendale Park Estates |
SOLAR - roof mounted solar photovoltaic system Solar | ZENO RENEWABLES | — |
| 2026-09-25 | 5207 76 St Normandeau |
SOLAR - installation of roof mounted solar Solar | ZENO RENEWABLES | — |
| 2026-09-25 | 83 Dolan Cl Davenport |
SOLAR - Installation of a roof mounted solar PV array, critter guard, home energy monitoring system. Solar | CBI SOLAR | — |
| 2026-09-24 | 97 O'Brien Cr Oriole Park West |
OTHER - open a back door to access the basement Addition | applicant withheld (individual) | $4,076 |
| 2026-09-23 | 4900 50 St, Unit 800 Downtown |
Demo existing office space, previously demised. Complete new office renovation. Renovation Demolition Commercial | ALL PRO CONSTRUCTION | $209,748 |
| 2026-09-23 | 7721 40 Av Riverside Heavy Industrial Park |
Renovation of the lunch room area in building 300 Renovation Commercial | TIMCON CONSTRUCTION (1988) LTD. | $92,232 |
| 2026-09-23 | 6380 50 Av, Unit 200 Highland Green Estates |
To repair damaged wall that was hit by a car and replace structural column. Renovation Commercial | PCS PROPERTY SERVICES LTD. | $20,000 |
| 2026-09-23 | 5324 44 Av Woodlea |
OTHER - Basement Renovation. The project has been completed by a General Contractor and sub contractors. We have a sale of our home in place with a requirement to pull necessary permits. Renovation Basement | applicant withheld (individual) | $14,112 |
| 2026-09-23 | 44 Oak Dr Oriole Park West |
BASEMENT DEVELOPMENT ONLY - build one additional bedroom in the basement and replace existing drop ceiling to gypsum board Renovation Basement | OPOL'S CONTRACTING SERVICES | $11,760 |
| 2026-09-23 | 45 Daines Av Devonshire |
ACCESSORY BUILDING - Gazebo Garage or shed | applicant withheld (individual) | — |
| 2026-09-22 | 2300 Danielle Dr Davenport |
sectioning off a portion of the interior and adding a service window and office space for community admin to receive documents and payments from residents. Renovation Commercial | CENTRAL ALBERTA CONTRACTING | $67,139 |
| 2026-09-22 | 21 Tillier St, Unit B Timberlands |
SECONDARY SUITE ONLY - Legal basement suite Renovation Basement Secondary suite | STIX AND STONE HOMES INC | $31,215 |
| 2026-09-22 | 2067 50 Av, Unit C Bower |
-installation of new demising wall and new access opening Renovation Commercial | applicant withheld (individual) | $8,298 |
| 2026-09-22 | 48 Emmett Cr Evergreen |
SOLAR - Installation of a flush roof-mounted solar PV system on existing house roof consisting of 8x 500W solar modules and 4x microinverters. Solar | EVOLVSOLAR | — |
| 2026-09-22 | 109 Bell St Bower |
SOLAR - Installation of roof-mounted solar panels Solar | NORTH ENERGY INC | — |
| 2026-09-22 | 17 Holt St Highland Green |
SOLAR - Installation of roof-mounted solar panels Solar | NORTH ENERGY INC | — |
| 2026-09-21 | 115 Caribou Cr, Unit 15 Clearview Ridge |
MULTI ATTACHED - 15 115 Caribou Cr - Stacked Townhome consisting of 12 units New build | SORENTO CUSTOM HOMES LTD. | $1,185,498 |
| 2026-09-21 | 115 Caribou Cr, Unit 1 Clearview Ridge |
MULTI ATTACHED - Units 1 - 4B 115 Clearview Cr - Stacked Townhouse New build | SORENTO CUSTOM HOMES LTD. | $765,203 |
| 2026-09-21 | 115 Caribou Cr, Unit 5 Clearview Ridge |
MULTI ATTACHED - Units 5 - 8B - 8 Units in a Stacked townhome New build | SORENTO CUSTOM HOMES LTD. | $765,203 |
| 2026-09-21 | 22 Cedar Cl Clearview Ridge |
DETACHED DWELLING - lot 18, block 1, Plan 262 1590 1216 sq ft single family dwelling, 816 sq ft developed basement, double car garage, New build | TRUE-LINE CONTRACTING LTD. | $125,747 |
| 2026-09-21 | 18 Cedar Cl Clearview Ridge |
DETACHED DWELLING - Lot 19 Block 1 Plan 262 1590 1216 sq ft single family dwelling, 816 sq ft developed basement, double attached garage New build | TRUE-LINE CONTRACTING LTD. | $125,747 |
| 2026-09-21 | 11 Tipping Av Timberlands |
OTHER - Construction of brand-new bi-level house 1260 sq ft with unfinished basement. New build | 2653756 AB LTD | $100,584 |
| 2026-09-21 | 100 Donald Bl Red Deer Polytechnic |
Decommissioning of existing on campus bank branch which includes removal of interior walls, furniture, portion of flooring, ceiling, mechanical and electrical fixtures as required. Providing new flooring and ceiling wherever demolished. Renovation Demolition HVAC Electrical Commercial | applicant withheld (individual) | $50,042 |
| 2026-09-21 | 59 Duval Cr Davenport |
ACCESSORY BUILDING - Detached garage 24x26 Garage or shed | applicant withheld (individual) | $11,015 |
| 2026-09-21 | 203 Lindsay Av Lancaster Green |
ACCESSORY BUILDING - 24x24 Garage Garage or shed | TURNER ON CONSTRUCTION & ELECTRICAL LTD. | $10,167 |
| 2026-09-21 | 10 Sydney Cl Sunnybrook |
DETACHED DWELLING - Upgrade Kitchen Cabinets Renovation | TAG CONSTRUCTION | $9,532 |
| 2026-09-21 | 5524 35 St West Park |
ACCESSORY BUILDING - 18 x 20 Detached garage Garage or shed | CALL FORWARD RENOVATIONS | $6,355 |
| 2026-09-21 | 121 Connaught Cr Clearview Ridge |
OTHER - Temporary 32' tunnel for Trick r Treaters to walk through for Halloween | applicant withheld (individual) | — |
| 2026-09-21 | 261 Carrington Dr Clearview Ridge |
SOLAR - Installation of roof-mounted solar panels Solar | NORTH ENERGY INC | — |