Help: Weekly permits
What this page does
This page lists every building permit Red Deer issued in one week, with the total value, a count by trade and the full list with address, work, company and value. A new week is published every Monday. Free, no account.
How to use it
- Use ← Week of … and Week of … → to move to the week before or after.
- Permits by trade shows which kinds of work led the week. A permit with several trades is counted once, under its main trade.
- Scroll to All permits and click an address to open its page.
- To get this page by email every Monday, use Get the digest every Monday at the bottom: enter your email, tick the box and press Subscribe, then click the link we email you. Free; every email has an unsubscribe link.
- Need filters by trade and value, alerts or CSV? That's the permit feed.
Red Deer building permits, week of 20 July 2026
The City of Red Deer issued 22 building permits between 20 and 26 July 2026, worth $2.8M in all. Renovation led with 9 permits, then new build with 6 and commercial with 2. Timber Ridge and Vanier East were the busiest neighbourhoods.
Permits by trade
| Trade | Permits | Bar |
|---|---|---|
| Renovation | 9 | |
| New build | 6 | |
| Commercial | 2 | |
| Solar | 2 | |
| Garage or shed | 1 | |
| Demolition | 1 | |
| Deck | 1 |
Watch a neighbourhood
Get one email each Monday with that neighbourhood's permits. Free.
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Need filters by trade and value, alerts and CSV export? The permit feed is $29 a month for every city we cover →
All 22 permits
| Issued | Address | Work | Contractor or applicant | Value |
|---|---|---|---|---|
| 2026-07-24 | 20 Thomlison Av, Unit Bldg 3000 Timber Ridge |
Construction of Phase 1 of a 2 Phase building (BLDG E). Phase 1 is 8,325 sqft. Commercial | PHOENIX CONSTRUCTION INC | $1,200,773 |
| 2026-07-24 | 229 Turnbull Cl Timber Ridge |
Detached dwelling - single family detached dwelling with front attached garage, basement development and rear deck New build | LAEBON HOMES | $209,196 |
| 2026-07-24 | 26 Turnbull Cl Timber Ridge |
Detached dwelling - single family dwelling with front attached garage and rear deck. New build | LAEBON HOMES | $148,094 |
| 2026-07-24 | 22 Fern Rd Fairview |
DETACHED DWELLING - Construct a new 3 piece basement basement bathroom and Hallway. Renovation Basement Plumbing | applicant withheld (individual) | $2,861 |
| 2026-07-24 | 20 Thomlison Av, Unit Bldg 6000 Timber Ridge |
Building permit for temporary building on skids for sale of fresh vegetables, open April-Dec Commercial | RUBEN'S VEGGIES | — |
| 2026-07-23 | 4900 Molly Banister Dr, Unit 204 Bower |
New Service Area millwork front & back counters, new wall tile, new menu boards, storefront signage, & millwork hood bulkhead finish to replace existing. New Service Area door in existing frame. New Service Area & Back Area lighting. Renovation Signage Commercial | applicant withheld (individual) | $92,035 |
| 2026-07-23 | 28 Macfarlane Av Morrisroe |
BASEMENT DEVELOPMENT ONLY - Basement development (finished basement already but need permit) Renovation Basement | applicant withheld (individual) | $31,996 |
| 2026-07-23 | 5310 42 Av Woodlea |
SECONDARY SUITE ONLY - Add a house suite to the existing basement development within the structure, including a kitchen, common area and entrance. Renovation Basement Secondary suite | applicant withheld (individual) | $21,226 |
| 2026-07-23 | 135 Inglewood Dr Inglewood West |
BASEMENT DEVELOPMENT ONLY - Finish basement by building a family room, bedroom, bathroom, utility room. Renovation Basement Plumbing | applicant withheld (individual) | $16,908 |
| 2026-07-23 | 96 Grant St Glendale Park Estates |
SOLAR - Installation of roof-mounted solar panels Solar | NORTH ENERGY INC | — |
| 2026-07-22 | 45 Tranter St, Unit B Timberlands |
BASEMENT DEVELOPMENT ONLY - Development of a legal secondary basement suite, including bedrooms, bathroom, laundry, kitchen and living area. Separate plumbing, heating/ventilation, and electrical systems and required safety systems. Renovation Basement Secondary suite HVAC Plumbing Electrical | KALASKE CONSTRUCTION | $14,775 |
| 2026-07-22 | 72 Joice Cl Johnstone Park |
ACCESSORY BUILDING - Detached Garage Garage or shed | RAPONI CONTRACTING | $10,167 |
| 2026-07-22 | 3714 45 St Eastview |
SOLAR - Installation of solar panels on existing residential roof. AC system size 3.2 DC system size 4.4 Solar | FLUENT SOLAR LTD | — |
| 2026-07-22 | 6739 67 Av Golden West |
Building permit for a Demolition Demolition Commercial | AGGREGATE DESIGN STUDIO | — |
| 2026-07-21 | 144 Ellington Cr Evergreen |
DETACHED DWELLING - new single family house construction New build | ALORA HOMES LTD. | $202,769 |
| 2026-07-21 | 21 Landsdown Cl Vanier East |
MULTI ATTACHED - To construct a Multi-Attached Triplex. New build | SEHJAS HOMES LTD | $139,427 |
| 2026-07-21 | 19 Landsdown Cl Vanier East |
MULTI ATTACHED - To construct a Multi-Attached Triplex. New build | SEHJAS HOMES LTD | $127,433 |
| 2026-07-21 | 17 Landsdown Cl Vanier East |
MULTI ATTACHED - To construct a Multi-Attached Triplex. New build | SEHJAS HOMES LTD | $123,945 |
| 2026-07-21 | 37 Burnt Basin St, Unit B7 East Burnt Lake |
Interior renovation to convert existing washroom and laundry rooms into 2 washrooms with showers, with minor storage-room modifications and relocation of laundry/sink/work-bench. Renovation Plumbing Commercial | CALANAH BUILDERS LTD | $123,587 |
| 2026-07-21 | 4934 54 Av Railyards |
Sea Can Renovation Commercial | applicant withheld (individual) | $8,790 |
| 2026-07-21 | 31 Revie Cl Rosedale Meadows |
DECK - Build deck off rear of dwelling Deck | DAVEX CONSTRUCTION LTD. | — |
| 2026-07-20 | 5579 47 St, Unit 18 Capstone |
The development is a +/- 75.1 sqm gross area Phase 2 tenant improvement to enhance service capacity and improve functionality for the BVCU [name withheld] branch. Includes interior renovation and exterior wall alterations to an existing tenant space. Renovation Commercial | applicant withheld (individual) | $362,007 |