Permit GopherAlberta and B.C. property, permit and zoning records

4914 48 Av, Red Deer

An address in Downtown, Red Deer, zoned C-1 (City Centre Commercial Zone). 22 building permits are on file, most recently “ACCESSORY BUILDING - Construction of a new 2 car detached garage” (issued 8 January 2025). Assessed values for Red Deer are not in our data.

Zoning
C-1 · City Centre Commercial Zone
Neighbourhood
Downtown
Permits on file
22
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown.
Aerial photo around 4914 48 Av, with the address marked
Address point from the City of Red Deer's open data, on the City's latest open aerial photo.

What this zoning allows

C-1 · City Centre Commercial Zone. An active, compact, mixed-use area that serves the City and the region: commercial, high-density residential, offices, institutional, cultural, entertainment and recreational uses.

Permitted Apartment; Mixed-Use Building; Merchandise Sales and Rentals; Restaurant; Professional Office; Hotel; Health and Medical Services; Commercial Service Facility; and 28 more

Discretionary Cannabis Retail Sales; Drinking Establishment; Late Night Club; Gaming or Gambling Establishment; Motor Vehicle Sales, Service, or Repair; Parking Lot; Service Station; Transportation Services; and 10 more

Maximum height
None set (at least 8.5 m to the eave)
Front setback
0.0 m for commercial; residential at most 3.0 m
Side setback
0.0 m; 1.5 m beside a lane; 3.0 m beside an R-L, R-W or R-N site
Rear setback
1.5 m
Secondary suite
Not listed

Setbacks subject to subsection 3.200.3. No dwelling units on the main floor in the downtown core area (7.10.7). Buildings over 12 storeys go to the Municipal Planning Commission. No site coverage maximum is set in this section. Setbacks are minimums unless a maximum is stated.

Summary of the City of Red Deer Zoning Bylaw 3357/2024 (amended to 23 October 2026), section 7.10, as read on 30 October 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48080140, 760 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
760
Households
485
Median age
59.6
Median household income (2020)
$50,400
Own their home
54%
Red Deer: 65%
Average household size
1.5
Under 15
4%
65 and over
42%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-01-08 ACCESSORY BUILDING - Construction of a new 2 car detached garage · $6,778
    applicant withheld (individual)
    Closed
  2. 2024-05-28 IT Department Reno - City of [name withheld] · $13,500
    SCOTT BUILDERS INC.
    Closed
  3. 2023-03-08 Remove and install steel stud walls and curtain walls on second floor mayors office area. · $30,000
    RBW CONSULTING (2015) LTD.
    Closed
  4. 2020-06-23 Building permit for City Hall renovation including partial envelope rehab (3rd and 4th floors), exterior wall/window retrofit · $1,918,000
    TIMCON CONSTRUCTION (1988) LTD.
    Closed
  5. 2019-03-04 Building permit for City Hall 2nd Floor Washroom Renovations · $62,500
    RBW CONSULTING (2015) LTD.
    Closed
  6. 2019-02-12 Building permit FOR A 20' X 40' TEMPORARY TENT TO BE SET UP ON FRIDAY, FEBRUARY 15, 2019 UNTIL MARCH 3, 2019 FOR LITTLE GAETZ FAMILY FUN · $5,000
    THE CITY OF RED DEER - COMMUNICATIONS
    Closed
  7. 2017-07-05 Building permit TO CONSTRUCT INTERIM WHEELCHAIR RAMP IN ORDER TO INSTALL PERMANENT PRE-CAST WHEELCHAIR RAMP · $165,983
    SCOTT BUILDERS INC.
    Closed
  8. 2017-06-26 Building permit for THE INSTALLATION OF A SUMP PIT AND UPGRADE TO EXISTING ELEVATOR SPACE · $276,266
    SCOTT BUILDERS INC.
    Closed
  9. 2017-06-01 Building permit for RENOVATION OF MAIN FLOOR WASHROOMS · $50,000
    PHOENIX CONSTRUCTION INC
    Closed
  10. 2017-05-12 Building permit for City Hall 3rd floor renovation including addition of two small offices and divide a meeting room to make two smaller rooms. · $15,000
    THE CITY OF RED DEER
    Closed
  11. 2016-11-10 Building permit TO UPGRADE EXISTING FIRE ALARM SYSTEM AT CITY HALL · $479,185
    SCOTT BUILDERS INC.
    Closed
  12. 2014-12-09 2nd Floor City Hall Reno's · $200,000
    PHOENIX CONSTRUCTION INC
    Closed
  13. 2014-01-08 Interior Renovations - Main floor and 1 office on 2nd floor · $50,000
    no contractor listed
    Closed
  14. 2007-12-07 Section of East Stairway-CITY HALL · $4,000
    no contractor listed
    Closed
  15. 2006-01-12 Public Building Renovations - City Hall Renovations for Basement to Fourth Floor
    no contractor listed
    Closed
  16. 2003-12-04 Main Floor Renovation Assessment And Taxes
    no contractor listed
    Closed
  17. 2003-10-01 PUBLIC BUILDING ( RENOVATION) - 4th Floor Renovations
    no contractor listed
    Closed
  18. 2003-09-02 COMMERCIAL BUILDING (RENOVATIONS) - City Hall Basement Coffee Room & maintenance area
    no contractor listed
    Closed
  19. 2003-04-16 RENOVATION)- Third Flr. - Personnel Dept.
    no contractor listed
    Closed
  20. 2003-01-28 Renovate the basement of city hall
    no contractor listed
    Closed
  21. 2002-12-05 Public building ( asbestos removal)
    no contractor listed
    Closed
  22. 2002-12-03 COMMERCIAL - Basement Renovations to City Hall
    no contractor listed
    Closed

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

5114 48 St
Building permit for Latin American Restaurant & Pub · applicant withheld (individual)
2026-11-03
4920 51 St
Installation of emergency egress hardware in three locations at the [name withheld] Provincial Building. · applicant withheld (individual)
2026-10-30
4607 52 St
SOLAR - Installation of a roof mounted solar PV array, critter guards, and home energy monitoring system · CBI SOLAR
2026-10-23
Something wrong on this page? Tell us and we'll check it against the City's records.