Permit GopherAlberta and B.C. property, permit and zoning records

9604 76 Avenue NW, Edmonton

An address in Ritchie, Edmonton, zoned MU (Mixed Use). 5 building permits are on file, most recently “To construct interior alterations within commercial building - tenant improvement - reloc…” (issued 16 July 2020). 4 development permits are on file too. The City's 2026 assessed value is $2,832,500. The City of Edmonton does not publish contractor names.

Zoning
MU · Mixed Use
Neighbourhood
Ritchie
Permits on file
5
+ 4 development
Assessed value (2026)
$2,832,500
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 9604 76 Avenue NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

What this zoning allows

MU · Mixed Use. Mixed use development at varying scales in the nodes and corridors named in statutory plans: housing, recreation, commerce and employment, with buildings designed for pedestrians.

Permitted Residential (limited to Lodging House, Multi-unit Housing, Row Housing, Secondary Suite, Supportive Housing); Food and Drink Service; Indoor Sales and Service; Office; Health Service; Hotel; Minor Indoor Entertainment; Child Care Service; and 20 more

Maximum height
Set by the height modifier on the zoning map (the number after "h", in metres)
Front setback
1.0 m minimum; 3.0 m maximum for ground-floor non-residential uses; 4.5 m for ground-floor housing (3.0 m with a treed boulevard)
Side setback
3.0 m from an abutting site; 0 m up to 23.0 m high beside a commercial or main street site; 6.0 m above 23.0 m
Rear setback
0 m from an alley; 1.0 m where the alley is under 6.0 m wide; 3.0 m above 16.0 m
Secondary suite
Permitted

This zone lists permitted uses only. The bylaw sets setbacks by what the site abuts (a street, an alley or another site); shown here as front, side and rear. Floor area ratio set by the "f" modifier on the zoning map. The page shows the zone without its modifiers. Varies. Setbacks are minimums unless a maximum is stated.

Summary of the City of Edmonton Zoning Bylaw 20001 (amended to 22 September 2026), section 2.80, as read on 30 October 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48110838, 597 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
597
Households
245
Median age
36.4
Median household income (2020)
$107,000
Own their home
69%
Edmonton: 64%
Average household size
2.2
Under 15
15%
65 and over
9%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2020-07-16 To construct interior alterations within commercial building - tenant improvement - relocating existing bakeshop within building · $30,000
    contractor not published by the City
    Issued
  2. 2019-12-27 To construct interior alteration - tenant fit up including addition of storage room and renovated kitchen area- Doughnut Party Ritchie Plaza · $60,000
    contractor not published by the City
    Issued
  3. 2019-06-12 To construct interior alterations (add walls to create 2 doctor offices) · $11,000
    contractor not published by the City
    Issued
  4. 2019-01-17 To construct interior alterations to an existing building for Richie Pharmacy. · $30,000
    contractor not published by the City
    Issued
  5. 2017-02-27 To construct exterior alterations to a commercial building, (facade improvement, south & east elev.). · $600,000
    contractor not published by the City
    Issued

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2019-04-29 To Add Health Services (Doctors Office) to an existing Convenience Retail Store (Pharmacy) and to construct interior alterations (wall to pharmacy from doctor's clinic)
    Alterations Major Development Permit · City file 310226256-001
    Approved
  2. 2018-10-25 To change the Use from Professional, Financial and Office Support Services (Suite 9616) and portion of General Retail Store (Suite 9614) to Convenience Retail Store and construct Interior Alterations.
    Change of use Major Development Permit · City file 296127791-001
    Approved
  3. 2016-07-06 To construct exterior alterations to a commercial building (facade improvement)
    Alterations Major Development Permit · City file 225420420-001
    Approved
  4. To change the use from Indoor Sales and Service to an Minor Indoor Entertainment use (birthday party place) and to construct interior alterations
    Change of use Major Development Permit · City file 664013222-002
    Other

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Ritchie

9330 72 Avenue NW
To demolish a Residential Use building (Single Detached House) and an Accessory building (detached Garage). · contractor not published by the City
2026-10-29
9647 73 Avenue NW
To install a Renewable Energy Device On a House (26 Solar PhotoVoltaic (PV) Panel(s) on the Roof). · contractor not published by the City
2026-10-29
9847 80 Avenue NW
To demolish a detached Garage. · contractor not published by the City
2026-10-27
Something wrong on this page? Tell us and we'll check it against the City's records.