Permit GopherAlberta and B.C. property, permit and zoning records

9303 160 Avenue NW, Edmonton

An address in Eaux Claires, Edmonton, zoned RSM (Small-Medium Scale Transition Residential). 17 building permits are on file, most recently “To construct a Residential Use building (8 unit row house, Units 55-62) with attached Gar…” (issued 30 June 2025). 1 development permit is on file too. The City's 2026 assessed value is $3,310,000. The City of Edmonton does not publish contractor names.

Zoning
RSM · Small-Medium Scale Transition Residential
Neighbourhood
Eaux Claires
Permits on file
17
+ 1 development
Assessed value (2026)
$3,310,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 9303 160 Avenue NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

What this zoning allows

RSM · Small-Medium Scale Transition Residential. Small to medium scale row housing and multi-unit housing up to 3 or 4 storeys, usually as a transition between smaller and larger development; detached, semi-detached and duplex housing only as part of a larger development.

Permitted Residential (includes Secondary Suite and Backyard Housing); Food and Drink Service; Health Service; Indoor Sales and Service; Office; Residential Sales Centre; Child Care Service; Community Service; and 2 more

Maximum height
12.0 m or 14.0 m, by the height modifier on the zoning map (h12, h14)
Front setback
4.5 m; 3.0 m with a treed boulevard and alley access
Side setback
1.2 m; 1.5 m where row or multi-unit housing faces the lot line; flanking side 2.0 m
Rear setback
5.5 m
Maximum site coverage
60 %
Secondary suite
Permitted

This zone lists permitted uses only. Minimum density 45 dwellings per hectare. The page shows the zone without its height modifier. Varies. Setbacks are minimums unless a maximum is stated.

Summary of the City of Edmonton Zoning Bylaw 20001 (amended to 22 September 2026), section 2.30, as read on 30 October 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48112330, 1,113 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,113
Households
430
Median age
37.6
Median household income (2020)
$90,000
Own their home
72%
Edmonton: 64%
Average household size
2.8
Under 15
15%
65 and over
14%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-06-30 To construct a Residential Use building (8 unit row house, Units 55-62) with attached Garages and Balconies. Block 4 · $1,430,125
    contractor not published by the City
    Issued
  2. 2025-06-02 To construct a 6 Dwelling Row House with Garages, unenclosed front porches and uncovered decks (Bldg #14, 6 units (74-79)). · $1,092,000
    contractor not published by the City
    Issued
  3. 2025-05-29 To construct a Residential Use buildings with attached Garages and Balconies in the form of Cluster Housing (Building 1, Units 12-17). · $1,178,125
    contractor not published by the City
    Issued
  4. 2025-05-29 To construct a Residential Use building (5 unit row house, Units 80-84) with attached Garages and Balconies. Block 10 · $923,000
    contractor not published by the City
    Issued
  5. 2025-05-22 To construct a Residential Use building (6 unit row house, Units 63-68) with attached Garages and Balconies. Block 5 · $1,121,500
    contractor not published by the City
    Issued
  6. 2025-05-22 To construct a Residential Use building (5 unit row house, Units 85-89) with attached Garages and Balconies. Block 6 · $923,000
    contractor not published by the City
    Issued
  7. 2025-05-22 To construct a Residential Use building (4 unit row house, Units 90-93) with attached Garages and Balconies. Block 7 · $783,375
    contractor not published by the City
    Issued
  8. 2025-05-22 To construct a Residential Use building (5 unit row house, Units 69-73) with attached Garages and Balconies. Block 11 · $923,000
    contractor not published by the City
    Issued
  9. 2025-05-22 To construct a Residential Use building (4 unit row house, Units 94-97) with attached Garages and Balconies. Block 9 · $783,375
    contractor not published by the City
    Issued
  10. 2025-05-21 To construct a Residential Use buildings with attached Garages and Balconies in the form of Cluster Housing (Building 15, Units 98-100). · $553,750
    contractor not published by the City
    Issued
  11. 2025-05-20 To construct a Residential Use buildings with attached Garages and Balconies in the form of Cluster Housing (Building 3, Units 1-6). · $1,072,750
    contractor not published by the City
    Issued
  12. 2025-05-20 To construct a Residential Use development in the form of Cluster Housing (Bldg #16, 7 units (25-31)). · $1,289,625
    contractor not published by the City
    Issued
  13. 2025-05-15 To construct a Residential Use development in the form of Cluster Housing (Bldg #17, 6 units 32-37). · $1,083,500
    contractor not published by the City
    Issued
  14. 2025-04-03 To construct a Residential Use development in the form of Cluster Housing (Bldg #8, 7 units(18-24)). · $1,230,125
    contractor not published by the City
    Issued
  15. 2025-04-01 To construct a Residential Use development in the form of Cluster Housing (Building 13, Units 44-48). · $982,375
    contractor not published by the City
    Issued
  16. 2025-04-01 To construct a Residential Use building in the form of a 6 Dwelling Row House with Garages, unenclosed front porches and uncovered decks (Building 18, Units 38-43). · $1,083,500
    contractor not published by the City
    Issued
  17. 2025-03-28 To construct a Residential Use buildings with attached Garages and Balconies in the form of Cluster Housing (Building 2, Units 7-11). · $917,625
    contractor not published by the City
    Issued

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2024-08-30 To construct 18 Residential Use buildings in the form of Cluster Housing with a total of 100 Dwellings.
    New building Major Development Permit · City file 469939437-002
    Approved

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Eaux Claires

9415 154 Avenue NW
To construct a FOUNDATION ONLY for future 6 storey mixed use building. "3 Robins at Eaux Claires" · contractor not published by the City
2026-10-27
9603 165 Avenue NW
To deconstruct the exterior garden center structure, exterior canopy, interior office area and miscellaneous selective demolition at the former Rona Building. (Kentwood Ford Relocation Project) · contractor not published by the City
2026-09-29
9235 156 Avenue NW
To construct a Residential Use building in the form of a Single Detached House with a front attached Garage, unenclosed front porch, Secondary Suite, and rear uncovered deck. · contractor not published by the City
2026-08-26
Something wrong on this page? Tell us and we'll check it against the City's records.