Permit GopherAlberta and B.C. property, permit and zoning records

7104 144 Avenue NW, Edmonton

An address in Kilkenny, Edmonton, zoned PS (Parks and Services). 3 building permits are on file, most recently “To construct an addition (4 Modular classrooms on the East portion of the School) to the …” (issued 18 August 2026). 3 development permits are on file too. The City's 2026 assessed value is $7,253,000. The City of Edmonton does not publish contractor names.

Zoning
PS · Parks and Services
Neighbourhood
Kilkenny
Permits on file
3
+ 3 development
Assessed value (2026)
$7,253,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 7104 144 Avenue NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48110319, 649 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
649
Households
235
Median age
30.6
Median household income (2020)
$72,000
Own their home
57%
Edmonton: 64%
Average household size
2.9
Under 15
28%
65 and over
6%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-08-18 To construct an addition (4 Modular classrooms on the East portion of the School) to the existing school building - Londonderry School. · $300,000
    contractor not published by the City
    Issued
  2. 2026-05-25 To construct Interior Alterations to an existing school. Install maglock delayed egress to interaction classroom doors 117 & 118, construct new sensory rooms 117a & 118a, deconstruct male & female washrooms, construct a janitor room and a G/N washroom with 1 interactions stall, 9 gender neutral stalls, 1 limited mobility stall and 3 gender neutral barrier free stalls. "Londonderry School Interaction Establishment” · $600,000
    contractor not published by the City
    Issued
  3. 2025-03-13 Exterior Alterations to install 238.9 kW DC Rooftop solar Array on Building. "EPSB Londonderry School" · $160,000
    contractor not published by the City
    Issued

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2025-04-07 To construct a School building (six portables) on an existing School site (Londonderry School).
    New building Major Development Permit · City file 546761007-002
    Approved
  2. 2023-06-06 To construct exterior alterations to a Public Education Service Site (upgrades/resurfacing of the existing basketball courts at Londonderry School).
    Alterations Major Development Permit · City file 471115855-002
    Approved
  3. To construct exterior alterations on a School building (Rooftop Solar Collectors)
    Alterations Major Development Permit · City file 566521545-002
    Other

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Kilkenny

14908 77 Street NW
To construct interior alterations (Sump Pit installation, NOT to be used as an additional Dwelling). · contractor not published by the City
2026-10-26
15227 73 Street NW
To install a Renewable Energy Device On a House (10 Solar PhotoVoltaic (PV) Panel(s) on the Roof). · contractor not published by the City
2026-10-19
7511 152A Avenue NW
To erect a Privacy Screen at 2.3m in Height in the Interior Side Yard. · contractor not published by the City
2026-10-14
Something wrong on this page? Tell us and we'll check it against the City's records.