Permit GopherAlberta and B.C. property, permit and zoning records

5530 Schonsee Drive NW, Edmonton

An address in Schonsee, Edmonton, zoned RM (Medium Scale Residential). 4 building permits are on file, most recently “To construct an apartment over existing parkade - Schonsee Apartments, building A. ( 5530…” (issued 8 April 2021). 2 development permits are on file too. The City's 2026 assessed value is $43,775,500. The City of Edmonton does not publish contractor names.

Zoning
RM · Medium Scale Residential
Neighbourhood
Schonsee
Permits on file
4
+ 2 development
Assessed value (2026)
$43,775,500
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 5530 Schonsee Drive NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

What this zoning allows

RM · Medium Scale Residential. Multi-unit residential development of about 4 to 8 storeys; detached, semi-detached and duplex housing only as part of a larger development; limited community and commercial uses that serve local residents.

Permitted Residential (includes Secondary Suite and Backyard Housing); Food and Drink Service; Health Service; Indoor Sales and Service; Minor Indoor Entertainment; Office; Child Care Service; Community Service; and 6 more

Maximum height
16.0 m, 23.0 m or 28.0 m, by the height modifier on the zoning map (h16.0, h23.0, h28.0)
Front setback
4.5 m from a street; 3.0 m with a treed boulevard; 1.0 m for a main street development
Side setback
3.0 m from an abutting site; 1.5 m interior side for a building up to 12.0 m high
Rear setback
3.0 m from an alley or an abutting site
Secondary suite
Permitted

This zone lists permitted uses only. The bylaw sets setbacks by what the site abuts (a street, an alley or another site); shown here as front, side and rear. Floor area ratio 2.3, 3.0 or 3.8 with the height modifier. A building over 12.0 m high needs 3.0 m to 9.0 m from a residential zone of 12.0 m or less. The page shows the zone without its height modifier. Varies. Setbacks are minimums unless a maximum is stated.

Summary of the City of Edmonton Zoning Bylaw 20001 (amended to 22 September 2026), section 2.40, as read on 30 October 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48112507, 1,739 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
1,739
Households
620
Median age
32.8
Median household income (2020)
$111,000
Own their home
94%
Edmonton: 64%
Average household size
2.9
Under 15
26%
65 and over
7%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2021-04-08 To construct an apartment over existing parkade - Schonsee Apartments, building A. ( 5530 - Schonsee Dr. NW) · $21,019,250
    contractor not published by the City
    Issued
  2. 2021-04-01 To construct an apartment over existing parkade - Schonsee Apartments, building B. ( 5538 - Schonsee Dr. NW) · $12,564,300
    contractor not published by the City
    Issued
  3. 2021-02-05 To construct a partial permit ( Structural Frame ONLY for Building A) over existing parkade - Schonsee Apartments, building A. ( 5530 - Schonsee Dr. NW) · $15,000
    contractor not published by the City
    Issued
  4. 2020-10-08 To construct an UNDERGROUND PARKADE/FOUNDATION common to two future apartment buildings - Schonsee Apartments. · $6,025,950
    contractor not published by the City
    Issued

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2021-02-24 To reduce the Bicycle Spaces to 42 instead of the minimum required 94 for a Multi-unit Housing (2 Apartment Buildings, total of 188 dwellings).
    Other Major Development Permit · City file 363107083-031
    Approved
  2. 2020-08-25 To construct 188 Dwellings of Multi-unit Housing (2 Apartment Buildings).
    New building Major Development Permit · City file 363107083-002
    Approved

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Schonsee

17208 71 Street NW
To install a Renewable Energy Device On a House (14 Solar PhotoVoltaic (PV) Panel(s) on the Roof). · contractor not published by the City
2026-10-30
16850 67A Street NW
To construct a Residential Use building in the form of a Single Detached House with a front attached Garage, a rear uncovered deck (3.35m x 3.05m) over a walkout Basement, and to develop a Secondary Suite in the Basement. · contractor not published by the City
2026-10-21
6711 168 Avenue NW
To construct a Residential Use building in the form of a Semi-Detached House with an unenclosed front Porch(s), front attached Garage(s) and Secondary Suite(s). · contractor not published by the City
2026-10-20
Something wrong on this page? Tell us and we'll check it against the City's records.