Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the photo to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Under Development permits are the City's decisions on what may be built or how the property may be used (they come before the building permit), with the kind, the date, the stage and the City's file number.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
4051 84 Avenue NW, Edmonton
An address in Morris Industrial, Edmonton, zoned FD (Future Urban Development). 1 building permit is on file, most recently “To construct an accessory building (alterations to steel sea-can for use as office suite …” (issued 14 March 2019). 1 development permit is on file too. The City's 2026 assessed value is $3,290,000. The City of Edmonton does not publish contractor names.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48112107, 48 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2019-03-14
To construct an accessory building (alterations to steel sea-can for use as office suite to sea-can storage yard) "Big Steel Box" , addition of steel screw piling foundation. · $105,000
contractor not published by the City Issued
Development permits
The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.
-
2018-07-30
To develop a Temporary Storage facility (empty seacan storage, maximum 3 levels high - 2.6 m maximum) with an Accessory office trailer, on part of a Site.
Other Major Development Permit · City file 058369106-002 Approved
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Morris Industrial
To construct interior alterations for industrial use. No trade work included within this permit application. Work done without permit. Lynx Emissions. · contractor not published by the City2026-10-29
To construct Interior Alterations (tenant fit-up for an upholstery production and repair) in an existing industrial building. "Phillips Upholstery" · contractor not published by the City2026-07-22
To construct Interior Alterations (HVAC upgrades) for a repair garage in an existing industrial use building. --Nova Auto Detailing-- · contractor not published by the City2024-12-04