Permit GopherAlberta and B.C. property, permit and zoning records

3325 Chernowski Way SW, Edmonton

An address in Chappelle Area, Edmonton, zoned RSF (Small Scale Flex Residential). 2 building permits are on file, most recently “To construct a Rear uncovered deck (4.57m x 3.05m @ 1.00m in Height).” (issued 12 June 2026). 1 development permit is on file too. The City's 2026 assessed value is $859,000. The City of Edmonton does not publish contractor names.

Zoning
RSF · Small Scale Flex Residential
Neighbourhood
Chappelle Area
Permits on file
2
+ 1 development
Assessed value (2026)
$859,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 3325 Chernowski Way SW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

What this zoning allows

RSF · Small Scale Flex Residential. A range of small scale residential development up to 3 storeys, including detached, attached and multi-unit housing, with more flexible site and building rules for new neighbourhoods and large undeveloped areas.

Permitted Residential (includes Secondary Suite and Backyard Housing); Food and Drink Service; Health Service; Indoor Sales and Service; Office; Residential Sales Centre; Child Care Service; Community Service; and 2 more

Maximum height
12.0 m
Front setback
4.5 m; 3.0 m with a treed boulevard and alley access, or for reverse housing
Side setback
1.2 m; 1.5 m where row or multi-unit housing faces the lot line, or beside a zero lot line; flanking side 2.0 m
Rear setback
6.0 m; 1.2 m for a rear attached garage on a site up to 30.0 m deep
Maximum site coverage
55 %
Secondary suite
Permitted

This zone lists permitted uses only. Zero lot line and reduced setback development have their own side setbacks. Varies. Setbacks are minimums unless a maximum is stated.

Summary of the City of Edmonton Zoning Bylaw 20001 (amended to 22 September 2026), section 2.20, as read on 30 October 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48112649, 544 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
544
Households
165
Median age
30.6
Median household income (2020)
$132,000
Own their home
100%
Edmonton: 64%
Average household size
3.0
Under 15
30%
65 and over
3%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-06-12 To construct a Rear uncovered deck (4.57m x 3.05m @ 1.00m in Height).
    contractor not published by the City
    Issued
  2. 2025-04-16 To construct a Residential Use building in the form of a Single Detached House with a front attached Garage, unenclosed front porch, and uncovered deck (4.57m x 3.05m). · $320,250
    contractor not published by the City
    Closed

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2025-03-25 To construct a Residential Use building in the form of a Single Detached House with a front attached Garage, unenclosed front porch, and uncovered deck.
    New house Minor Development Permit · City file 579910210-002
    Approved

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Chappelle Area

4839 Cawsey Terrace SW
To construct an addition (unenclosed Covered Deck, 3.66m x 4.88m ) to a Residential Use building in the form of a Single Detached House. · contractor not published by the City
2026-10-29
4454 Clayton Way SW
To construct a Residential Use building in the form of a Single Detached House with a front attached Garage, Basement development (NOT to be used as an additional Dwelling), uncovered deck (3.05m x 3.05m) and unenclosed front porch. · contractor not published by the City
2026-10-28
4372 Clayton Way SW
To construct a Residential Use building in the form of a Single Detached House with a front attached Garage,8- solar photovoltaic system and unenclosed front porch. · contractor not published by the City
2026-10-26
Something wrong on this page? Tell us and we'll check it against the City's records.