Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the photo to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Under Development permits are the City's decisions on what may be built or how the property may be used (they come before the building permit), with the kind, the date, the stage and the City's file number.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
13808 111 Avenue NW, Edmonton
An address in Woodcroft, Edmonton, zoned UF (Urban Facilities). 6 building permits are on file, most recently “To construct interior and exterior alterations, rehabilitate, renovate and upgrade archit…” (issued 4 December 2023). 2 development permits are on file too. The City's 2026 assessed value is $5,539,000. The City of Edmonton does not publish contractor names.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48111096, 323 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2023-12-04
To construct interior and exterior alterations, rehabilitate, renovate and upgrade architectural, structural, mechanical and electrical systems in an existing public swimming pool building. "Peter Hemingway TP4 Phase 2" · $19,950,368
contractor not published by the City Closed -
2023-10-31
To construct interior alterations (pool mechanical systems upgrades) --"Peter Hemingway TP4"-- · $2,569,821
contractor not published by the City Issued -
2023-05-02
To construct Interior Alterations (renovation of the pool deck area only -phase#1) --"Peter Hemingway Fitness & Leisure Centre"-- · $2,258,247
contractor not published by the City Issued -
2022-07-11
To construct Interior Alterations to an existing leisure center.- Peter Hemmingway Fitness & Leisure Centre · $7,200,000
contractor not published by the City Issued -
2022-01-14
To complete interior alterations (Demolition ONLY of pool tile, demo of mechanical & electrical equipment in the mechanical room) in an existing recreation center. - Peter Hemmingway Leisure Centre NOTE: Demolition of the pool suspended slab NOT included in scope of permit · $350,000
contractor not published by the City Issued -
2010-07-12
To construct interior alterations to a community recreation service building, "Peter Hemingway Pool". · $375,000
contractor not published by the City Issued
Development permits
The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.
-
2026-02-24
To Install a Minor Digital Sign in the form of a Ground Sign limited to On-premises Advertising (City of Edmonton Coronation Recreation Centre).
Sign Sign Permit · City file 641305039-002 Approved -
2023-07-24
To construct exterior and interior alterations to an Indoor Participant Recreation Service building (Peter Hemingway Pool).
Alterations Major Development Permit · City file 475199292-002 Approved
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Woodcroft
To demolish a Residential Use building (Single Detached House). · contractor not published by the City2026-10-22
To construct a Residential Use building in the form of a 4 Dwelling Row House with 4 secondary suites. · contractor not published by the City2026-10-08
To install a Renewable Energy Device On a House (11 Solar PhotoVoltaic (PV) Panel(s) on the Roof). · contractor not published by the City2026-09-21