Permit GopherAlberta and B.C. property, permit and zoning records

11430 68 Street NW, Edmonton

An address in Bellevue, Edmonton, zoned PS (Parks and Services). 8 building permits are on file, most recently “To construct Interior Alterations (new Barrier Free washroom at second floor) to an exist…” (issued 4 December 2025). The City's 2026 assessed value is $12,075,500. The City of Edmonton does not publish contractor names.

Zoning
PS · Parks and Services
Neighbourhood
Bellevue
Permits on file
8
Assessed value (2026)
$12,075,500
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 11430 68 Street NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48110103, 473 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
473
Households
215
Median age
41.6
Median household income (2020)
$85,000
Own their home
70%
Edmonton: 64%
Average household size
2.1
Under 15
13%
65 and over
15%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2025-12-04 To construct Interior Alterations (new Barrier Free washroom at second floor) to an existing secondary school building. "Eastglen School" · $120,000
    contractor not published by the City
    Issued
  2. 2022-11-14 To construct Interior Alterations to an existing school --"Eastglen Composite Highschool"-- Fitness room and Entry Foyer renovations. · $83,500
    contractor not published by the City
    Issued
  3. 2022-04-11 To construct Interior Alterations (Fire alarm repairs) "EASTGLEN SENIOR HIGH SCHOOL" · $200,000
    contractor not published by the City
    Issued
  4. 2022-03-15 To construct Interior Alterations and to install new make up air unit- EASTGLEN SENIOR HIGH SCHOOL (Auto Repair Shop) · $250,000
    contractor not published by the City
    Issued
  5. 2021-01-19 To construct interior alterations within an existing Assembly Public Education Services use building. Rooms 152,157 and 251. "Eastglen School" · $200,000
    contractor not published by the City
    Issued
  6. 2019-07-18 To construct interior alterations to existing classrooms ( located on the North West Area) in East Glen High School. Interior alteration includes: addition of new door between two classrooms, new finishes, new mill-work, electrical and mechanical work. · $100,000
    contractor not published by the City
    Issued
  7. 2011-03-17 To construct interior alterations to a secondary school (Eastglen modernization Phase 2) · $6,500,000
    contractor not published by the City
    Issued
  8. 2010-08-11 To construct interior/exterior alterations to a school (modernization project "Eastglen High School") · $4,830,907
    contractor not published by the City
    Issued

Development permits

No development permits are on file for this address in the City's open data.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Bellevue

11631 71 Street NW
To install a Renewable Energy Device On a House (16 Solar PhotoVoltaic (PV) Panel(s) on the Roof). · contractor not published by the City
2026-10-01
11109 70 Street NW
To construct an addition (Enclosing recessed front entry) to a Residential Use building in the form of a Single Detached House and to construct interior alterations (relocating kitchen, bathrooms, adding pantry, bedrooms, Basement renovation, NOT to be used as an additional Dwelling) and to construct exterior alterations (adding windows, doors and new front entry). · contractor not published by the City
2026-09-29
6718 111 Avenue NW
To demolish an Accessory building (detached Garage). · contractor not published by the City
2026-08-06
Something wrong on this page? Tell us and we'll check it against the City's records.