Permit GopherAlberta and B.C. property, permit and zoning records

1140 Chappelle Boulevard SW, Edmonton

An address in Chappelle Area, Edmonton. 15 building permits are on file, most recently “To construct Exterior Alterations (repair 1 existing balcony) on a three story row house …” (issued 24 October 2024). The City's 2026 assessed value for the 62 accounts at this address is $20,649,000. The City of Edmonton does not publish contractor names.

Zoning
—
Neighbourhood
Chappelle Area
Permits on file
15
Assessed value (2026)
$20,649,000
62 accounts, total
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 1140 Chappelle Boulevard SW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48112648, 4,951 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
4,951
Households
1,775
Median age
31
Median household income (2020)
$111,000
Own their home
76%
Edmonton: 64%
Average household size
2.9
Under 15
28%
65 and over
2%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2024-10-24 To construct Exterior Alterations (repair 1 existing balcony) on a three story row house building. "Unit 38, Vista Park Townhomes" NOTE: Work completed without permits · $9,500
    contractor not published by the City
    Issued
  2. 2024-02-15 To install a Renewable Energy Device On a House (12 Solar PhotoVoltaic (PV) Panel(s) on the Roof).
    contractor not published by the City
    Issued
  3. 2015-08-06 To construct an accessory garbage building. · $20,000
    contractor not published by the City
    Issued
  4. 2014-08-08 To construct a 8 unit row housing building (units 27 through 34) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $832,000
    contractor not published by the City
    Issued
  5. 2014-08-08 To construct a 9 unit row housing building (units 18 through 26) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $916,000
    contractor not published by the City
    Issued
  6. 2014-08-08 To construct a 5 unit row housing building (units 58 through 62) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $540,000
    contractor not published by the City
    Issued
  7. 2014-08-08 To construct a 5 unit row housing building (units 53 through 57) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $540,000
    contractor not published by the City
    Issued
  8. 2014-08-08 To construct a 3 unit row housing building (units 15 through 17) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $312,000
    contractor not published by the City
    Issued
  9. 2014-08-08 To construct a 5 unit row housing building (units 10 through 14) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $520,000
    contractor not published by the City
    Issued
  10. 2014-08-08 To construct a 4 unit row housing building (units 1 through 4) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $436,000
    contractor not published by the City
    Issued
  11. 2014-08-08 To construct a 5 unit row housing building (units 48 through 52) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $520,000
    contractor not published by the City
    Issued
  12. 2014-08-08 To construct a 5 unit row housing building (units 5 through 9) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $520,000
    contractor not published by the City
    Issued
  13. 2014-08-08 To construct a 9 unit row housing building (units 39 through 47) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $976,000
    contractor not published by the City
    Issued
  14. 2014-08-08 To construct a 4 unit row housing building (units 35 through 38) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $436,000
    contractor not published by the City
    Issued
  15. 2014-08-08 To construct a 4 unit row housing building (units 63 through 66) as part of a 12 building/66 dwelling row house project (Mosaic Chappelle Stage V) · $396,000
    contractor not published by the City
    Issued

Development permits

No development permits are on file for this address in the City's open data.

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Chappelle Area

4839 Cawsey Terrace SW
To construct an addition (unenclosed Covered Deck, 3.66m x 4.88m ) to a Residential Use building in the form of a Single Detached House. · contractor not published by the City
2026-10-29
4454 Clayton Way SW
To construct a Residential Use building in the form of a Single Detached House with a front attached Garage, Basement development (NOT to be used as an additional Dwelling), uncovered deck (3.05m x 3.05m) and unenclosed front porch. · contractor not published by the City
2026-10-28
4372 Clayton Way SW
To construct a Residential Use building in the form of a Single Detached House with a front attached Garage,8- solar photovoltaic system and unenclosed front porch. · contractor not published by the City
2026-10-26
Something wrong on this page? Tell us and we'll check it against the City's records.