Permit GopherAlberta and B.C. property, permit and zoning records

10700 104 Avenue NW, Edmonton

An address in Downtown, Edmonton. 64 building permits are on file, most recently “To construct Interior Alterations (convert office/classrooms to student laboratories and …” (issued 23 April 2026). 31 development permits are on file too. The City's 2026 assessed value is $65,130,500. The City of Edmonton does not publish contractor names.

Zoning
—
Neighbourhood
Downtown
Permits on file
64
+ 31 development
Assessed value (2026)
$65,130,500
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 10700 104 Avenue NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48110203, 620 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
620
Households
295
Median age
33.2
Median household income (2020)
$39,600
Own their home
7%
Edmonton: 64%
Average household size
1.6
Under 15
11%
65 and over
2%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-04-23 To construct Interior Alterations (convert office/classrooms to student laboratories and support spaces) on the main floor of an existing post-secondary education building (MacEwan University Building 6). · $4,300,000
    contractor not published by the City
    Issued
  2. 2026-04-11 To construct Exterior Alterations (Ramp replacements) to an existing commercial building. ”MacEwan University” · $738,000
    contractor not published by the City
    Issued
  3. 2026-03-30 To construct interior alterations (install new Wapochlor chlorination system) MacEwan University, Centre for Sport and Wellness - Building 8 · $174,040
    contractor not published by the City
    Issued
  4. 2026-02-11 to construct Interior Alterations (adding a Fire Alarm Control Point, installing a new TrueSite Workstation in room 6-108) in an existing commercial building. --MacEwan University-- · $66,363
    contractor not published by the City
    Issued
  5. 2026-01-19 To construct Interior Alterations to an existing School (Temporary Prep Room). Phase Permit for Science Lab Rehabilitation, Grant MacEwan University Building 6 Level 1” (see also 638914628-002) · $20,000
    contractor not published by the City
    Issued
  6. 2026-01-12 To construct Interior Alterations (Demolition only of existing science labs back to shell status) to an existing assembly building. --MacEwan University-- · $40,000
    contractor not published by the City
    Issued
  7. 2025-07-31 To complete the interior renovation of door hardware for access to exits and to enhance security for the Executive Suite egress in the existing University Building 7, Level 2. -- MacEwan University -- · $50,000
    contractor not published by the City
    Closed
  8. 2025-07-18 To construct Interior Alterations (new millwork, kitchen equipment, cosmetics) to a restaurant in an existing food court - MacEwan University. · $150,000
    contractor not published by the City
    Issued
  9. 2025-05-23 To construct Interior Alterations to an existing post-secondary institutional building. Building 8 - Centre For Sport and Wellness, Phase 2, MacEwan University. · $1,040,000
    contractor not published by the City
    Issued
  10. 2025-04-02 To construct exterior and interior alterations, Installation of Solar PV Modules on rooftop - MacEwan 106 & 107 Street Building Solar PV Array. · $337,485
    contractor not published by the City
    Issued
  11. 2025-03-24 To construct Interior Alterations to an existing post-secondary institutional building. Building 8 - Centre For Sport and Wellness, Phase 1, MacEwan University. · $650,000
    contractor not published by the City
    Issued
  12. 2024-08-30 To construct Interior Alterations (Modify area counter and entrance to accommodate two new security grilles and a new exit door) to an existing University. --MacEwan University - Building 8-- · $50,000
    contractor not published by the City
    Issued
  13. 2024-05-28 To construct Interior Alterations (Renovation of an existing Starbucks at MacEwan University, including demolition of existing cafe space) to an existing University. ”MacEwan” --Starbucks-- · $132,083
    contractor not published by the City
    Issued
  14. 2024-04-24 To construct Interior Alterations (Interior renovations of select classroom and office space) to an existing University. ”MacEwan” · $627,966
    contractor not published by the City
    Issued
  15. 2023-09-18 To Construct Interior Alteration (Classroom 5-324 and 5-322 to be converted into Earth and Sciences Teach Lab, Preparation area and students space) - MacEwan Level 3 Building 5 Earth and Sciences Laboratory Renovation · $1,000,000
    contractor not published by the City
    Issued
  16. 2023-05-30 Interior Alteration MacEwan University Building 7 Level 2. Partial renovation of an existing office/classroom area to be converted into four new classrooms, and two existing gender specific washrooms to be converted into two gender neutral washrooms. - "MacEwan University." · $1,292,466
    contractor not published by the City
    Issued
  17. 2023-05-15 To complete Interior Alterations (demo/re-construct office area) in an existing educational assembly building (Parking Office - Building 6, main floor, Room 122) - MacEwan University. · $139,030
    contractor not published by the City
    Issued
  18. 2023-05-15 To complete Interior Alterations (phase 1 Laboratory Renovations with mechanical & electrical infrastructure) in an existing educational assembly building (Building 5, basement level). -MacEwan University · $328,281
    contractor not published by the City
    Issued
  19. 2023-04-26 Interior alterations (Faculty of Arts & Science office renovation - levels 02 & 03 - Building 6 & 7) of an existing university building - "MacEwan University." · $246,406
    contractor not published by the City
    Issued
  20. 2022-06-29 To complete Interior Alterations construct new exit stairs in an existing educational assembly building. (Add capacity of 225 people to building 7) - MacEwan University · $3,500,000
    contractor not published by the City
    Issued
  21. 2022-06-28 To construct Interior Alterations (3rd Floor Office Upgrades) "Macewan University SAMU" · $35,000
    contractor not published by the City
    Issued
  22. 2022-05-24 Building 6 To construct Interior Alterations to the existing cafeteria (includes structural work: stair removal to add B/F ramps). "MacEwan Cafeteria" · $350,000
    contractor not published by the City
    Issued
  23. 2022-04-25 To complete Interior Alterations (demolition/construction of partition walls), located on the 2nd level in an existing educational assembly building. - MacEwan University (Building 7) (Centre For Teaching and Learning (CTL) and Client Services (ITS) areas, plus room 7-269) · $1,000,000
    contractor not published by the City
    Issued
  24. 2021-06-02 To complete Interior Alterations (demolish existing research lab and construct a new fish lab - Phase 3) in existing educational assembly building - MacEwan University (Building 5- basement area) Lab Room 5-018 · $230,000
    contractor not published by the City
    Issued
  25. 2021-05-26 To construct Interior Alteration to an existing university - MacEwan Faculty Office Renovations - Interior alternation of existing offices through the campus in building 5, 6, and 7. Construction includes new wall locations for added offices, new doors, mechanical and electrical scopes. · $250,000
    contractor not published by the City
    Issued
  26. 2021-05-19 To construct Interior Alteration to renovate the MacEwan University Security Dispatch Center. · $300,000
    contractor not published by the City
    Issued
  27. 2021-05-18 To construct exterior alterations to an Assembly use building. Parkade ramp replacement, on the north side of the site. "MacEwan University" · $225,000
    contractor not published by the City
    Issued
  28. 2021-04-26 To construct Interior Alteration - MacEwan Vacuum Pump · $200,000
    contractor not published by the City
    Issued
  29. 2021-04-19 To construct Interior Alteration - MacEwan Washroom Expansion in Building 105 - Construction of new Gender Neutral washroom space with 2 universal BF stalls, 14 universal waterclosets, 9 Lavatories. · $500,000
    contractor not published by the City
    Issued
  30. 2021-03-16 To construct interior alterations BUILDINGS 6&7 in a commercial Assembly use building, ''MacEwan University''. Partial reno of 2nd level, Library and relocation of convenience stair in building 7 between level 2 and 3. Renovate an Exam Centre on Level 1. · $1,900,000
    contractor not published by the City
    Issued
  31. 2021-01-27 To construct Interior Alteration an existing assembly building. Increase existing door and frame widths to accommodate barrier free standards. "MacEwan University" · $169,000
    contractor not published by the City
    Issued
  32. 2020-07-17 To construct alterations to an education assembly building ( MacEwan University Building 5) · $4,500,000
    contractor not published by the City
    Issued
  33. 2020-07-15 To construct initial selective demolition and repair for interior mechanical services ( MacEwan University Building 5 BP# -002) · $10,000
    contractor not published by the City
    Issued
  34. 2020-06-02 To construct interior alterations to a commercial education services building. MacEwan Science Lab Expansion, Phase 1, BUILDING 5 ( ONLY Demolition of existing de-commissioned air handling units and associated ductwork and electrical.). · $150,000
    contractor not published by the City
    Issued
  35. 2020-05-06 To construct Interior Alteration to an existing university - MacEwan Fitness Centre Renovation - Interior renovation of fitness centre that involves architectural, mechanical and electrical changes associated with relocating a spin room and renovating rooms and washrooms in Building 8 Level 1. · $280,000
    contractor not published by the City
    Issued
  36. 2020-03-20 To construct Interior Alteration between level 2 and 3 to an existing building (demolish existing convenience stairs in building 6 & 7, fill in stair opening bldg 6, relocate stairs in bldg 7). Construction work included mechanical, sprinkler, electrical and structural scopes. - MacEwan University Library - Phase 1 · $1,500,000
    contractor not published by the City
    Issued
  37. 2019-09-26 To construct interior alterations for a Royal Bank of Canada at MacEwen University.(Ground Floor) · $61,000
    contractor not published by the City
    Issued
  38. 2019-05-13 To construct exterior alterations to an existing A2 building - new dormer and double door on north roof slope of mechanical penthouse - for access to rooftop service equipment (Bldg 5-adjacent to 105st) · $93,000
    contractor not published by the City
    Issued
  39. 2018-07-12 To construct interior alterations at an existing building - Tim Hortons in Grant MacEwan, building 6. · $102,500
    contractor not published by the City
    Issued
  40. 2017-07-31 To Construct 115 meters of covered sidewalk hoarding along the East Side of 109 street, North of 104 avenue. SAMU site. July 01/17 to Feb. 28/19. (THIS PEERMIT WILL ONLY BE VALID UNTIL JANUARY 31,2018 UNLESS AN EXTENSION IS GRANTED) · $5,500
    contractor not published by the City
    Issued
  41. 2017-07-07 To Construct interior alterations in an existing university sports & wellness building. Installation of piles & caps in preparation for future new construction of SAMU Building. · $286,500
    contractor not published by the City
    Issued
  42. 2016-07-27 To construct an addition to a Public Education Services Building (Pedway connecting Robbins Health Learning Centre and MacEwan University Center for Art and Communications). · $750,000
    contractor not published by the City
    Issued
  43. 2016-06-03 To construct interior alterations to an existing retail space - Upgrading and re-routing utilities, new finishes. (City Centre Market Subway & City Centre Market line) · $185,000
    contractor not published by the City
    Issued
  44. 2015-08-27 To construct Tenant Improvements. (Replace existing Hvac, Plumbing, Casework, and flooring in an existing Chemistry Lab) · $282,000
    contractor not published by the City
    Issued
  45. 2015-08-04 To Construct interior alterations to an existing educational building. MacEwan University - Library Archive Room. · $75,000
    contractor not published by the City
    Issued
  46. 2015-04-22 To construct interior alterations to an Indoor Participant Recreation Service (Sport and Wellness Reception renovation - fitness area) for a Public Education Service building (Grant MacEwan). · $175,000
    contractor not published by the City
    Issued
  47. 2014-11-26 To construct Interior Alterations to Macewan University - GRIFFINS LANDING RETAIL STORE. · $190,000
    contractor not published by the City
    Issued
  48. 2014-07-10 To construct interior alterations to a Public Education Service building, MSC Project, "Macewan University". Maintenance and construction in mutiple buildings · $1,500,000
    contractor not published by the City
    Issued
  49. 2013-10-30 To constuct interior alterations to an existing Private Educational Building, Sociology Department Renovatons, Suite 6-398, "Grant MacEwan University". · $200,000
    contractor not published by the City
    Issued
  50. 2012-10-19 To construct interior alterations to an existing private Education Building - 3rd. floor - converting classrooms to offices. Humanities Project. · $220,000
    contractor not published by the City
    Issued
  51. 2012-09-21 To enclose an existing outdoor patio to expand an Accessory Indoor Participant Recreation Service (fitness area) for a Public Education Service building (Grant MacEwan). · $4,800,000
    contractor not published by the City
    Issued
  52. 2012-08-29 To Construct interior alteration MacEwan College " BSc Laboratory - Bldg 5 basement · $2,310,000
    contractor not published by the City
    Issued
  53. 2012-08-24 To construct interior alteraitons to a public education services building, (bldg 7) "Macewan Mid-Range Project" Phase 4 City Centre Campus. · $986,000
    contractor not published by the City
    Issued
  54. 2012-03-06 To construct exterior alterations (roof top air handling unit) to a Public Education Service building (building 5) and to construct an Accessory shed. · $850,000
    contractor not published by the City
    Issued
  55. 2011-10-31 To construct interior alterations to a public education service building - Grant Macewan - Building 7 / 3rd Floor. · $450,000
    contractor not published by the City
    Issued
  56. 2011-07-30 To construct Interior Alterations to an existing Public Education Service Building (Buildings 105, 106 and 107 - Levels 1, 2 and 3 in each) · $976,000
    contractor not published by the City
    Issued
  57. 2010-10-05 To construct interior alterations in an existing education building. Grant MacEwan Bldg. #6 on main floor - Washroom Renovation. · $90,000
    contractor not published by the City
    Issued
  58. 2010-02-16 To construct interior alterations to an existing education building. Fire alarm upgrade at Grant MacEwan City Centre Campus. (buildings 1,2,3&4) · $1,200,000
    contractor not published by the City
    Issued
  59. 2009-10-09 To construct interior alterations to an existing secondary education building - MacEwan City Centre Campus, second and third floors- building 6 · $220,000
    contractor not published by the City
    Issued
  60. 2009-09-25 To construct interior alterations to a commercial building - Grant MacEwan College, City Center Campus (Facilities General Office Reconfiguration; main floor building 7). · $190,000
    contractor not published by the City
    Issued
  61. 2009-09-16 To construct interior alterations to MacEwan City Centre Campus - Building 5 Second Floor. Computer Sciences Rm 5-216, 5-235 & Server Room, 5-226. · $230,000
    contractor not published by the City
    Issued
  62. 2009-09-16 To construct interior alterations to MacEwan City Centre Campus - Building 6 & 7 Third Floor. Lbrary Tech area, Rms 6-302B & 6-302C and Rms 7-305, 7-305H & 7-305J. · $125,000
    contractor not published by the City
    Issued
  63. 2009-02-04 To construct interior alterations to an existing secondary education building - MacEwan City Centre Campus, Library Renovation. · $1,240,000
    contractor not published by the City
    Issued
  64. 2009-01-09 To construct interior alterations ; Mechanical /Electrical upgrade for cooling equipment- 3 rd flr - 107 street bldg ' Grant MacEwan College" · $320,000
    contractor not published by the City
    Issued

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2026-10-29 To install (3) Fascia Signs limited to On-premises Advertising and (1) Freestanding Sign limited to On-premises Advertising (Ref CSDP: 630965720-002, #EX-4, EX-6, EX-16 and EX-32) (MACEWAN UNIVERSITY)
    Sign Sign Permit · City file 673927959-002
    Approved
  2. 2026-03-30 To Construct Exterior Alterations (Nitrogen Tank Installation) and Interior Alterations to a School (Classroom Renovations)
    Alterations Major Development Permit · City file 651049466-002
    Approved
  3. 2025-11-05 To amend Comprehensive Sign Design Plan (463071239-009) for (MACEWAN UNIVERSITY, SCHOOL OF BUSINESS)
    Sign Sign Permit · City file 630965720-002
    Approved
  4. 2025-10-15 To construct exterior alterations to a School (MacEwan University, replacement of light fixtures, adding architectural screens and tower lighting).
    Alterations Major Development Permit · City file 631517317-002
    Approved
  5. 2024-09-12 To Construct Exterior Alterations to a School Site (Surface Parking Lot with 145 Parking Stalls)
    Alterations Major Development Permit · City file 510303545-002
    Approved
  6. 2024-03-25 To develop a Comprehensive Sign Design Plan (MacEwan School of Business).
    Sign Sign Permit · City file 463071239-009
    Approved
  7. 2023-08-14 To construct exterior alterations to a Public Education Service building (roof mounted Solar Collectors)
    Alterations Major Development Permit · City file 480634159-002
    Approved
  8. 2023-08-03 To construct a seven storey Public Education Service Building with a penthouse, mezzanine, underground parkade, pedway connection and an Accessory Specialty Food Services on the main floor (MacEwan School of Business).
    New building Major Development Permit · City file 463071239-002
    Approved
  9. 2022-05-05 To construct an addition and exterior alterations to a Public Education Service building (Building 7 NW Exit, West Village Square Exit - Grant MacEwan University Downtown).
    Addition Major Development Permit · City file 417320373-002
    Approved
  10. 2020-07-10 To install a Minor Digital On-premises Freestanding Sign (Digital panel 1.6m x 1.6m facing West, static panel facing East) (MACEWAN UNIVERSITY).
    Sign Sign Permit · City file 361547071-001
    Other
  11. 2020-01-14 To Construct Exterior Alterations to a Public Education Service building (Rooftop Air Handling Units)
    Alterations Major Development Permit · City file 349666212-002
    Approved
  12. 2020-01-09 To install (4) Freestanding On-premises Signs (ROUND HOUSE | MACEWAN UNIVERSITY).
    Sign Sign Permit · City file 343822901-001
    In review
  13. 2019-12-03 To install (1) Fascia On-premises Sign (KIHEW WACISTON INDIGENOUS CENTRE | MACEWAN UNIVERSITY).
    Sign Sign Permit · City file 341382741-001
    In review
  14. 2019-04-24 To install (1) Freestanding On-premises Sign (SAMU MACEWAN UNIVERSITY).
    Sign Sign Permit · City file 305713145-001
    Approved
  15. 2019-04-08 To construct exterior alterations to a Public Education Service Building (a new dormer on the roof of Grant McEwan University)
    Alterations Major Development Permit · City file 310554549-001
    Approved
  16. 2019-02-25 To construct interior and exterior alterations to an existing Public Education Service (revision of approved Landscaping Plan - KIHEW WACISTON INDIGENOUS CENTRE - MacEwan University).
    Alterations Major Development Permit · City file 302650706-001
    Approved
  17. 2018-12-31 To install (1) Fascia On-premises Sign (SAMU BUILDING MACEWAN UNIVERSITY)
    Sign Sign Permit · City file 297339755-001
    In review
  18. 2018-01-08 To install a Fascia On-premises Sign (Christenson Family Centre For Sports and Wellness).
    Sign Sign Permit · City file 265646005-001
    In review
  19. 2017-07-25 To install Solar Collectors (50 panels) on the roof of a Public Education Service building (Robins Health Learning Centre).
    Other Major Development Permit · City file 257909395-001
    Approved
  20. 2017-07-17 To install (1) Freestanding On-Premises Sign (MacEwan University)
    Sign Sign Permit · City file 252911200-001
    Approved
  21. 2017-07-11 To change the Use from General Retail Stores to Specialty Food Services and to construct interior alterations. (VICKY’S CAFÉ)
    Change of use Major Development Permit · City file 255352386-001
    Approved
  22. 2016-05-03 To construct an addition to a Public Education Services Building (Pedway connecting Robbins Health Learning Centre and MacEwan University Center for Art and Communications).
    New building Major Development Permit · City file 146136981-017
    Approved
  23. 2015-07-17 To construct interior & exterior alterations to a previously approved Public Education Services Building with accessory Restaurant, General Retail Uses on a portion of a 121 ha site. (MacEwan University Center for Art and Communications)
    Alterations Major Development Permit · City file 146136981-015
    Approved
  24. No description
    Other Major Development Permit · City file 671218592-002
    In review
  25. To Construct Exterior Alterations to a School (Parkade Ramp Maintenance)
    Alterations Major Development Permit · City file 650336590-002
    Other
  26. To Construct Exterior Alterations to a School (Renewable Energy Devices on Rooftop)
    Alterations Major Development Permit · City file 581750306-002
    Other
  27. To construct exterior alterations to a School building (Rooftop Solar Collectors on Building 7 of Grant McEwan University)
    Alterations Major Development Permit · City file 495719389-002
    Other
  28. To construct a Public Education Service building (MacEwan University School of business is a 29,900m2 eight storey building).
    New building Major Development Permit · City file 451173990-002
    Other
  29. Alteration of (an) existing building(s), Exterior Alteration, Exterior Alterations to the Site
    Alterations Major Development Permit · City file 391342753-002
    Other
  30. To operate a Special Event at Grant McEwan University (Fantastic Planet inflatable sculpture display - March 23 to April 11, 2021)
    Other Major Development Permit · City file 388967249-003
    In review
  31. To construct exterior alterations to an existing Public Education Service site. (108 Street Forecourt Redevelopment - Grant MacEwan University)
    Alterations Major Development Permit · City file 358963650-002
    Other

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

10238 104 Street NW
To construct Interior Alterations to an existing restaurant. Interior finishes and kitchen improvements; and servicing the existing kitchen hood for a new tenant. "Hibachi Teppanyaki and Bar Restaurant" · contractor not published by the City
2026-10-29
10175 101 Street NW
To construct Interior Alterations (tenant improvement) for an office in an existing commercial building. "Parlee McLaws LLP" · contractor not published by the City
2026-10-29
10104 103 Avenue NW
To construct Interior Alterations (flooring change, minor demolition, relocate door, relocate electrical panel, move sink, new millwork) to an existing office tower. · contractor not published by the City
2026-10-27
Something wrong on this page? Tell us and we'll check it against the City's records.