Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the photo to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Under Development permits are the City's decisions on what may be built or how the property may be used (they come before the building permit), with the kind, the date, the stage and the City's file number.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
10524 46 Street NW, Edmonton
An address in Gold Bar, Edmonton, zoned PS (Parks and Services). 5 building permits are on file, most recently “To construct exterior alterations within the grounds of a Public Education Service site (…” (issued 10 August 2023). 2 development permits are on file too. The City's 2026 assessed value is $5,090,500. The City of Edmonton does not publish contractor names.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48110776, 437 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2023-08-10
To construct exterior alterations within the grounds of a Public Education Service site (replacement of Gold Bar Air Monitoring Station) · $110,000
contractor not published by the City Issued -
2022-12-16
To construct Interior Alterations in an existing school. Replace washrooms with gender neutral washrooms. "Gold Bar Elementary School" · $353,100
contractor not published by the City Issued -
2022-04-06
To construct Interior Alterations, interaction room delayed egress maglocks on main floor Classrooms 147/148 "GOLD BAR ELEMENTARY SCHOOL" · $10,000
contractor not published by the City Issued -
2021-01-15
To construct seclusion rooms within an existing Assembly Public Education Service use building, GOLD BAR ELEMENTARY SCHOOL. (Classrooms 109, 110, & 148). · $75,000
contractor not published by the City Issued -
2010-08-18
To construct interior alterations in an existing school building. Barrier Free Modifications & Behavior Classroom "Time Out Room". Goldbar Elementary. · $20,000
contractor not published by the City Issued
Development permits
The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.
-
2023-07-25
To construct exterior alterations within the grounds of a Public Education Service site (replacement of Gold Bar Air Monitoring Station)
Alterations Major Development Permit · City file 474485628-002 Approved -
To construct interior alterations to a Public Education Service building (seclusion rooms)
Alterations Major Development Permit · City file 381029673-002 Other
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Gold Bar
To install a Renewable Energy Device On a House (11 Solar PhotoVoltaic (PV) Panel(s) on the Roof). · contractor not published by the City2026-10-19
To demolish a detached Garage. · contractor not published by the City2026-09-21
To install a hot tub in the Rear Yard (2.26m x 2.26m). · contractor not published by the City2026-09-18