This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the photo to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Under Development permits are the City's decisions on what may be built or how the property may be used (they come before the building permit), with the kind, the date, the stage and the City's file number.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1021 Hayter Road NW, Edmonton
An address in Clover Bar Area, Edmonton, zoned IM (Medium Industrial). 18 building permits are on file, most recently “To construct Interior Alterations (HVAC upgrades with associated electrical work). Gilead…” (issued 30 May 2025). 10 development permits are on file too. The City's 2026 assessed value is $28,770,500. The City of Edmonton does not publish contractor names.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48112493, 25 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2025-05-30
To construct Interior Alterations (HVAC upgrades with associated electrical work). Gilead East Campus Warehouse Heating and Ventilation Upgrades · $115,000
contractor not published by the City Issued -
2025-03-04
To construct Interior Alterations (HVAC upgrade including install new structural steel support for new MUA unit and related electrical work) · $650,000
contractor not published by the City Issued -
2019-04-26
To demolish an existing maintenance building within industrial site · $88,389
contractor not published by the City Issued -
2017-06-27
To construct a General Industrial building with a link to adjacent building (Gilead chemical synthesis plant F&F Permit# -007). · $28,353,446
contractor not published by the City Issued -
2016-12-12
To construct the STRUCTURAL FRAME ONLY for a General Industrial building with a link to adjacent building (Gilead chemical synthesis plant F&F Permit# -007).
contractor not published by the City Issued -
2016-10-04
To construct exterior alterations to an existing General Industrial Use Building, "Gilead Alberta" (lean-to under existing pipe rack). · $80,000
contractor not published by the City Issued -
2016-07-22
To construct FOOTINGS and FOUNDATION for a General Industrial building (Gilead chemical synthesis plant). · $1,632,599
contractor not published by the City Issued -
2016-04-07
To construct exterior alterations (demolish a portion of a General Industrial building) and demolish a storage building (Gilead). · $28,500
contractor not published by the City Issued -
2016-03-15
To construct an addition to an industrial building (lunchroom expansion) - Gilead ULC. · $2,591,600
contractor not published by the City Issued -
2016-02-17
To construct FOUNDATION ONLY for an addition to an industrial building (lunchroom expansion) - Gilead ULC.
contractor not published by the City Issued -
2016-02-02
To remove (2) temporary modular buildings off site to allow additional parking construction to an existing General Industrial Use buildings and do minor exterior alterations of existing structures. · $195,103
contractor not published by the City Issued -
2015-10-01
To Demolish an existing processing building. Building "F". 102 sqm building at North central of site just off Hayter Road. · $5,000
contractor not published by the City Issued -
2012-01-11
To construct an addition to an existing General Industrial Use building - Process Tower / Warehouse Secondary Elevator · $350,000
contractor not published by the City Issued -
2011-11-29
To construct interior alterations to a general industrial use, "Gilead Alberta"- QC Laboratory Expansion" 3rd floor. · $50,000
contractor not published by the City Issued -
2009-11-25
To construct interior alterations to an industrial building (Gilead Alberta Research Lab SECOND FLOOR lockers/washroom) · $250,000
contractor not published by the City Issued -
2009-11-18
To construct an addition to an existing general industrial use building. · $300,000
contractor not published by the City Issued -
2009-05-12
To construct 2 temporary structures (lab and office) with a connecting link as an accessory use to existing General Industrial Use Buildings (Gilead Alberta ULC) · $500,000
contractor not published by the City Issued -
2009-01-09
To construct interior alterations to an existing general industrial use building - Gilead Alberta Research Lab/Main Floor. · $450,000
contractor not published by the City Issued
Development permits
The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.
-
2019-08-12
To install (1) Fascia On-premises Sign (GILEAD)
Sign Sign Permit · City file 322771445-001 In review -
2019-05-15
To construct a General Industrial Use (maintenance and office) building.
New building Major Development Permit · City file 300252417-001 Approved -
2019-03-27
To demolish an existing maintenance building and two metering stations.
Demolition Minor Development Permit · City file 300252417-006 Approved -
2017-04-26
To construct exterior alterations to an existing General Industrial Use building (expanding tank farm)
Alterations Major Development Permit · City file 219871428-003 Approved -
2016-07-28
To construct exterior alterations to an existing General Industrial Use Building. (lean-to under existing pipe rack)
Alterations Major Development Permit · City file 225877437-001 Approved -
2016-06-30
To increase the building Height of a General Industrial building.
Other Major Development Permit · City file 219871428-001 Approved -
2016-04-01
To construct exterior alterations (demolish a portion of a General Industrial building) and demolish a storage building (Gilead).
Demolition Major Development Permit · City file 165900281-008 Approved -
2016-01-06
To construct an addition to an existing General Industrial Use building (lunchroom expansion with outdoor patio) (Gilead Lunchroom Expansion East Campus, Edmonton, AB)
New building Major Development Permit · City file 183004403-001 Approved -
2015-09-21
To construct additional parking for existing General Industrial Use buildings.
New building Major Development Permit · City file 171362721-001 Approved -
2015-09-17
To construct an addition to a General Industrial building (Gilead chemical synthesis plant).
New building Major Development Permit · City file 165900281-002 Approved
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Clover Bar Area
To install a Renewable Energy Device (freestanding Solar Collector, 12.5m x 3.4m @ 4.0m in Height). · contractor not published by the City2026-10-20
Demolition of accessary building. "ATCO trailer" · contractor not published by the City2026-09-10
To construct Exterior Alterations ( new overhead door in North elevation) to an existing General Use Industrial building. · contractor not published by the City2026-08-21