Permit GopherAlberta and B.C. property, permit and zoning records

10180 101 Street NW, Edmonton

An address in Downtown, Edmonton, zoned CCA (Core Commercial Arts Zone). 172 building permits are on file, most recently “To complete interior alteration 3rd floor for new offices within the existing office buil…” (issued 10 August 2026). 16 development permits are on file too. The City's 2026 assessed value is $115,481,000. The City of Edmonton does not publish contractor names.

Zoning
CCA · Core Commercial Arts Zone
Neighbourhood
Downtown
Permits on file
172
+ 16 development
Assessed value (2026)
$115,481,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 10180 101 Street NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48112290, 841 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
841
Households
620
Median age
33.2
Median household income (2020)
$48,400
Own their home
7%
Edmonton: 64%
Average household size
1.3
Under 15
2%
65 and over
18%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-08-10 To complete interior alteration 3rd floor for new offices within the existing office building. --LAPP Corporation. · $700,000
    contractor not published by the City
    Issued
  2. 2026-08-10 To construct Interior Alterations (replacing work stations on 3rd floor) to an existing office tower. ”Manulife Place” · $147,700
    contractor not published by the City
    Issued
  3. 2026-07-16 To construct Interior Alterations (29th floor renovation adding 5 offices) to an office in an existing office building. "Bryan & Co" · $150,000
    contractor not published by the City
    Issued
  4. 2026-06-22 To construct Interior Alterations (office renovation 27th floor) within an existing office building (Manulife Place). --AIC OFFICE RENOVATION-- · $245,000
    contractor not published by the City
    Issued
  5. 2026-06-09 To Construct partitions within an existing floor, including build out the elevator lobby & split the floor into 2 tenancies (core & shell only, future tenants require separate permits). · $120,000
    contractor not published by the City
    Issued
  6. 2026-06-09 To construct interior alterations for a fast food kiosk in the Commerce Place Food Court (2nd floor) -- Tim Hortons -- · $350,000
    contractor not published by the City
    Issued
  7. 2026-05-27 To construct Interior Alterations in the 15th floor of an existing office building (Manulife Place) --Deloitte-- · $1,045,000
    contractor not published by the City
    Issued
  8. 2026-03-06 To construct Interior Alterations (Removing & infilling of 2 convenience staircases between 15th and 16th floors (suite 1500 & 1600) within an existing office tower, National Bank Centre (formerly known as Manulife Place). · $200,000
    contractor not published by the City
    Issued
  9. 2025-10-22 To change of use from a retail (E) to an office (D) and to construct Interior Alterations ( Adding a interconnected stair ) within an existing commercial building. "National Bank Headquarters Branch" · $4,800,000
    contractor not published by the City
    Closed
  10. 2025-10-20 To construct Interior Alterations (construct the structure only that is required to support the new bank vault in parkade below) to an existing office building. "Edmonton Headquarters Branch - TI Vault Support” · $185,000
    contractor not published by the City
    Issued
  11. 2025-06-09 To construct Interior alterations, Suites 1930, 1940 & 2445 (Show Suites) in an existing office building, "Manulife place". · $250,000
    contractor not published by the City
    Closed
  12. 2025-05-01 To construct covered hoarding on the North, East, and West side of the building so new windows can be installed on the 2nd floor permitter walls for the duration of from April 04/2025 to October 24/2025. - Manulife Place Podium Renovation · $58,377
    contractor not published by the City
    Issued
  13. 2025-04-17 To construct interior alterations to an existing commercial building. Interior upgrades to the Inside of the building on floors 1-3. Construction of amenities including a fitness centre, end-of-trip facilities, expanded bike storage, tenant lounge, conference centre on the second floor, shell CRU's for future tenant fit ups. MANULIFE PODIUM REHABILITATION · $10,613,295
    contractor not published by the City
    Issued
  14. 2025-04-15 to construct Interior Alterations (tenant fit-up) on the 30th floor of an existing office building (Manulife Place).--Definity Insurance Company-- · $400,000
    contractor not published by the City
    Closed
  15. 2025-03-27 To construct Interior Alterations in an existing Office Tower -"Canadian Western Bank - Manulife Place"- Tenant Improvements on floors 5 - 12. New interconnected stair on 5th / 6th floor, new accessible washroom on each floor. · $15,672,240
    contractor not published by the City
    Issued
  16. 2025-03-21 To construct a temporary covered hoarding and fenced hoarding on city property, allowing for entry and exit from the northwest corner of the building only (type "C"). Hoarding duration: March 7, 2025, to June 1, 2026 · $28,930
    contractor not published by the City
    Issued
  17. 2025-03-12 To construct Addition of an exterior stair from the 5th floor to the 4th floor podium. CANADIAN WESTERN BANK/MANULIFE PLACE · $750,458
    contractor not published by the City
    Issued
  18. 2025-02-11 To construct Exterior & Interior Alterations to an existing High rise podium. Manulife Place - Podium Repositioning phase 1. · $11,300,000
    contractor not published by the City
    Issued
  19. 2025-01-06 To construct Interior Alteration (parkade and drainage system repair). Manulife Place 2024 Parkade Repair Program · $807,081
    contractor not published by the City
    Issued
  20. 2024-11-01 To complete interior renovation to add a tenant fit-up (office) within the existing office building. -- Robert Half -- · $200,000
    contractor not published by the City
    Issued
  21. 2024-07-17 To construct Interior Alterations in an existing office building. Returning floor spaces to base / shell condition in preparation for future Tenant Improvement. Future tenant requires separate Permits. CWB | MANULIFE PLACE - LEVEL 5-12,14 · $1,042,697
    contractor not published by the City
    Issued
  22. 2024-07-02 To construct Interior Alterations (expansion of the Suite and renovation of the offices on the 24th floor - Suite 2410) of an existing building. “Crowe MacKay LLP” · $183,514
    contractor not published by the City
    Closed
  23. 2024-02-02 To construct Interior Alterations (office renovation 27th floor) within an existing office building Manulife Place - MLP IDX TI · $45,000
    contractor not published by the City
    Closed
  24. 2024-02-02 To construct Interior Alterations (office renovation) within an existing office building (Manulife Place, Suite 2810). - Marsh Canada · $90,000
    contractor not published by the City
    Closed
  25. 2024-02-02 To construct Interior Alterations (office renovation and public corridor on the 28th floor) within an existing office building (Manulife Place). - Canaccord Genuity · $200,000
    contractor not published by the City
    Closed
  26. 2024-02-02 To construct Interior Alterations (office renovation 27th floor) within an existing office building (Manulife Place). - Alberta Insurance Council · $45,000
    contractor not published by the City
    Issued
  27. 2023-12-14 To construct Interior Alterations (Tenant fit-up to add a specialty coffee shop) in the existing commercial building. · $249,000
    contractor not published by the City
    Closed
  28. 2023-10-11 To construct Interior Alterations in an existing building -"Manulife Place Parkade"- Demolition of old dry sprinkler system, installtion of new wet system for 3 levels of parkade (P1-P3) · $897,000
    contractor not published by the City
    Issued
  29. 2023-09-20 To construct Interior Alterations to an existing office space - AIC Offices expansion into existing built space, doorway through demising wall (smoke sep), new paint and carpet finishes · $95,000
    contractor not published by the City
    Issued
  30. 2023-07-10 To construct Interior Alterations (Install temporary hoarding on the main and second floor of Manulife Tower inside the building) to facilitate the escalator removal and replacement. Includes sprinkler work. "Manulife Place " · $30,000
    contractor not published by the City
    Issued
  31. 2022-11-02 To construct Interior Alterations in an existing Building - Manulife Place Parkade Restoration/Repairs - P1 - P3 · $229,282
    contractor not published by the City
    Issued
  32. 2022-06-16 To complete Interior Alterations (re-demise suite rooms) within a commercial Business And Personal Services use building (6th Floor, Manulife Place) - Marsh & McLennan Canada · $238,000
    contractor not published by the City
    Issued
  33. 2022-02-17 To complete Interior Alterations (demolition of existing space back to base building condition) within a commercial Business And Personal Services use building. - Manulife Place (Suite 201, 2nd Floor, RBC Bank) Note: the new tenant layout will be done in future under a separate permit · $376,000
    contractor not published by the City
    Issued
  34. 2022-01-06 To complete interior alterations (constructing partition walls to add 4 offices to existing office space) in existing commercial building - Reynolds Mirth Richards & Farmer LLP · $25,000
    contractor not published by the City
    Issued
  35. 2021-11-29 Interior Alteration - IG Wealth Management - Edmonton Metro · $750,000
    contractor not published by the City
    Issued
  36. 2021-10-06 To construct interior alterations within a commercial Business And Personal Services use building (CP19-04 Installation of Gas and Electrical Humidifiers with associated venting/combustion air 3rd, 4th & 36th floor mechanical rooms.). · $270,000
    contractor not published by the City
    Issued
  37. 2021-10-06 To construct exterior/interior alterations ''Manulife Place''. Replacement of two Roof Top Cooling Towers. · $604,000
    contractor not published by the City
    Issued
  38. 2021-10-06 To construct interior alterations within a commercial Business And Personal Services use building, ''Manulife Place''. (CP19-005 Installation of Fan Coils, Ventilation and Hydronic Heating lines). · $247,000
    contractor not published by the City
    Issued
  39. 2021-06-09 To construct Interior Alteration to existing suite in office building - Panattoni - Expansion of suite into neighbouring space · $90,000
    contractor not published by the City
    Issued
  40. 2021-06-07 To construct Interior Alteration - Manulife Place 33rd Floor Landlord Work - Demolition of previous tenant build-out and update of ceiling to new building standard · $475,000
    contractor not published by the City
    Issued
  41. 2021-01-28 To construct Interior Alteration - Manulife Place Suite 650 Landlord Work - Demolition of existing fit-out within ±171m2 vacant office suite in Manulife Place to make it ready for a new tenant fit out (note: the new tenant layout will be done in future under a separate permit). · $40,000
    contractor not published by the City
    Issued
  42. 2020-11-27 To construct Interior Alterations (full floor architectural, mechanical & electrical improvement) in existing office space. - RGMP (floor 21) @ Manulife Place. · $3,000,000
    contractor not published by the City
    Issued
  43. 2020-11-13 To construct Interior Alteration to an existing office building. Demolition of an existing space to return to leasing conditions including mezzanine. Manulife Place Suite 135 Landlord's Work · $75,000
    contractor not published by the City
    Issued
  44. 2020-10-07 To construct Interior Alterations in an existing office tower. Tenant fit-up on 25th & 26th floors. · $2,400,000
    contractor not published by the City
    Issued
  45. 2020-10-01 To construct interior alterations to a Suite in a commercial Business And Personal Services use building, Manulife Place, Suite 240. Landlord's Work, demolition of an existing space to return to leasing condition. · $50,000
    contractor not published by the City
    Issued
  46. 2020-09-16 To construct Interior Alteration to bring space back to shell building - Manulife Place Suite 102 Landlord's Work · $86,400
    contractor not published by the City
    Issued
  47. 2020-08-26 To construct Interior Alteration to an existing building - SUITE 230 & SUITE 235 Interior Modifications - Interior modifications of vacant unit. making 2 units into one. · $50,000
    contractor not published by the City
    Issued
  48. 2020-08-26 To construct interior alterations to a Suite in a commercial Business And Personal Services use building, 12th Floor, Manulife Place, "APEX INOVATIONS" Tenant improvement. · $112,000
    contractor not published by the City
    Issued
  49. 2020-07-16 To construct Interior Alteration - Manulife Investment Management (Real Estate Office) New Premises - Creating new office premises within an existing fully demised suite in Manulife Place for the Landlord Real Estate office. · $300,000
    contractor not published by the City
    Issued
  50. 2020-07-15 To construct interior alterations within commercial building (Manulife Place) · $82,930
    contractor not published by the City
    Issued
  51. 2020-07-14 To construct Interior Alteration to an existing office building - Manulife Place Suite 235 Landlord's Work - Demolition of an existing space to return to leasing conditions. · $40,000
    contractor not published by the City
    Issued
  52. 2020-07-14 To construct Interior Alteration to an existing office building - Manulife Place Suites 175/275 Landlord's Work - Interior Demolition to return the space to base building standard. Feature stair case removal and slab infill. Passenger elevator removal and slab infill. Removal of a commercial kitchen. · $500,000
    contractor not published by the City
    Issued
  53. 2020-07-13 To construct interior alterations within office tower - MANULIFE PLACE - suites 1950 and 2430 return to base conditions · $80,000
    contractor not published by the City
    Issued
  54. 2020-05-13 To construct Interior Alteration in an existing office building - AIC offices, suite 2700, 27th floor Manulife Place - Interior alterations to an existing office suite. · $510,000
    contractor not published by the City
    Issued
  55. 2020-05-05 To construct interior alteration to Business and Personal Services use building, 25th and 26th Floor, ''Manulife Place''. Landlord's Work. Demolition of an existing space to bring back to leasing conditions. Construction of 2 barrier free bathrooms · $750,000
    contractor not published by the City
    Issued
  56. 2020-05-04 To construct Interior Alteration to an office building - Manulife Investment Management New Offices Suite 1335 - Tenant improvement to existing 'show suite' to finish the suite into a fully completed office space for Manulife Investment Management. Architectural, Mechanical, and Electrical work is involved. · $92,000
    contractor not published by the City
    Issued
  57. 2020-04-16 To construct Interior Alteration to an existing office building - Manulife Place Suite 2700 Landlord's Work - Demolition of an existing space to return to leasing conditio. · $200,000
    contractor not published by the City
    Issued
  58. 2020-04-09 To construct Interior Alteration to the parkade of an existing office building - Manulife Place 2020 Parkade and Slab-On-Grade Repairs · $167,704
    contractor not published by the City
    Issued
  59. 2020-03-31 To construct Interior Alteration to an existing office building - Manulife Place 26th Floor Lobby and Corridor · $100,000
    contractor not published by the City
    Issued
  60. 2019-11-27 To construct Interior Alteration for a new business - Manulife Place Suite 242 Jamieson's Optical · $150,000
    contractor not published by the City
    Issued
  61. 2019-10-29 To construct interior alterations to part of the 2nd floor of a mixed use commercial building, Suite 242, ''Manulife Place''. Demolition of existing space returning to shell for future tenant fit up, demo/re-construct separation walls from public corridor, relocate entry doors. · $150,000
    contractor not published by the City
    Issued
  62. 2019-10-03 To construct interior alterations within mixed use commercial building -floors 28/29/30 -Remove 28 to 29th floor stair, 29th floor - new suspended ceiling/lighting fire protection, 30 floor - new ceiling, new public corridor partition, lighting, fire protection. · $352,900
    contractor not published by the City
    Issued
  63. 2019-09-19 To construct interior alterations to the 20th floor in a Business & Personal Services building, Manulife Place, "AON". Tenant fit-up, update sprinkler system, add a barrier-free bathroom. · $400,000
    contractor not published by the City
    Issued
  64. 2019-09-18 To construct interior alterations within existing mixed use commercial building - tenant improvement " Vandenberg Jewellery" - Manulife Place Suite 210 · $166,700
    contractor not published by the City
    Issued
  65. 2019-09-13 To construct interior alterations within Manulife Place 13th floor - landlord office fitup for showing purposes - Suite 1335 · $150,000
    contractor not published by the City
    Issued
  66. 2019-08-30 To construct interior alterations within existing office building - Manulife Place 21st Floor - interior demo, no change in core, new ceiling, lights, new sprinkler, new fire alarm - Landlord work · $500,000
    contractor not published by the City
    Issued
  67. 2019-08-23 To construct interior alterations within mixed use commercial building - no change to bldg core/elevator/exits. Office fitup entire 29th floor, partial fitup 30th floor · $1,000,000
    contractor not published by the City
    Issued
  68. 2019-07-16 To construct interior alterations on an existing building. Return suite to base building standard. 20th Floor · $500,000
    contractor not published by the City
    Issued
  69. 2019-06-27 To construct interior alterations to an existing office building. 5th-floor corridor and (Manulife Place) · $150,000
    contractor not published by the City
    Issued
  70. 2019-05-30 To construct interior alterations on an existing building. Return suite to base building standard. Suite 210 · $150,000
    contractor not published by the City
    Issued
  71. 2019-04-23 To construct interior alterations to an existing parkade - Concrete Repairs - Manulife Place Parkade Repairs. · $171,334
    contractor not published by the City
    Issued
  72. 2019-04-10 To construct interior alterations to a suite in an existing office building (SUITE 3500) - Snyder & Associates LLP - MANULIFE PLACE · $400,000
    contractor not published by the City
    Issued
  73. 2019-03-22 To construct interior alterations to an existing office building - To return to base building - 14th floor Manulife Place · $503,000
    contractor not published by the City
    Issued
  74. 2019-02-20 To construct interior alterations to an existing office building - To return a portion of the 12th floor to base building - 12th floor Manulife Place · $202,000
    contractor not published by the City
    Issued
  75. 2019-01-09 To construct interior renovations for a tenant fit out - Yorkton Group. Suite 3180 · $200,000
    contractor not published by the City
    Issued
  76. 2018-11-09 To construct interior alterations to an existing office building.(Unit 580 of Manulife place) · $291,323
    contractor not published by the City
    Issued
  77. 2018-10-25 To construct interior alterations to an existing commercial floor space. Brining suite #210 back to shell condition. Manulife Place. · $130,000
    contractor not published by the City
    Issued
  78. 2018-08-31 To construct interior alterations on the 19th storey of Manulife Place ("CBRE"). · $335,000
    contractor not published by the City
    Issued
  79. 2018-08-31 To replace and maintain fireproofing on loading dock and P1 level ceiling of the parkade of Manulife Place. · $90,000
    contractor not published by the City
    Issued
  80. 2018-08-17 To construct interior renovations to an existing building.(suite 3165) · $60,000
    contractor not published by the City
    Issued
  81. 2018-08-10 To construct interior alterations in an existing office floor space. Crowe MacKay. Suite 2410. · $650,000
    contractor not published by the City
    Issued
  82. 2018-08-09 To construct interior alterations in an existing office floor space. Landlord work is suite 1980, Manulife Place. · $223,894
    contractor not published by the City
    Issued
  83. 2018-08-08 TO construct interior alterations to an existing office use building. Returning 4 suites to finished shell condition, new interior finishes. · $312,000
    contractor not published by the City
    Issued
  84. 2018-07-25 To construct interior alterations to an existing office use building. New interior finishes in the existing 3rd floor health club and locker/change room facilities. · $803,553
    contractor not published by the City
    Issued
  85. 2018-07-17 To construct interior alterations to an existing office use. New finishes and minor partition modifications. · $24,846
    contractor not published by the City
    Issued
  86. 2018-07-06 To construct interior alterations to an existing building - 5th Manulife Place · $20,000
    contractor not published by the City
    Issued
  87. 2018-04-25 To construct interior alterations to 16th floor of Manulife Place. Expansion to the existing office space. Furniture, Finishes, Infill Partitions, Mechanical, and Electrical. (CIBC, Wood Gundy) · $530,000
    contractor not published by the City
    Issued
  88. 2018-04-25 To construct inteiror alterations to a professional office, adding demising wall to current suite. Relocating small meeting rooms, expanding kitchen, relocating plumbing. No core alteration or structural work. (Suite 1280 "Robert Half International" Manulife Place) · $460,000
    contractor not published by the City
    Issued
  89. 2018-03-26 To construct alterations for slab on grade repairs to an existing parkade. Manulife Place · $28,758
    contractor not published by the City
    Issued
  90. 2018-03-14 To Construct interior alterations to an existing office building (landlord fit-up) bringing it to shell space. Suite #1340 Manulife Place · $93,000
    contractor not published by the City
    Issued
  91. 2018-03-12 To construct interior alterations in an existing office in Manulife Place. Third floor unit 360, · $375,000
    contractor not published by the City
    Issued
  92. 2018-02-09 To construct interior alterations to an existing office space in Manulife Place, Suite 2720 - Quinco Financial. Including - mods to ceiling space, hvac, electrical and plumbing · $65,000
    contractor not published by the City
    Issued
  93. 2017-11-06 To construct interior alterations to the 15 and 16 floors of Manulife Place. Build out of offices, meeting rooms, open work areas and servery areas. · $3,000,000
    contractor not published by the City
    Issued
  94. 2017-10-16 To construct interior alterations to the lobby and corridor on the 13th floor of Manulife Place. · $229,000
    contractor not published by the City
    Issued
  95. 2017-08-15 To construct interior alterations at Manulife Place (modifying the existing HVAC and electrical in suite 2720). · $70,000
    contractor not published by the City
    Issued
  96. 2017-05-25 To construct interior alterations on the 13th floor of Manulife Place ("Xerox"; suite #1350). · $228,200
    contractor not published by the City
    Issued
  97. 2017-05-16 To construct interior alterations to an existing mercantile CRU for Blu's Clothing Ltd. · $700,000
    contractor not published by the City
    Issued
  98. 2017-05-12 To Construct interior alterations to an existing office space. (Enbridge Employee Services Canada- 3rd Floor Manulife Place, Phase 1) · $868,840
    contractor not published by the City
    Issued
  99. 2017-05-11 To Construct interior alterations to an existing office space. (Enbridge Employee Services Canada- 3rd Floor Manulife Place, Phase 2) · $699,440
    contractor not published by the City
    Issued
  100. 2017-04-24 To construct interior alterations to a 7th storey suite of Manulife Place (Suite #710; removal of partitions and millwork back to shell building; replacing HVAC; minor repairs to the perimeter drywall and ceiling system). · $82,300
    contractor not published by the City
    Issued
  101. 2017-04-21 To construct interior alterations to the 14th storey of Manulife Place (demolition of existing millwork, plumbing, partitions, ceilings and flooring; repair drywall on perimeter walls, install new ceiling system along with HVAC diffusers and lighting). · $859,800
    contractor not published by the City
    Issued
  102. 2017-03-07 To Construct interior alterations to an existing office space - to demolish only or remove all interior finshes as required prior to the construction of new interior partition walls & finishes. (Enbridge Employee Services Canada- 3rd Floor Manulife Place, Phase 1 & Phase 2)
    contractor not published by the City
    Issued
  103. 2017-02-01 To construct interior alterations to Manulife Place (demolish offices in suite 3500 on the 35th floor to return the space to an empty leasable condition). · $256,000
    contractor not published by the City
    Issued
  104. 2017-01-12 To construct interior alterations to Manulife Place ("Show Suite" #1255 on 12th floor). · $20,000
    contractor not published by the City
    Issued
  105. 2016-09-13 to construct interior alterations to an existing office building, (3rd floor washroom renovation, Manulife Place) · $127,082
    contractor not published by the City
    Issued
  106. 2016-07-11 To Construct interior alterations to an existing food kiosk space. Installing 7' wall & shelving units, removing front counter & installing new counter / shelving units. · $4,423
    contractor not published by the City
    Issued
  107. 2016-06-14 To construct interior alterations to an existing office tower, (corridor enhancements to accomodate pedway connection from Kelly Ramsey) · $65,000
    contractor not published by the City
    Issued
  108. 2016-06-06 To construct an elevated pedway link over 102 Street to connect the Kelly Ramsey Building to the Manulife Building. · $38,425
    contractor not published by the City
    Issued
  109. 2016-06-01 To construct interior alterations to an existing office space - Demo suite for new tenant work. (Manulife Place-Suite 2460) · $25,000
    contractor not published by the City
    Issued
  110. 2016-04-11 to construct interior alterations to an existing office space, (Suite 2220, 22nd fl, Manulife Place) · $40,000
    contractor not published by the City
    Issued
  111. 2016-02-25 To construct interior alterations, new office in an existing office space. (31st floor, Suite 3155 Manulife Place) · $33,581
    contractor not published by the City
    Issued
  112. 2016-01-07 To construct interior alterations. Structural concrete repairs to Level 1 and 2 of an existing parkade. (Commerce Place) · $110,000
    contractor not published by the City
    Issued
  113. 2015-08-21 to construct interior altations to existing office space. tenant improvements · $100,000
    contractor not published by the City
    Issued
  114. 2015-08-20 To construct interior alteration to an existing office building (show sute 3155 Manulife Place) · $53,000
    contractor not published by the City
    Issued
  115. 2015-07-21 To construct interior alterations to an existing office building (Manulife Place, Suite 670) · $262,200
    contractor not published by the City
    Issued
  116. 2015-07-10 To construct interior alterations to an office, Suite 2220 return office to base building. Tenant improvement shall obtain a separate building permit. · $40,000
    contractor not published by the City
    Issued
  117. 2015-04-25 To construct interior alterations to a professional office, 35th floor, "Canada ICI", Manulife Place. · $45,827
    contractor not published by the City
    Issued
  118. 2015-04-14 To construct interior alterations to a professional office, Suite 3560 Manulife Place. · $100,000
    contractor not published by the City
    Issued
  119. 2015-04-14 Repair of concrete to parkade · $22,000
    contractor not published by the City
    Issued
  120. 2015-01-28 To construct interior alterations to an Office, reconfigure "Lan Room" (13-21) PWM "Private Weath Management", Suite 1375 - Manulife Place. · $135,000
    contractor not published by the City
    Issued
  121. 2014-10-03 To construct interior alterations to the 22nd floor at Manulife Place - Suite 2260 (Restore offices to base-building standard only-reinstall ceiling light fixtures, replace damage ceiling tiles) · $200,000
    contractor not published by the City
    Issued
  122. 2014-09-18 To construct interior alterations to the 22nd floor at Manulife Place - Colliers · $400,000
    contractor not published by the City
    Issued
  123. 2014-08-12 To construct interior alterations at 3200 Manulife Place 31st and 32 nd floors. Reynolds Mirth Richards & Farmer LLP · $1,000,000
    contractor not published by the City
    Issued
  124. 2014-03-21 To construct interior alterations to an office building, suite 1940 Manulife Place, Demolish interiors and return to base building. · $40,000
    contractor not published by the City
    Issued
  125. 2014-03-03 To construct interior alterations to an office building, suite 2765 Manulife Place, return to base building. Tenant improvement shall obtain separate building permit. · $45,000
    contractor not published by the City
    Issued
  126. 2014-02-18 To construct interior alterations to the 23rd floor at Manulife Place - Bishop & McKenzie LLP (office renovations). · $1,330,333
    contractor not published by the City
    Issued
  127. 2013-12-17 To construct interior alterations to the 19th floor at Manuklife Place - Knightbridge Career Management · $25,000
    contractor not published by the City
    Issued
  128. 2013-10-18 To construct interior alterations to professional office building, 23rd floor, return to base bldg & ceilinig restoration. · $150,000
    contractor not published by the City
    Issued
  129. 2013-09-26 To construct interior alterations to Manulife Place - Canaccord Genuity, 27th floor. · $302,549
    contractor not published by the City
    Issued
  130. 2013-08-22 To construct interior alterations to a Professional Office (CIBC Wood Gundy, 17th floor Manulife Place). · $160,000
    contractor not published by the City
    Issued
  131. 2013-06-14 To construct interior alteration to a professional office, Suite# 1995, "Felesky Flynn LLP" Manulife Place · $115,000
    contractor not published by the City
    Issued
  132. 2013-04-04 To construct interior alterations to repair a parking structure "Manulife Place". · $35,000
    contractor not published by the City
    Issued
  133. 2013-03-12 To construct interior alterations to a professional office, 28th, 29th and 30th floor, "FMC Law" Manulife Place. · $1,660,000
    contractor not published by the City
    Issued
  134. 2013-02-21 To construct interior alterations to an existing office building - Washroom renovationson floors 3, 5, 16, 20, 21 and Corridor renovations to floors 5 and 16. - Manulife Place · $440,000
    contractor not published by the City
    Issued
  135. 2013-02-19 To construct interior alterations to a professional office, suite# 720, "Conroy Ross Partners" Manulife Place. · $285,000
    contractor not published by the City
    Issued
  136. 2013-02-12 To construct inteiror alterations to a professional office, Suite 1280 "Robert Half International" Manulife Place. · $88,500
    contractor not published by the City
    Issued
  137. 2013-02-05 To construct interior alterations to an existing office space - Manulife Place - Enbridge Pipeleines - 9th floor · $332,484
    contractor not published by the City
    Issued
  138. 2012-12-19 To construct interior alterations for an office, Manulife Distribution, 28th floor. · $160,000
    contractor not published by the City
    Issued
  139. 2012-11-21 To construct interior alterations to a professional office, 9th floor, "Enbridge Pipelines" Manulife Place. · $510,500
    contractor not published by the City
    Issued
  140. 2012-11-16 To construct interior alteration to an office (2740, "Gold Investment Mgmt") · $37,000
    contractor not published by the City
    Issued
  141. 2012-11-16 To construct interior alterations to an existing office space on the 17th and 22nd. floors of the Manulife Building · $33,000
    contractor not published by the City
    Issued
  142. 2012-11-13 To construct interior alterations to an existing Office Building( Main Floor Manulife Place). Washroom renos · $120,000
    contractor not published by the City
    Issued
  143. 2012-10-22 Demolition of interiors only - Main floor - RBC · $50,000
    contractor not published by the City
    Issued
  144. 2012-09-27 To construct interior alterations to a professional office, 10th floor "Enbridge Pipelines Inc." Manulife Place. · $480,000
    contractor not published by the City
    Issued
  145. 2012-09-27 To construct interior alterations to a professional office, 11th floor "Enbridge Pipeline Inc." Manulife Place. · $480,000
    contractor not published by the City
    Issued
  146. 2012-07-26 To construct interior alterations to an existing office - cru 360 · $100,000
    contractor not published by the City
    Issued
  147. 2012-07-20 To constrcut interior alterations to an existing office building - 6th floor. · $600,000
    contractor not published by the City
    Issued
  148. 2012-04-23 To construct interior alteratons to a professional office, 24th floor "Yorkton Group International Ltd", Manulife Place. · $120,000
    contractor not published by the City
    Issued
  149. 2012-04-04 To construct interior alterations to a professional office, 7th floor "Altus Group" Manulife Place. · $100,000
    contractor not published by the City
    Issued
  150. 2012-03-26 To construct interior alterations to a professional office building, "Manulife" washrooms and corridor upgrade. · $900,000
    contractor not published by the City
    Issued
  151. 2012-03-21 To construct Interior Alterations to a Professional, Financial & Office Support Service building. CRU 201 · $800,000
    contractor not published by the City
    Issued
  152. 2012-02-01 To construct interior alterations to an existing professional office, 16th floor, "Wood Gundy" Manulife Place. · $350,000
    contractor not published by the City
    Issued
  153. 2012-01-05 To construct interior alterations to an office building (Law Office 19th Floor) · $50,000
    contractor not published by the City
    Issued
  154. 2011-12-21 Construct Interior Alterations to 2nd floor of Manulife Place - Renovation to existing Washrooms for Barrier Free · $80,000
    contractor not published by the City
    Issued
  155. 2011-10-31 Construct interior alterations to the 34th floor. ( Demolition of interior partitions.) 34th floor · $10,000
    contractor not published by the City
    Issued
  156. 2011-10-19 To construct interior alterations (CRU 160 - Henry Singer). · $365,000
    contractor not published by the City
    Issued
  157. 2011-10-18 To construct interior alterations to a Professional Financial Office Building (34th floor) · $450,000
    contractor not published by the City
    Issued
  158. 2011-09-27 To construct interior alterations to a professional office, 27th floor "Canaccord Wealth Management" Manulife Place. · $38,200
    contractor not published by the City
    Issued
  159. 2011-09-26 To construct interior alterations to Manulife Place - Wood Gundy, 17 and 18th floors. · $1,750,000
    contractor not published by the City
    Issued
  160. 2011-09-20 To Construct Interior Alterations to an Existing Professional, Financial & Office Support Service. · $40,000
    contractor not published by the City
    Issued
  161. 2011-06-28 To construct interior alterations to an existing professional office, 23rd floor, "Wood Gundy". · $150,000
    contractor not published by the City
    Issued
  162. 2011-06-21 To construct interior alterations to an office space - 6th floor, Manulife Financial. · $189,000
    contractor not published by the City
    Issued
  163. 2011-04-05 To construct interior alterations to an existing Professional Financial and Office Support (Floors 7,10,13,17,18,22,26,29,33,34) · $800,000
    contractor not published by the City
    Issued
  164. 2010-07-15 To Construct interior alterations to an existing general retail store, cru# 235 "Vandenberg's Jewellers", Manulife Place · $60,000
    contractor not published by the City
    Issued
  165. 2010-03-22 To construct Parkade Level 1 & Level 2- surface restoration in an existing parkade & to make minor drain modifications.. · $28,000
    contractor not published by the City
    Issued
  166. 2010-01-20 To Construct interior alterations to an existing office building. Floors 12, 19 & 27, lobbies & washrooms renovations. Manulife Building. · $180,000
    contractor not published by the City
    Issued
  167. 2009-12-01 To construct interior alterations to Manulife Place, (Install magnetic lockset, 7th floor.) · $20,943
    contractor not published by the City
    Issued
  168. 2009-09-24 To Construct interior alterations to a retail store " Pravda Shoes " cru # 230 · $55,000
    contractor not published by the City
    Issued
  169. 2009-03-27 To Construct interior restoration to Parkade Levels P1, P2, P3 @ " Manulife Place" · $82,000
    contractor not published by the City
    Issued
  170. 2009-03-19 To Construct interior alterations to lobby 12 th flr of an office Bldg. · $40,000
    contractor not published by the City
    Issued
  171. 2009-03-18 To Construct interior alteration to Suite 2750 (Attain Solutions) on the 27 floor of - Manulife Place · $60,000
    contractor not published by the City
    Issued
  172. 2009-02-23 To Construct interior alteration (Expansion to Suite 2700) Canacord Corporation- 27 floor of Manulife Place · $92,000
    contractor not published by the City
    Issued

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2026-09-10 To revise a Comprehensive Sign Design Plan (510468496-033)(Manulife Place).
    Sign Sign Permit · City file 669609571-002
    Approved
  2. 2026-09-10 To install (2) Fascia Signs (Window Signs) limited to On-premises Advertising (CSDP 669609571-002 | N-09, E-011)(National Bank).
    Sign Sign Permit · City file 664402620-002
    Approved
  3. 2026-06-17 To install (2) Projecting Sign(s) not in the form of a Roof Sign limited to On-premises Advertising (CSDP 510468496-033 | N-02, E-07)(Manulife Place - National Bank).
    Sign Sign Permit · City file 660809689-002
    Approved
  4. 2026-05-14 To install (1) Fascia Sign limited to On-premises Advertising (ref CSDP: 510468496-033 Type 3) (CIBC)
    Sign Sign Permit · City file 656415121-002
    Approved
  5. 2026-04-09 To install (2) Fascia Signs limited to On-premises Advertising (CSDP 510468496-033 | N-01, E-06) (National Bank).
    Sign Sign Permit · City file 653192582-002
    Approved
  6. 2026-03-30 To install (4) Fascia Signs limited to On-premises Advertising, and (2) Projecting Signs not in the form of a Roof Sign limited to On-premises Advertising (CSDP 510468496-033 | E-03, E-04, N-03, W-04, W-10, W-11) (National Bank Centre).
    Sign Sign Permit · City file 643723438-002
    Approved
  7. 2026-01-26 To revise a Comprehensive Sign Design Plan for (510468496-006)(Manulife Place).
    Sign Sign Permit · City file 510468496-033
    Approved
  8. 2025-12-18 To revise the scope of DP#510468496-002, including a removal of the fourth floor/Roof top rehabilitation work and reconfiguration of bike room layout (Manulife Place rehabilitation).
    Other Major Development Permit · City file 510468496-031
    Approved
  9. 2025-07-24 To install (2) Fascia Signs limited to On-premises Advertising (CSDP 510468496-027 | W-08, S-01)(National Bank).
    Sign Sign Permit · City file 517516298-002
    Approved
  10. 2025-05-28 To revise a Comprehensive Sign Design Plan for (510468496-006)(Manulife Place).
    Sign Sign Permit · City file 510468496-027
    Approved
  11. 2024-11-18 To construct exterior alterations to an Office building (enclosed external stairwell connecting the fourth floor rooftop patio to fifth floor of Office tower)
    Alterations Major Development Permit · City file 537890590-002
    Approved
  12. 2024-09-04 To establish a Comprehensive Sign Design Plan for (Manulife Place - Podium Repositioning).
    Sign Sign Permit · City file 510468496-006
    Approved
  13. 2024-07-25 To construct additions, exterior and interior alterations and add Minor Indoor Entertainment to a multi-use commercial building (new facades, creating a new fitness centre, end of trip facility, tenant lounge and pavilion with elevator access at the accessible podium green roof terrace level -Manulife Place).
    Alterations Major Development Permit · City file 510468496-002
    Approved
  14. 2020-03-03 To install (1) Fascia On-premises Sign, and (1) Projecting On-premises Sign (MANULIFE PLACE PARKADE ENTRANCE EXIT).
    Sign Sign Permit · City file 350261477-001
    In review
  15. 2017-08-23 To install (1) Fascia On-premises Sign (Deloitte).
    Sign Sign Permit · City file 255181365-001
    In review
  16. To construct exterior and interior alterations to a multi -use commercial building (façade improvement and landscaping - Manulife Place).
    Alterations Major Development Permit · City file 388026121-002
    Other

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Downtown

10175 101 Street NW
To construct Interior Alterations (tenant improvement) for an office in an existing commercial building. "Parlee McLaws LLP" · contractor not published by the City
2026-10-29
10238 104 Street NW
To construct Interior Alterations to an existing restaurant. Interior finishes and kitchen improvements; and servicing the existing kitchen hood for a new tenant. "Hibachi Teppanyaki and Bar Restaurant" · contractor not published by the City
2026-10-29
10104 103 Avenue NW
To construct Interior Alterations (flooring change, minor demolition, relocate door, relocate electrical panel, move sink, new millwork) to an existing office tower. · contractor not published by the City
2026-10-27
Something wrong on this page? Tell us and we'll check it against the City's records.