Permit GopherAlberta and B.C. property, permit and zoning records

10130 112 Street NW, Edmonton

An address in Wîhkwêntôwin, Edmonton, zoned MU (Mixed Use). 24 building permits are on file, most recently “to construct Interior Alterations (tenant fit-up) in an existing office building. --Rohit…” (issued 9 July 2026). 7 development permits are on file too. The City's 2026 assessed value is $16,920,000. The City of Edmonton does not publish contractor names.

Zoning
MU · Mixed Use
Neighbourhood
Wîhkwêntôwin
Permits on file
24
+ 7 development
Assessed value (2026)
$16,920,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Aerial photo around 10130 112 Street NW, with the address marked
Address point from the City of Edmonton's open data. Aerial photo: City of Edmonton, 2025. Contains information licensed under the Open Government Licence – City of Edmonton.

What this zoning allows

MU · Mixed Use. Mixed use development at varying scales in the nodes and corridors named in statutory plans: housing, recreation, commerce and employment, with buildings designed for pedestrians.

Permitted Residential (limited to Lodging House, Multi-unit Housing, Row Housing, Secondary Suite, Supportive Housing); Food and Drink Service; Indoor Sales and Service; Office; Health Service; Hotel; Minor Indoor Entertainment; Child Care Service; and 20 more

Maximum height
Set by the height modifier on the zoning map (the number after "h", in metres)
Front setback
1.0 m minimum; 3.0 m maximum for ground-floor non-residential uses; 4.5 m for ground-floor housing (3.0 m with a treed boulevard)
Side setback
3.0 m from an abutting site; 0 m up to 23.0 m high beside a commercial or main street site; 6.0 m above 23.0 m
Rear setback
0 m from an alley; 1.0 m where the alley is under 6.0 m wide; 3.0 m above 16.0 m
Secondary suite
Permitted

This zone lists permitted uses only. The bylaw sets setbacks by what the site abuts (a street, an alley or another site); shown here as front, side and rear. Floor area ratio set by the "f" modifier on the zoning map. The page shows the zone without its modifiers. Varies. Setbacks are minimums unless a maximum is stated.

Summary of the City of Edmonton Zoning Bylaw 20001 (amended to 22 September 2026), section 2.80, as read on 30 October 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48110166, 598 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
598
Households
445
Median age
35.2
Median household income (2020)
$56,400
Own their home
24%
Edmonton: 64%
Average household size
1.4
Under 15
4%
65 and over
11%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-07-09 to construct Interior Alterations (tenant fit-up) in an existing office building. --Rohit Founders Office-- · $164,652
    contractor not published by the City
    Issued
  2. 2026-07-02 To construct Interior Alterations (return to shell, core renovation) on the 4th floor of an existing office building (ROHIT 112th Campus South Tower). NOTE future tenant improvement(s) require separate permits. · $232,962
    contractor not published by the City
    Issued
  3. 2024-11-20 To construct Interior Alterations in an existing office building - CUPE office renovation. · $1,568,000
    contractor not published by the City
    Closed
  4. 2024-04-16 to construct Interior Alterations (office renovation) in an existing office building. --Rohit - Campus Tower-- · $250,000
    contractor not published by the City
    Closed
  5. 2023-12-08 To construct Interior Alteration (return to shell)- Demolition & White-boxing (Select demolition, abatement and white-boxing of levels 5 & 6, in the south tower of the 112 Campus building, located at 10130 – 112 Street.) - ROHIT | CAMPUS TOWER - South Tower lvl 5 & 6, · $176,000
    contractor not published by the City
    Issued
  6. 2023-10-20 To construct Exterior Alterations for adding an aluminum door to existing glazing, railing to an existing exterior patio area, and Interior Alterations to add tenant fit-up (a coffee shop). · $150,000
    contractor not published by the City
    Issued
  7. 2023-03-29 To construct Interior Alterations in an existing office building. Renovation and interior office fit-up of floors 2, 3 & and part of floor 1, South side of South Tower. Rohit - Campus Tower TI. · $2,310,000
    contractor not published by the City
    Issued
  8. 2022-12-16 To complete Interior Alterations (return tenant space on 2nd and 3rd floor back to shell space) in an existing office building (Rohit - Campus South Tower) · $83,140
    contractor not published by the City
    Issued
  9. 2022-07-11 To construct Interior Alterations @ main, 2nd & 4 to 7th floors. "Covenant Health" · $4,500,000
    contractor not published by the City
    Issued
  10. 2022-06-06 To construct Interior Alterations @ main, 2nd & 3rd floor. "Covenant Health" · $2,000,000
    contractor not published by the City
    Issued
  11. 2022-03-07 To construct Interior Alterations (7th floor interior alterations and elevator lobby renovation) - Rohit tower. · $550,000
    contractor not published by the City
    Issued
  12. 2021-10-20 To construct Interior Alteration - 10160 112 St - Parking Garage Repairs · $443,612
    contractor not published by the City
    Issued
  13. 2021-09-24 To construct interior alterations within the main floor Business And Personal Services use building - 3-1Hour rated tenant demising walls, 2 smoke separation demising walls for corridor, Fitness center fit-up, 1 New Universal Bf washroom in public corridor. · $500,000
    contractor not published by the City
    Issued
  14. 2021-09-13 To construct interior alterations within a Business And Personal Services building (interior demolition of north and south tower from 2nd floor to 7th floor only). · $450,000
    contractor not published by the City
    Issued
  15. 2021-07-14 To construct Interior Alteration to an existing office building. main floor interior demolition back to base building condition. "Rohit 112th Street Campus" · $225,000
    contractor not published by the City
    Issued
  16. 2019-11-08 To construct interior and exterior alterations in an existing commercial building and minor changes/ upgrades to {Electrical, Sprinklers, Mechanical} - Stantec Building. · $185,000
    contractor not published by the City
    Issued
  17. 2019-08-08 To construct interior alterations on the main floor of an existing office building to add Child Care Services. Edmonton Mennonite Centre for Newcomers Daycare, maximum 61 children, and to construct interior alterations (Main, 2nd, 3rd Floors).Change the use from D to A2 on the main and second floors. Third floor to remain as D Occupancy Main / second / third floors to be used by only one single tenant (Edmonton Mennonite Centre for Newcomers" EMCN"). · $1,965,000
    contractor not published by the City
    Issued
  18. 2019-07-22 To construct selective INTERIOR DEMOLITION ONLY including electrical and mechanical demolition work (Parkade, Main, 2nd, 3rd Floors) - Edmonton Mennonite Centre for Newcomers. · $5,000
    contractor not published by the City
    Issued
  19. 2018-12-18 To construct interior alterations to an existing tenant in the Stantec Building - Capitol Region Housing. · $100,000
    contractor not published by the City
    Issued
  20. 2016-02-12 to construct interior alterations, parking garage ramp repair, (Stantec Building) - 2016 Permit · $125,000
    contractor not published by the City
    Issued
  21. 2013-10-10 To construct interior alterations to an existing office space - Stantec Centre - second floor North Tower and Atrium · $325,459
    contractor not published by the City
    Issued
  22. 2011-09-30 To construct Exterior Alterations to an Office Building, (Installing Solor Panels on a patio roof). Stantec Building. · $44,863
    contractor not published by the City
    Issued
  23. 2009-12-23 To construct exterior alterations to an office building, "Stantec Centre", 2009 West Plaza Concrete Slab Repairs. · $50,000
    contractor not published by the City
    Issued
  24. 2009-09-11 To contruct an Accessory buildilng (generator enclosure) on ground floor and To construct interior alterations w/ 2 new R.T.U.'s to an existing Professional, Financial, and Office Support Service building (Computer Room Expansion @ Stantec Centre on P2 Level). · $90,000
    contractor not published by the City
    Issued

Development permits

The City's decisions on what may be built or how the property may be used, which come before the building permit. The City publishes no applicant for these.

  1. 2024-07-23 To install (1) Fascia Sign(s) limited to On-premises Advertising (Edmonton Mennonite Centre for Newcomers)
    Sign Sign Permit · City file 516900822-002
    Approved
  2. 2024-06-19 To install (2) Fascia Sign(s) limited to On-premises Advertising (Covenant Health / Rohit)
    Sign Sign Permit · City file 514626399-002
    Approved
  3. 2024-01-04 To install (3) Fascia Signs limited to On-premises Advertising (ROHIT | ROAM CAFE).
    Sign Sign Permit · City file 491605352-002
    Approved
  4. 2023-09-12 To operate a Restaurant with 134 m2 Public Space and 36 seats and to construct exterior and interior alterations (outdoor patio and new exterior door)
    Alterations Major Development Permit · City file 481042389-002
    Approved
  5. 2022-09-16 To install (2) Fascia On-Premises Signs (ONE TWELVE CAMPUS)
    Sign Sign Permit · City file 445333363-002
    Approved
  6. 2019-07-22 To add Child Care Services on the main floor of a Professional, Financial and Office Support Services building (Edmonton Mennonite Centre for Newcomers Daycare, maximum 61 children).
    Other Major Development Permit · City file 311363118-001
    Approved
  7. 2019-07-17 To construct exterior and interior alterations to an existing Professional, Financial and Office Support Services Use building (new doors, concrete sidewalks and ramp both on-site and off-site on City Road Right-Of-Way).
    Alterations Major Development Permit · City file 310764920-001
    Approved

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Wîhkwêntôwin

9833 110 Street NW
To construct Interior Alterations (concrete column repairs) in the parkade of an existing residential apartment building (Le Jardin Apartments). · contractor not published by the City
2026-10-28
10236 123 Street NW
To Demolish an existing multi-unit residential building. “Kathryn Manor” (Built 1960) · contractor not published by the City
2026-10-05
11523 100 Avenue NW
To construct Interior Alterations (tenant improvement) for an office in an existing commercial building. · contractor not published by the City
2026-09-25
Something wrong on this page? Tell us and we'll check it against the City's records.