Permit GopherAlberta and B.C. property, permit and zoning records

4000 Glenmore Co SE, Calgary

An address in Ogden, Calgary, zoned C-COR3 (Commercial - Corridor 3). 21 building permits are on file, most recently “Interior Alteration - New Office Suite Expansion” (issued 13 September 2024). The City's 2026 assessed value is $6,300,000.

Zoning
C-COR3 · Commercial - Corridor 3
Neighbourhood
Ogden
Permits on file
21
Assessed value (2026)
$6,300,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 4000 Glenmore Co SE, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Calgary's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – City of Calgary.

What this zoning allows

C-COR3 · Commercial - Corridor 3. Mid-scale retail and medium to large eating and drinking uses along major roads, with direct vehicle access, landscaped edges and no residential uses.

Permitted Park; Utilities; in an existing approved building: Retail and Consumer Service; Restaurant: Food Service Only (public area under 300 m2); Restaurant: Licensed (public area under 300 m2); Convenience Food Store; Office; Health Care Service; and 23 more

Discretionary The uses permitted in an existing building, when in a new building or addition; Drinking Establishment — Small; Drinking Establishment — Medium; Liquor Store; Cannabis Store; Child Care Service; Hotel; Gas Bar; and 41 more

Maximum height
Set by the "h" number on the land use map, in metres
Front setback
6.0 m
Side setback
3.0 m beside a commercial parcel or a lane; 1.2 m beside an industrial parcel; 6.0 m beside a residential or special purpose parcel, a street, or a lane across from a residential parcel
Rear setback
3.0 m beside a commercial parcel or a lane; 1.2 m beside an industrial parcel; 6.0 m beside a residential or special purpose parcel, a street, or a lane across from a residential parcel
Secondary suite
Not listed

Floor area ratio set by the "f" number on the land use map; parcels at most 3.2 ha; a Retail and Consumer Service or Supermarket at most 3,600.0 m2. No residential uses. Uses listed for an existing approved building are discretionary in a new building or addition. The bylaw sets setbacks by what the parcel shares a line with (a street, a lane or another parcel); shown here as front, side and rear. Also subject to the general rules for commercial districts (Part 7, Division 1). Varies. Setbacks are minimums unless a maximum is stated.

Summary of the City of Calgary Land Use Bylaw 1P2007 (amended to 15 September 2026), sections 813 to 827, as read on 3 November 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48061190, 655 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
655
Households
215
Median age
38.4
Median household income (2020)
$66,000
Own their home
44%
Calgary: 69%
Average household size
2.6
Under 15
20%
65 and over
10%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2024-09-13 Interior Alteration - New Office Suite Expansion · $150,000
    TRIBUILD CONTRACTING
    Closed
  2. 2022-07-10 Edon Glenmore Commerce Court - Interior Renovation · $565,000
    no contractor listed
    Closed
  3. 2020-08-12 Interior Alterations · $32,000
    IRONCLAD WINDOWS & DOORS
    Closed
  4. 2017-06-22 Canadian Western Bank Interior Alterations # 285 · $29,000
    no contractor listed
    Closed
  5. 2016-04-12 Driver Check (Occupational Health Clinic) · $66,713
    STRATEGIC CONSTRUCTION (SCL)
    Closed
  6. 2014-12-08 Interior Alteration of an exsiting Group D office for future Group D tenant · $52,762
    applicant withheld (individual)
    Closed
  7. 2014-10-01 Interior alteration new tenant · $47,913
    no contractor listed
    Closed
  8. 2014-03-05 Interior Alteration · $200,000
    no contractor listed
    Closed
  9. 2012-06-21 Repair · $60,000
    CANEM SYSTEMS
    Closed
  10. 2010-10-14 Interior Alteration · $28,200
    PRIME PROJECTS
    Closed
  11. 2010-07-06 Interior alteration · $250,000
    W D CONSTRUCTION & MILLWORK
    Closed
  12. 2010-05-07 Interior Partition for New medical office · $19,500
    no contractor listed
    Closed
  13. 2010-03-25 Interior partitioning · $45,000
    applicant withheld (individual)
    Closed
  14. 2010-03-25 Interior partitioning · $15,300
    applicant withheld (individual)
    Closed
  15. 2008-03-24 Interior Partitioning · $12,000
    ABM GENERAL CONTRACTING
    Closed
  16. 2007-07-19 Interior Partitioning · $132,000
    ABM GENERAL CONTRACTING
    Closed
  17. 2005-07-07 Interior Alteration · $10,500
    PCL CONSTRUCTION MANAGEMENT
    Closed
  18. 2003-09-24 Interior alterations & use confirmation · $2,000
    no contractor listed
    Closed
  19. 2002-05-23 Interior Renovations-Medical Clinic · $35,000
    BASE CONSTRUCTION
    Closed
  20. 2000-07-18 int.part. · $8,000
    no contractor listed
    Closed
  21. Modern Diamond Brokers
    no contractor listed
    Closed

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in Ogden

7430 20 St SE
Secondary Suite · applicant withheld (individual)
2026-10-29
7634 22A St SE
Secondary Suite · no contractor listed
2026-10-26
7044 Ogden Rd SE
· applicant withheld (individual)
2026-10-21
Something wrong on this page? Tell us and we'll check it against the City's records.