Permit GopherAlberta and B.C. property, permit and zoning records

3425 22 St SW, Calgary

An address in South Calgary, Calgary, zoned C-COR1 (Commercial - Corridor 1). 20 building permits are on file, most recently “Leasehold improvements - Float Life Demolition” (issued 2 April 2026). The City's 2026 assessed value is $13,000,000.

Zoning
C-COR1 · Commercial - Corridor 1
Neighbourhood
South Calgary
Permits on file
20
Assessed value (2026)
$13,000,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 3425 22 St SW, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Calgary's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – City of Calgary.

What this zoning allows

C-COR1 · Commercial - Corridor 1. Storefronts along a continuous block face, close to the street and sidewalk, with commercial uses on the ground floor and homes or offices above.

Permitted Park; Utilities; in an existing approved building: Retail and Consumer Service; Restaurant: Food Service Only (public area up to 150 m2); Restaurant: Licensed (public area up to 150 m2); Convenience Food Store; Office; Health Care Service; and 14 more

Discretionary The uses permitted in an existing building, when in a new building or addition; Dwelling Unit; Live Work Unit; Drinking Establishment — Small; Drinking Establishment — Medium; Liquor Store; Cannabis Store; Child Care Service; and 28 more

Maximum height
Set by the "h" number on the land use map, in metres
Front setback
None required; at most 3.0 m from a commercial street
Side setback
None beside a commercial parcel or a lane; 1.2 m beside an industrial parcel; 3.0 m beside a residential or special purpose parcel, or across a lane from a residential one
Rear setback
None beside a commercial parcel or a lane; 1.2 m beside an industrial parcel; 3.0 m beside a residential or special purpose parcel, or across a lane from a residential one
Secondary suite
Not listed

Floor area ratio set by the "f" number on the land use map. Ground-floor uses at most 465.0 m2 each (a Supermarket 1,400.0 m2, a restaurant's public area 300.0 m2); homes, offices, clinics and similar uses not on the ground floor facing a commercial street; at least 20 % of the floor area in commercial uses. Uses listed for an existing approved building are discretionary in a new building or addition. The bylaw sets setbacks by what the parcel shares a line with (a street, a lane or another parcel); shown here as front, side and rear. Also subject to the general rules for commercial districts (Part 7, Division 1). Varies. Setbacks are minimums unless a maximum is stated.

Summary of the City of Calgary Land Use Bylaw 1P2007 (amended to 15 September 2026), sections 776 to 795, as read on 3 November 2026. A summary, not the bylaw: Direct Control, overlays and site-specific conditions can change these rules. Confirm with the City before relying on it.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48060751, 984 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
984
Households
540
Median age
34.4
Median household income (2020)
$101,000
Own their home
50%
Calgary: 69%
Average household size
1.9
Under 15
14%
65 and over
8%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-04-02 Leasehold improvements - Float Life Demolition · $65,738
    FWD CONSTRUCTION
    Closed
  2. 2024-08-08 Masa Mama · $100,000
    no contractor listed
    Closed
  3. 2023-12-01 Interior alterations · $30,000
    no contractor listed
    Closed
  4. 2021-04-06 Fresh Kitchen Take and Go · $24,000
    CRAFTED EDGE HOMES
    Closed
  5. 2017-05-01 Medical office expansion · $120,600
    no contractor listed
    Closed
  6. 2016-09-19 New tenant fit-out for Float Life - Group D · $200,000
    no contractor listed
    Closed
  7. 2016-08-10 Interior Alteration - Group A2 - Counterpoint Dance · $201,000
    no contractor listed
    Closed
  8. 2016-06-24 Group A2 ¿ 2014 ABC, 3.2.2.24, Distilled Beauty Bar & Cafe · $180,000
    no contractor listed
    Closed
  9. 2016-01-07 Interior Alteration - Group D - Essence Wellness · $76,000
    no contractor listed
    Closed
  10. 2015-12-15 New tenant fit out · $637,647
    no contractor listed
    Closed
  11. 2015-12-04 Interior alterations - bakery store · $140,000
    SUMMIT BROOKE CONSTRUCTION
    Closed
  12. 2015-12-01 interior alteration for new Licensed Restaurant · $150,000
    no contractor listed
    Closed
  13. 2015-11-09 DR ANDREW CHEN ORTHODONTIST - Garrison Corner · $345,000
    W D CONSTRUCTION & MILLWORK
    Closed
  14. 2015-10-08 Interior Alterations - Group A2, First Tenant (Village Ice Cream) · $150,000
    no contractor listed
    Closed
  15. 2015-09-29 Interior Alteration - Group B2 Daycare - Kids & Co. · $900,000
    no contractor listed
    Closed
  16. 2015-06-30 New tenant fit-out for David's Tea · $80,000
    no contractor listed
    Closed
  17. 2014-12-08 Mixed Use 3-Storey Building · $11,000,000
    no contractor listed
    Closed
  18. 2012-10-30 No description
    DEVITT & FORAND CONTRACTORS
    Closed
  19. 2012-10-30 No description
    DEVITT & FORAND CONTRACTORS
    Closed
  20. 2008-05-09 No description
    applicant withheld (individual)
    Closed

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in South Calgary

1508 34 Av SW
18-unit residential building with attached open air storey storage garage · KELLER CONSTRUCTION
2026-10-29
2009 33 Av SW
Interior Alterations · no contractor listed
2026-10-28
1531 33 Av SW
Open-air storey storage garage · EAGLE CREST CONSTRUCTION
2026-10-22
Something wrong on this page? Tell us and we'll check it against the City's records.