3330 Hospital Dr NW, Calgary

An address in St. Andrews Heights, Calgary, zoned S-CI (Special Purpose - Community Institution). 159 building permits are on file, most recently “Interior alterations” (issued 19 June 2026). The City's 2026 assessed value is $530,080,000.

Zoning
S-CI · Special Purpose - Community Institution
Neighbourhood
St. Andrews Heights
Permits on file
159
Assessed value (2026)
$530,080,000
Owner names are not part of the City's open data and are never shown. Sold prices are not municipal open data and are not shown. Assessed value is the City's estimate for property tax, not a sale price.
Plan of the block around 3330 Hospital Dr NW, drawn from City open data, with the address marked
Parcel outlines, street centrelines and address points from the City of Calgary's open data, drawn by Permit Gopher; not an official plan. Contains information licensed under the Open Government Licence – City of Calgary.

Neighbourhood profile

From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48060132, 488 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.

People
488
Households
185
Median age
46.8
Median household income (2020)
$186,000
Own their home
84%
Calgary: 69%
Average household size
2.6
Under 15
16%
65 and over
21%
Income in the 2021 Census is for the year 2020. Statistics Canada rounds counts and does not publish some figures for very small areas.

Permit history

  1. 2026-06-19 Interior alterations · $6,483,144
    CANA CONSTRUCTION
    Issued
  2. 2026-06-16 Interior alterations - niversity of Calgary B031/B032 Lab Renovations · $295,000
    DELNOR CONSTRUCTION
    Issued
  3. 2025-10-23 BAS210162 CWPH EIC Renovation · $1,021,000
    CANA MANAGEMENT
    Closed
  4. 2025-08-12 Interior alterations · $191,558
    no contractor listed
    Closed
  5. 2025-08-11 HSC 2570 Mosquito Lab · $150,000
    PATMAR DEVELOPMENTS
    Closed
  6. 2025-08-07 Interior · $212,000
    ELLISDON CONSTRUCTION SERVICES
    Closed
  7. 2025-03-13 Interior · $102,500
    no contractor listed
    Closed
  8. 2025-02-25 University of Calgary HMRB CL3 Lab Expansion · $6,000,000
    ELLISDON CONSTRUCTION SERVICES
    Closed
  9. 2024-12-18 Interior · $240,000
    no contractor listed
    Closed
  10. 2024-09-26 Fire Suppression Upgrade · $26,310
    no contractor listed
    Issued
  11. 2024-08-23 Interior alteration - HSC ATSSL CLINICAL SKILLS LAB · $1,352,938
    no contractor listed
    Closed
  12. 2024-05-06 Good earth - HRIC · $200,000
    no contractor listed
    Closed
  13. 2024-03-19 Interior alterations. · $999,995
    CANA CONSTRUCTION
    Closed
  14. 2023-10-05 Uof C 808 HSC Fire Suppression Upgrades · $194,120
    no contractor listed
    Closed
  15. 2023-06-21 Interior Alteration - Electrical alteration · $36,750
    no contractor listed
    Closed
  16. 2023-05-16 Fire Alarm Upgrade
    no contractor listed
    Closed
  17. 2022-11-23 Interior Alterations · $985,000
    no contractor listed
    Closed
  18. 2022-09-15 Interior Alterations · $415,405
    no contractor listed
    Closed
  19. 2022-06-06 Fire Alarm Upgrade · $20,000
    CANEM SYSTEMS
    Closed
  20. 2022-03-19 CMR220013 HMRB Washroom Renovations · $190,000
    no contractor listed
    Closed
  21. 2022-01-21 Interior alterations · $185,194
    no contractor listed
    Closed
  22. 2021-09-01 U of C Teaching, Research & Wellness - BAS 190097 Lab Renovation · $45,000
    no contractor listed
    Closed
  23. 2021-08-23 Interior alterations · $139,472
    no contractor listed
    Closed
  24. 2021-08-19 U of C Health Research Innovation Centre - BAS 190115 Research Lab Renovation · $125,000
    no contractor listed
    Closed
  25. 2020-12-29 Interior alteration (U of C). · $210,000
    no contractor listed
    Closed
  26. 2020-11-25 U of C Health Sciences Centre Washroom Renewal · $274,950
    no contractor listed
    Closed
  27. 2020-10-28 Foothills Medical Center Parkade Lots 6 and 8 - Fall protection, perimeter and stairwells. · $1,050,000
    IMPACT CONSTRUCTION
    Closed
  28. 2020-10-13 Fire Pump Repair & Replacement - Fire Pump Repair & Replacement · $30,372
    no contractor listed
    Closed
  29. 2020-07-09 Group B2 Hospital · $400,000
    CANA CONSTRUCTION
    Closed
  30. 2020-06-26 Foothills Medical Center - repairs to parkade structures, Lots 3, 6 and 8 · $350,000
    no contractor listed
    Closed
  31. 2020-03-26 U of C Health Science Centre - Stair EF20 Renovation · $480,000
    CANA CONSTRUCTION
    Closed
  32. 2020-03-09 Interior alterations of a small suite for use as Indigenous Hub-Health Service Centre (HSC) Room G-801F · $119,000
    no contractor listed
    Closed
  33. 2019-09-26 Interior Alterations · $83,000
    no contractor listed
    Closed
  34. 2019-01-25 Leasehold Improvement - CFI Hall Grimsson Lab Reno · $730,000
    no contractor listed
    Closed
  35. 2018-11-19 Washrooms Renewal - Health Sciences Centre · $274,000
    no contractor listed
    Closed
  36. 2018-11-07 Bioinformatics at U of C Health Science Centre on Level 2 · $360,600
    no contractor listed
    Closed
  37. 2018-06-18 Interior Alteration - Laboratory 2545 Renovation · $250,000
    no contractor listed
    Closed
  38. 2018-06-15 Interior Alteration - Group D - Helios Wellness Centre - U of C · $10,000
    no contractor listed
    Closed
  39. 2018-06-08 Group D/ A2 Office/ Assembly · $1,400,000
    no contractor listed
    Closed
  40. 2018-04-25 Group D Office · $926,000
    no contractor listed
    Closed
  41. 2018-04-25 Uof C Optogenetics Lab Renovation · $1,593,800
    no contractor listed
    Closed
  42. 2018-04-24 Health Sciences Centre 2044 West Lab Renovation · $150,000
    no contractor listed
    Closed
  43. 2017-08-25 Interior Alteration - Group D - UVCM Offices · $1,700,000
    no contractor listed
    Closed
  44. 2017-07-17 Interior Demolition - Group D · $70,000
    no contractor listed
    Closed
  45. 2017-06-12 Interior alteration existing tenant · $391,480
    no contractor listed
    Closed
  46. 2017-05-17 Interior Alteration - Upgrade to Power Generator · $587,700
    no contractor listed
    Closed
  47. 2017-04-17 Interior Alteration - U of C Students Centre · $345,000
    no contractor listed
    Closed
  48. 2017-04-03 Interior Alteration - CCRP Laboratory Refurbishment · $2,358,982
    no contractor listed
    Closed
  49. 2017-01-23 Interior Alteration - Lab Renovation · $1,000,000
    no contractor listed
    Closed
  50. 2016-12-05 Western Canadian Microbiome Centre (WCMC) - Germ Free Platform · $4,700,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  51. 2016-08-09 Interior Alterations - Helath Science Centre (U of C) · $1,140,000
    no contractor listed
    Closed
  52. 2016-06-08 No description · $550,000
    no contractor listed
    Closed
  53. 2016-06-07 Fire Alarm Upgrades - Health Science Centre Elevators · $37,960
    CANEM SYSTEMS
    Closed
  54. 2016-02-09 No description · $1,792,500
    no contractor listed
    Closed
  55. 2015-09-23 Fire alarm upgrade · $62,480
    no contractor listed
    Closed
  56. 2015-09-18 Alberta Children's Hospital Research Institute Laboratory Renovation · $5,454,000
    no contractor listed
    Closed
  57. 2015-07-29 Fire Alarm Upgrade - U of C Research Lab · $52,800
    no contractor listed
    Closed
  58. 2014-12-18 Interior Alteration - U of C Health Sciences - Vet Med Lab · $188,900
    no contractor listed
    Closed
  59. 2014-12-02 Interior alterations / existing tenant · $1,100,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  60. 2014-10-15 Covered exterior storage compound for bicycles. · $391,000
    no contractor listed
    Closed
  61. 2014-10-15 Interior Office Alterations · $2,600,000
    no contractor listed
    Closed
  62. 2014-07-24 No description · $44,963
    no contractor listed
    Closed
  63. 2014-06-10 U of C Health Sciences Room G202 Theatre renovations · $430,000
    no contractor listed
    Closed
  64. 2014-03-12 interior partitioning · $190,000
    no contractor listed
    Closed
  65. 2014-03-11 interior partitioning · $395,200
    no contractor listed
    Closed
  66. 2014-02-21 Interior Alteration · $150,000
    EVEREST CONSTRUCTION MANAGEMENT
    Closed
  67. 2014-02-18 Lab renovation · $283,500
    no contractor listed
    Closed
  68. 2014-01-09 Interior Partitioning · $449,600
    PCL CONSTRUCTION MANAGEMENT
    Closed
  69. 2013-10-23 Interior Alteration (Heritage Medical Ceiling Work) · $37,000
    STARCRAFT CONSTRUCTION
    Closed
  70. 2013-09-30 Upgrade to Service Shaft Only · $632,104
    PCL CONSTRUCTION MANAGEMENT
    Closed
  71. 2013-07-25 Commercial Interior Partition · $2,456,300
    PCL CONSTRUCTION MANAGEMENT
    Closed
  72. 2013-04-17 new exterior door & atrium · $2,500
    no contractor listed
    Closed
  73. 2013-04-09 Interior alteration · $110,000
    EVEREST CONSTRUCTION MANAGEMENT
    Closed
  74. 2013-03-25 Commercial Interior Partition · $400,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  75. 2013-03-12 Interior Alteration for an Existing Tenant · $275,000
    no contractor listed
    Closed
  76. 2013-01-03 Interior Alteration · $2,775,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  77. 2012-12-14 Interior Alteration · $195,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  78. 2012-10-09 Interior alteration · $1,364,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  79. 2012-07-04 Commercial Project ( interior & exterior changes) · $2,718,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  80. 2012-03-12 Commercial Interior Partition · $1,351,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  81. 2012-02-24 Interior alteration · $1,680,000
    CHANDOS CONSTRUCTION
    Closed
  82. 2012-01-12 Interior partition · $135,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  83. 2012-01-12 Commercial Interior Partition · $1,168,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  84. 2011-05-18 Interior alteration and use · $137,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  85. 2011-04-20 Interior partioning/ exhaust system · $2,250,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  86. 2010-12-21 Proj/Bus Name: Health Sciences Library & Thetre Infill General Contractor: PCL CONSTRUCTION MANAGEMENT *** · $1,879,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  87. 2010-11-15 Interior partition · $6,000,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  88. 2010-07-16 Commercial Interior Partition · $5,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  89. 2010-07-08 Commercial Project · $7,000,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  90. 2010-07-05 Commercial Interior Partition · $779,800
    PCL CONSTRUCTION MANAGEMENT
    Closed
  91. 2010-04-19 Interior alteration · $110,000
    no contractor listed
    Closed
  92. 2010-04-06 Int alt · $1,499,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  93. 2010-03-23 Int alt · $1,426,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  94. 2010-02-08 Renovations/Interior Partition for Library (HSC building) · $3,689,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  95. 2010-01-28 Interior partitioning · $30,000
    no contractor listed
    Closed
  96. 2010-01-27 Interior Partition/Renovations to HSC Infection/immunity/inflammation building · $8,662,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  97. 2010-01-06 Interior Alterations · $80,000
    no contractor listed
    Closed
  98. 2009-12-14 Fire Alarm Upgrade to HSC + HMRB Building · $3,195,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  99. 2009-09-08 Commercial Interior Partition · $1,502,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  100. 2009-08-26 Int Alt · $100,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  101. 2009-07-20 Commercial Interior Partition · $93,500
    PCL CONSTRUCTION MANAGEMENT
    Closed
  102. 2009-07-10 Interior partitioning · $460,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  103. 2009-06-12 Interior partitioning · $300,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  104. 2009-05-20 Interior demolition · $60,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  105. 2009-05-12 Interior Alteration · $2,500,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  106. 2009-03-26 Commercial Interior Partition and Business Use Confirmation · $2,684,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  107. 2009-03-02 Interior Alteration · $1,100,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  108. 2008-07-25 Commercial Interior Partition and Business Use Confirmation · $1,135,500
    PCL CONSTRUCTION MANAGEMENT
    Closed
  109. 2008-07-25 Commercial Interior Partition and Business Use Confirmation · $1,800,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  110. 2008-07-16 Commercial Interior Partition · $150,000
    no contractor listed
    Closed
  111. 2008-06-12 Commercial Interior Partition · $5,400,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  112. 2008-05-21 Commercial Interior Partition · $1,419,500
    PCL CONSTRUCTION MANAGEMENT
    Closed
  113. 2008-02-15 Interior alteration · $1,188,540
    PCL CONSTRUCTION MANAGEMENT
    Closed
  114. 2007-12-18 Commercial Interior Partition · $4,000,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  115. 2007-12-18 No description · $110,000
    MADAROCH CONSTRUCTION
    Closed
  116. 2007-09-11 Interior alternation · $2,200,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  117. 2007-07-31 Interior alteration · $843,500
    PCL CONSTRUCTION MANAGEMENT
    Closed
  118. 2007-06-25 Interior Alteration · $3,000,000
    no contractor listed
    Closed
  119. 2007-04-19 Interior Partitioning · $1,056,000
    MADAROCH CONSTRUCTION
    Closed
  120. 2007-03-06 Interior Alterations · $3,100,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  121. 2007-01-24 Interior Alteration and Use Confirmation · $497,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  122. 2006-11-21 interior alterations - lobby area on 1st to 6th floors · $2,500,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  123. 2006-10-17 Interior partitioning · $250,000
    no contractor listed
    Closed
  124. 2006-10-10 Commercial Interior Partition · $1,400,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  125. 2006-10-06 Commercial Interior Partition · $5,700,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  126. 2006-10-06 Commercial Interior Partition · $3,400,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  127. 2006-10-06 Commercial Interior Partition · $4,900,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  128. 2006-09-14 No description · $845,000
    MADAROCH CONSTRUCTION
    Closed
  129. 2006-03-20 Commercial Project (Addition) · $500,000
    no contractor listed
    Closed
  130. 2006-01-30 Commercial Interior Partition and Business Use Confirmation · $504,300
    PCL CONSTRUCTION MANAGEMENT
    Closed
  131. 2005-12-21 Addition to Power Plant · $2,535,552
    ELLISDON CONSTRUCTION
    Closed
  132. 2005-11-01 Temporary construction offices only · $50,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  133. 2005-09-22 Commercial Interior Partition · $396,000
    no contractor listed
    Closed
  134. 2004-11-22 Interior Partioning (Cabling Upgrade) · $439,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  135. 2004-09-15 New commercial building · $17,016,108
    ELLISDON CONSTRUCTION
    Closed
  136. 2004-03-29 Addition · $70,149,105
    PCL CONSTRUCTION MANAGEMENT
    Closed
  137. 2004-03-18 Interior Alteration · $4,032,000
    no contractor listed
    Closed
  138. 2004-03-15 New building · $32,915,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  139. 2004-02-24 Int Alt · $2,000,000
    no contractor listed
    Closed
  140. 2003-10-20 Interior alteration (demo) · $150,000
    no contractor listed
    Closed
  141. 2001-11-26 Interior Alteration · $250,000
    PCL CONSTRUCTION MANAGEMENT
    Closed
  142. 2001-07-16 Interior Alterations · $600,000
    no contractor listed
    Closed
  143. 2001-03-06 Interior partioning for laboratory use - existing tenant · $275,000
    HEATHERBRAE CONSTRUCTION CO
    Closed
  144. 2001-02-01 Interior Partitioning · $18,860
    PATMAR DEVELOPMENT
    Closed
  145. 2001-01-17 No description · $60,000
    no contractor listed
    Closed
  146. 2000-12-21 Interior Partitioning for research laboratory · $44,588
    LEAR CONSTRUCTION MANAGEMENT
    Closed
  147. 2000-07-04 interior alterations · $232,599
    no contractor listed
    Closed
  148. 2000-06-27 Interior Office Renovations · $40,000
    STARCRAFT CONSTRUCTION
    Closed
  149. 2000-06-09 No description · $1,955,000
    STUART OLSON CONSTRUCTION
    Closed
  150. 2000-04-05 alterations · $240,571
    LEAR CONSTRUCTION MANAGEMENT
    Closed
  151. 2000-03-30 No description · $74,188
    LEAR CONSTRUCTION MANAGEMENT
    Closed
  152. 2000-03-01 Lab Renovations · $150,000
    no contractor listed
    Closed
  153. 2000-02-08 Interior Alteration for Storage · $53,750
    OPRON CONSTRUCTION COMPANY
    Closed
  154. 1999-12-06 Interior alterations · $55,000
    STARCRAFT CONSTRUCTION
    Closed
  155. 1999-12-01 University Office Interior Alteration · $51,700
    no contractor listed
    Closed
  156. No description · $116,152
    TROTTER & MORTON BUILDING TECHNOLOGIES
    In review
  157. No description · $130,000
    no contractor listed
    In review
  158. Interior alteration
    no contractor listed
    Closed
  159. Additon to Existing Parkade
    no contractor listed
    Closed

Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]

Recent permits in St. Andrews Heights

1643 St Andrews Pl NW
Garage · RECTANGLE DESIGN
2026-10-23
1643 St Andrews Pl NW
SEMI-D,BSMT-DEV,FIREPLACE,DECK,PORCH,SSuite · RECTANGLE DESIGN
2026-10-23
1643 St Andrews Pl NW
Garage · RECTANGLE DESIGN
2026-10-23