Help: This address page
What this page does
This page shows what the city's open data records for one address: the zoning and what it means, the neighbourhood, every building permit on file and, where the city publishes it, the assessed value. It also shows the property on the city's aerial photo or a drawn plan, a 2021 Census profile of the small area around it, and recent permits nearby. Free, no account. Owner names and sold prices are never shown; the assessed value is the city's estimate for property tax, not a sale price.
How to use it
- Read the top lines for the summary: zoning, neighbourhood, number of permits and assessed value.
- Use + and − on the plan to zoom in and out.
- Scroll to Permit history for every permit on the lot: what was done, when, by which company, the value and the status.
- Click a nearby permit to open its address, or This week's permit digest → for the whole city.
- Something looks wrong? Use the Tell us link at the bottom and we'll check it against the city's records.
1440 Aviation Pa NE, Calgary
An address in Calgary International Airport, Calgary, zoned S-CRI (Special Purpose - City and Regional Infrastructure). 829 building permits are on file, most recently “YYC Domestic Terminal Restoration Concourse B - TP4.3 Building Envelope” (issued 26 October 2026). The City's 2026 assessed value is $5,690,000.
Neighbourhood profile
From the 2021 Census, for the small area around this address that Statistics Canada calls a dissemination area (48060938, 277 people). Statistics Canada draws these areas; they are not the City's neighbourhoods.
Permit history
-
2026-10-26
YYC Domestic Terminal Restoration Concourse B - TP4.3 Building Envelope · $11,000,000
PCL CONSTRUCTION MANAGEMENT Issued -
2026-09-07
YYC Washroom Refresh Plan - Men's Washroom · $2,357,000
no contractor listed Issued -
2026-08-07
Who's Who at the Zoo Concourse A · $120,000
no contractor listed Issued -
2026-08-06
DTB Pre & Post Roof Replacement · $64,424,396
PCL CONSTRUCTION MANAGEMENT Issued -
2026-08-05
YYC PSL Door Relocation Departures DTB · $119,243
no contractor listed Issued -
2026-07-17
No description
BIRD CONSTRUCTION COMPANY Issued -
2026-07-02
YYC Accessibility Program - Pre-Security · $179,000
V CONTRACTING Issued -
2026-06-16
Fire Alarm repair/upgrade · $10,000
no contractor listed Closed -
2026-06-07
YYC Concourse B Seismic Upgrades · $2,000,000
PCL CONSTRUCTION MANAGEMENT Issued -
2026-06-04
NPS-V South Checkpoint Relocation · $5,000,000
no contractor listed Issued -
2026-03-12
Aspire Chinook Lounge Concourse A Renovation · $950,000
LEDCOR CONSTRUCTION Closed -
2026-03-11
Fire alarm repair · $10,000
SELETECH ELECTRICAL* Issued -
2026-02-11
Medicine and Health Coaching
no contractor listed Issued -
2026-02-10
Elevator Fire Alarm and Modernization Upgrades · $100,000
no contractor listed Issued -
2026-02-05
Interior Alterations Adding Treatment Rooms · $10,000
no contractor listed Issued -
2026-01-29
Interior Renovation · $250,000
SWIFT BUILDERS Closed -
2026-01-26
DTB Departures New Female Washrooms · $3,624,000
no contractor listed Issued -
2026-01-13
Cleanslate Cleaning Supplies Expansion · $250,000
no contractor listed Issued -
2025-12-17
Secure Luggage Coat Check Storage Room ITB · $182,930
no contractor listed Closed -
2025-12-15
Renovation Westjet Hub Control Centre · $2,000,000
CHANDOS CONSTRUCTION Issued -
2025-12-02
New fids/gids screens · $50,000
no contractor listed Closed -
2025-10-13
Golf Cart Storage and Charging Space · $120,000
no contractor listed Closed -
2025-10-03
YYC Domestic Terminal Restoration Concourse B Demolition · $6,000,000
PCL CONSTRUCTION MANAGEMENT Issued -
2025-10-02
Racking System · $67,602
CAM INDUSTRIAL SUPPLY Closed -
2025-09-02
New Sports Facility · $6,000,000
COVERCO BUILDINGS Issued -
2025-08-29
WestJet Airports/Inflight/HCC Consolidation Project · $2,000,000
no contractor listed Closed -
2025-08-13
DTB Roof Restoration Concourse A · $8,933,055
PCL CONSTRUCTION MANAGEMENT Issued -
2025-07-28
Interior alts, Mezzanine, FA alts · $5,000
NCI CONSTRUCTION Closed -
2025-07-11
HMS Temporary Bar Kiosk ITB #A1202AV · $250,000
no contractor listed Closed -
2025-06-24
Interior alteration · $2,000,000
no contractor listed Closed -
2025-06-20
Temporary Structure · $20,000
no contractor listed Closed -
2025-06-16
Interior Alteration (SSP Storage and Prep Kitchen) · $1,000,000
no contractor listed Closed -
2025-06-05
Interior Alterations Suites 202 & 204 · $50,000
STANLEY REGAN CONSTRUCTION Closed -
2025-05-23
YYC DTB Concourse B Roof Restoration · $9,880,000
PCL CONSTRUCTION MANAGEMENT Issued -
2025-05-14
Washroom Refresh Project Terminal Ops Relocation · $250,000
no contractor listed Closed -
2025-05-06
Westjet Employee Lounge Expansion · $900,000
CHANDOS CONSTRUCTION Closed -
2025-05-02
Interior alterations - Tacos Locos · $450,000
no contractor listed Closed -
2025-05-01
Sunwest Aviation Temporary G7 Processing Area · $720,000
CANA MANAGEMENT Closed -
2025-04-14
Aerospace Innovation Hub · $1,700,000
PCL CONSTRUCTION MANAGEMENT Closed -
2025-03-21
Calgary Rotary Challenger Park - fire panel replacement · $10,000
PETERSEN CONTRACTING Closed -
2025-03-11
FedEx Ground Side Equipment Storage Facility · $925,245
no contractor listed Closed -
2025-01-31
New Combi Oven · $15,000
no contractor listed Issued -
2025-01-25
Pre-Security Centralized Passenger Screening Alterations · $20,404,006
ELLISDON CONSTRUCTION SERVICES Issued -
2025-01-16
Tasting Room & Kitchen Trolley 5 · $30,000
no contractor listed Issued -
2025-01-06
Vestibule smoke detector and fire alarm recall relays. · $100,000
TROTTER & MORTON BUILDING TECHNOLOGIES Closed -
2024-11-23
Relocation of Fire Shutter and Baggage Equipment · $146,000
PCL CONSTRUCTION MANAGEMENT Closed -
2024-11-23
Aspire Transborder Lounge Expansion · $600,000
LEDCOR CONSTRUCTION Closed -
2024-11-14
WESTJET Lounge Densification Departures · $20,000
no contractor listed Closed -
2024-11-06
Fire Alarm Repair · $2,000
no contractor listed Closed -
2024-11-04
Interior alterations · $200,500
no contractor listed Closed -
2024-10-17
Stack & Press Delicatessen Restaurant · $700,000
no contractor listed Closed -
2024-09-16
Mucho Burito Take-Out · $200,000
no contractor listed Closed -
2024-09-06
Fire Alarm panel replacement
no contractor listed Closed -
2024-08-13
Selective Pallet Racking Techtop Canada · $56,855
no contractor listed Closed -
2024-08-08
ITB & Cargo Buildings Roof Antennas CBSA · $113,520
no contractor listed Issued -
2024-07-30
Phil & Sebastian Food and Beverage Take-Out · $484,548
no contractor listed Closed -
2024-07-29
New Office Space · $10,000
SORORA CONSTRUCTION Closed -
2024-07-25
Wander by Nicole Gomes Restuarant · $2,770,270
no contractor listed Closed -
2024-07-22
SSP Mi Casa Restaurant ITB Terminal · $1,677,600
no contractor listed Closed -
2024-06-10
ALPA 7th Floor Office Fit-Out · $150,000
no contractor listed Closed -
2024-05-23
Air Canada Facility Refresh · $50,000
no contractor listed Issued -
2024-05-21
Banff Collective Retail Store ITB Space 5 · $175,000
PCL CONSTRUCTION MANAGEMENT Closed -
2024-05-21
Space 6 Inmotion New Tenant Retail · $105,000
PCL CONSTRUCTION MANAGEMENT Closed -
2024-05-16
Ora-Oxygen Spa Tenant Fit out · $50,000
no contractor listed Closed -
2024-05-15
Tim Hortons Concrete Slab on Grade · $33,000
KOR ALTA CONSTRUCTION Issued -
2024-05-07
Peak of the Market Racking Only · $60,000
ECONO-RACK GROUP (2015) Closed -
2024-05-03
Sprinkler standpipe alteration (YYC Parkade P1). · $4,907,000
PCL CONSTRUCTION MANAGEMENT Closed -
2024-04-25
Existing Airport Fire Hall to Westjet Renovation · $2,600,000
no contractor listed Closed -
2024-04-10
Fire Sprinkler Restoration Zone CC2A 2024 · $695,813
no contractor listed Issued -
2024-04-01
Fire Alarm Repair · $9,512
no contractor listed Closed -
2024-03-18
Shell Gas Bar Tim Hortons · $300,000
no contractor listed Closed -
2024-02-21
Fire Alarm Repair · $5,100
no contractor listed Closed -
2024-02-20
Bad Egg Breakfast Shack Tenant Fit-Out · $750,000
no contractor listed Closed -
2024-01-15
Concealed Space Sprinkler Removal · $50,000
PCL CONSTRUCTION MANAGEMENT Closed -
2024-01-04
Stack and Press Delicatessen Tenant Fit-Out · $750,000
no contractor listed Issued -
2023-12-21
Fire Alarm DTB Terminal Elevator 45D & 57D Modernization · $150,000
TROTTER & MORTON BUILDING TECHNOLOGIES Closed -
2023-12-19
Sprinkler Replacement Program Zone WT10D · $467,893
no contractor listed Closed -
2023-11-29
Storage Racking Only · $257,000
no contractor listed Issued -
2023-11-16
Inmotion Space 2 Tenant Fit-Out · $140,000
PCL CONSTRUCTION MANAGEMENT Closed -
2023-11-15
Reader Rock Garden Fit-Out · $120,000
PCL CONSTRUCTION MANAGEMENT Issued -
2023-11-14
Frontier Provisions Tenant Fit-Out · $215,000
PCL CONSTRUCTION MANAGEMENT Closed -
2023-11-09
Elbow River Exchange Tenant Fit-Out · $260,000
PCL CONSTRUCTION MANAGEMENT Closed -
2023-08-21
Starbucks Concourse A Departures · $425,000
LEDCOR CONSTRUCTION Closed -
2023-07-18
Fire Alarm Alteration · $1,000
no contractor listed Closed -
2023-06-30
Sprinkler Protection Replacement CB1A 2023 · $2,576,025
PCL CONSTRUCTION MANAGEMENT Closed -
2023-06-27
YYC Backflow A & C Revamp ITB Arrivals · $340,000
V CONTRACTING Issued -
2023-06-12
Departures Transborder Duty Free Renovation · $200,000
no contractor listed Closed -
2023-05-30
Summit House Tenant Fit-Out · $800,000
LEDCOR CONSTRUCTION Closed -
2023-05-30
Bell Helicopter Racking Only Permit · $44,167
COMMANDER WAREHOUSE Closed -
2023-05-18
ATCO Modular Classrooms · $2,213,375
WESTCOR CONSTRUCTION Closed -
2023-05-10
New Switchgear Room DTB Concourse B · $1,400,000
PCL CONSTRUCTION MANAGEMENT Issued -
2023-05-09
Tim Hortons Renovation Departures Concourse A · $380,000
no contractor listed Closed -
2023-05-04
Pallet Racking Only · $35,000
no contractor listed Closed -
2023-04-20
Phase 1 Paint Storage Room Only · $684,000
GRAHAM CONSTRUCTION & ENGINEERING Closed -
2023-03-20
DTB Starbucks Renovation - Concourse B · $260,000
LEDCOR CONSTRUCTION Closed -
2023-03-02
Racking Only · $22,000
NORSON CONSTRUCTION Issued -
2023-02-22
Loading Dock Regrading · $100,000
no contractor listed Closed -
2023-02-09
Paint Booths Fix Auto Training Centre · $533,058
applicant withheld (individual) Closed -
2023-01-31
Renovtion of FA 111 Multipurpose Piston Lab / Woodshop · $150,000
WESTCOR CONSTRUCTION Closed -
2023-01-30
Starbucks Gate D Remodel ITB · $50,000
LEDCOR DESIGN-BUILD (ALBERTA) Closed -
2023-01-18
YYC Fire Sprinkler Protection System 2022 CC1A · $2,045,624
PCL CONSTRUCTION MANAGEMENT Closed -
2023-01-17
YYC Fire Sprinkler Protection System 2023 CB3D · $1,791,613
PCL CONSTRUCTION MANAGEMENT Issued -
2023-01-02
Westjet Training Centre Washroom Expansion · $219,828
CANA CONSTRUCTION Closed -
2022-12-05
YYC Air Cargo Tenant Improvement · $1,600,000
no contractor listed Closed -
2022-11-30
New DTB Passenger Back Flow Device Concourse A & C · $98,000
no contractor listed Issued -
2022-11-29
Airport Shell Carwash · $1,500,000
no contractor listed Closed -
2022-11-29
New Shell Gas Canopy/C-Store & Charging Canopy · $3,500,000
no contractor listed Closed -
2022-11-23
Fire Alarm Repair
no contractor listed Closed -
2022-11-18
USCBP Operation Upgrades · $400,000
no contractor listed Closed -
2022-10-24
Chachi's Relocation Mezzanine Level DTB · $129,000
BLUE ROCK CONSTRUCTION MANAGEMENT Closed -
2022-10-17
Skyline Central Fill Calgary Shoppers Drug Mart Distribution Centre · $500,000
no contractor listed Closed -
2022-10-07
Retail Base Building Upgrades Concourse B & C · $501,600
no contractor listed Closed -
2022-10-07
Tim Hortons Concourse C Departures Level · $285,000
no contractor listed Closed -
2022-10-05
New Jugo Juice DTB Concourse A · $240,000
WESTCAN BUILDERS Closed -
2022-09-28
Install Service Crane on Westjet WBH · $201,000
CANA MANAGEMENT Closed -
2022-09-28
Renovation for the Airport Police Station · $1,407,171
PCL CONSTRUCTION MANAGEMENT Closed -
2022-09-21
Interior Alterations - Fit-Out for Charge Solar · $210,000
no contractor listed Closed -
2022-09-19
Deville Coffee Tenant Fit-Out - Arrivals Level DTB · $149,000
BLUE ROCK CONSTRUCTION MANAGEMENT Closed -
2022-08-31
DTB Sprinkler Replacement 2022 Program · $1,896,616
PCL CONSTRUCTION MANAGEMENT Closed -
2022-08-30
New Offices · $45,000
ETS GROUP Closed -
2022-08-03
Replacing Existing Damaged Demising Wall · $151,000
SCOTT BUILDERS Issued -
2022-04-12
Jiffy Lube Storage Building Addition · $25,000
CENTCOM CONSTRUCTION Issued -
2022-03-21
Racking Only · $9,390
no contractor listed Issued -
2022-02-02
Interior Alteration - Offices/Washrooms · $700,000
YYC PROPERTY SOLUTIONS Closed -
2021-11-03
Sprinkler upgrade. · $1,200
no contractor listed Closed -
2021-11-01
First Tenant - Interior Fit-Out Hongye Ecommerce · $80,000
no contractor listed Closed -
2021-11-01
Racking · $50,000
no contractor listed Closed -
2021-10-27
YYC Sprinkler Restoration/Replacement - Zone CC4D · $550,000
PCL CONSTRUCTION MANAGEMENT Closed -
2021-10-18
Canadian Fiber Optics Tenant Fit-Out · $15,999
NORCAL CONSTRUCTION Closed -
2021-09-15
Group F2 Racking · $7,400
G N JOHNSTON EQUIPMENT Closed -
2021-09-13
Calgary Airport - ITB Dividing Wall · $217,000
no contractor listed Issued -
2021-08-05
Interior Tenant Fit-out - Abbey's Creations · $150,000
no contractor listed Closed -
2021-06-29
New Last Best Brewing Restaurant · $546,300
no contractor listed Closed -
2021-06-08
Interior Alteration - Tenant Space Expansion Renovation · $47,458
PANEL CONSTRUCTION COMPANY Closed -
2021-05-31
Fix Network Regional Headquarters & Training Facility Interior Alterations · $1,250,000
CHANDOS CONSTRUCTION Closed -
2021-05-20
New Tenant - Starbucks Coffee Concourse A · $418,000
no contractor listed Closed -
2021-04-12
Exterior Grain Silo for Existing Brewery · $10,000
no contractor listed Closed -
2021-03-10
Replacement of the Fabric Skin on Hanger Flight Museum Structure · $115,900
applicant withheld (individual) Issued -
2021-03-09
Interior Alterations - North Hydration Tenant Fit-Out · $80,000
NORCAL CONSTRUCTION Closed -
2021-01-29
COVID 19 Sample Collection Site · $1,000
no contractor listed Closed -
2021-01-19
Transfer Facility for Hazardous and Dangerous Waste · $120,000
no contractor listed Closed -
2021-01-07
Racking - Bell Helicopter · $34,066
COMMANDER WAREHOUSE Closed -
2020-12-10
MRO Electronics - Selective Rack Storage System · $6,100
CAM INDUSTRIAL SUPPLY Closed -
2020-11-30
YYC High Speed Transfer Switch Building · $200,000
no contractor listed Closed -
2020-10-28
Interior Alteration - New Brewery/Distillery · $180,000
no contractor listed Closed -
2020-10-26
Fire Alarm System Modification - New Remote Annunciator · $13,190
TYCO INTEGRATED FIRE & SECURITY Closed -
2020-10-05
Interior Alterations, Group D · $40,000
no contractor listed Closed -
2020-09-16
Interior Demo - Group A2 - Injnation · $30,000
TALLY CONSTRUCTION Closed -
2020-09-16
Interior Alteration - 7th Floor Office Fit-out for Airline Pilots Association · $118,120
no contractor listed Closed -
2020-08-06
Axiom Office - fire alarm upgrade · $1,000
no contractor listed Closed -
2020-07-20
Pro Bindery Services Tenant Fit-Out · $35,000
NORCAL CONSTRUCTION Closed -
2020-07-13
Sweet Factory Renovation · $40,000
no contractor listed Closed -
2020-06-10
Fire Alarm Repair - 58 AERO DR NE · $1,500
STAMPEDE ELECTRIC Closed -
2020-06-08
Fire Alarm Repair - 49 AERO DR NE · $1,500
STAMPEDE ELECTRIC Closed -
2020-06-08
Fire Alarm Repair · $1,500
STAMPEDE ELECTRIC Closed -
2020-06-08
Fire Alarm Repair · $1,500
STAMPEDE ELECTRIC Closed -
2020-05-12
Bell Helicopter - Fire Alarm Upgrade · $2,800
no contractor listed Closed -
2020-04-29
Subway Renovation - Concourse A · $50,000
no contractor listed Closed -
2020-04-20
MRO Electronics - Racking Only · $3,000
CAM INDUSTRIAL SUPPLY Closed -
2020-02-28
Interior Alteration - MRO Electronics Fit-up · $140,000
no contractor listed Closed -
2020-02-24
Jugo Juice Concourse C · $90,000
WESTCAN BUILDERS Closed -
2020-02-06
Interior Alteration - Transport Canada SEP Office · $279,000
PCL CONSTRUCTION MANAGEMENT Closed -
2020-01-29
Hudson News - Renovations ans Expansion Concourse A DTB · $510,000
no contractor listed Closed -
2020-01-20
Concourse E Tim Hortons (ITB) · $100,000
no contractor listed Issued -
2020-01-16
Hudson News Concourse A - DTB · $300,000
no contractor listed Closed -
2019-12-16
Westjet - Calgary Airport Lounge · $5,670,000
no contractor listed Closed -
2019-11-27
Interior alterations · $200,000
no contractor listed Closed -
2019-11-27
Hudson Retail - Concourse C Departures Level DTB · $200,000
no contractor listed Closed -
2019-11-06
North Water Processing Facility · $106,900
NORCAL CONSTRUCTION Closed -
2019-10-28
Tim Hortons Take Out - ITB Concourse D International Departures Level · $200,000
no contractor listed Closed -
2019-10-21
Renovation La Prep Restaurant Concourse A Departures · $100,000
no contractor listed Closed -
2019-10-11
Skyway Wine & Liquor - Concourse A/C and Arrivals Level · $435,738
PCL CONSTRUCTION MANAGEMENT Closed -
2019-10-09
Jugo Juice - Arrivals Hall (DTB) · $120,000
no contractor listed Closed -
2019-10-03
Storage Racking Only · $13,780
no contractor listed Closed -
2019-10-03
Interior Alterations - Ulilities Level Sprinkler Pipe Restoration · $1,278,925
no contractor listed Closed -
2019-09-19
Interior Alteration - Rundle Essentials Concourse C · $220,000
no contractor listed Closed -
2019-09-19
First Tenant - Industrial Rope Access Training Facility · $48,000
NORCAL CONSTRUCTION Closed -
2019-09-17
Interior Alteration Group E Retail · $360,000
no contractor listed Closed -
2019-08-28
Westjet Check-in - Arrivals & Departures · $4,000,000
no contractor listed Closed -
2019-08-22
Interior Alteration - Made Foods Store Concourse A (DTB) · $140,000
no contractor listed Closed -
2019-08-22
Interior Alteration - Chili's Restaurant Concourse C (DTB) · $60,000
no contractor listed Closed -
2019-08-21
Interior Alterations- Urban Attitude Retail Store · $361,000
no contractor listed Closed -
2019-08-19
No Boundaries Retail Store - Concourse C · $110,000
no contractor listed Closed -
2019-08-12
No Boundaries Retail Store - Concourse A · $260,000
no contractor listed Closed -
2019-08-12
Edo Japan Renovation · $100,000
no contractor listed Closed -
2019-08-12
Interior Alteration - Relay Retail Store · $400,000
no contractor listed Closed -
2019-08-08
Interior Alterations - Chili's Restaurant · $80,000
no contractor listed Closed -
2019-07-29
Interior Alteration - New Barcelos Nordel Restaurant · $500,000
no contractor listed Closed -
2019-07-18
Interior Alterations - YYC Retail Program Base Building Upgrades · $1,100,000
no contractor listed Issued -
2019-07-16
Fire Alarm Alteration · $1,100
no contractor listed Closed -
2019-07-12
Interior Alterations - Racking only · $30,000
no contractor listed Closed -
2019-07-10
Interior Alteration - Flames Grill Restaurant · $790,000
no contractor listed Closed -
2019-07-08
Demolition - Life is Good Closure · $6,300
DARDON DEVELOPMENTS Closed -
2019-06-19
YYC Pre Board Screening B Interm Solution (DTB) · $1,586,000
no contractor listed Closed -
2019-05-07
Interior Alteration - Masonry Block Wall Openings & Demo · $15,000
SORORA CONSTRUCTION Closed -
2019-05-06
Interior Alteration - Racking Only · $100,000
no contractor listed Closed -
2019-04-22
Interior Alteration - Relay Retail Store Concourse C · $400,000
WESTCAN BUILDERS Closed -
2019-04-18
Interior Alterations - A Touch of Petals ITB Arrivals Hall · $10,000
AMAZING CONSTRUCTIONS Closed -
2019-04-12
Interior Alteration - 7-Eleven Retail Store Concourse C · $320,000
no contractor listed Closed -
2019-04-12
Interior Alteration - New 7-Eleven DTB Arrivals · $320,000
no contractor listed Closed -
2019-04-09
Interior Alteration - Relay Temporary Kiosk · $17,655
WESTCAN BUILDERS Closed -
2019-03-25
Interior Alterations - Air Canada Concierge Office · $70,000
no contractor listed Closed -
2019-03-25
Interior Alteration - Banff Hall Experience Lab · $420,000
no contractor listed Closed -
2019-02-05
YYC Airport Tunnel VESDA Pipe Replacement · $288,775
UNITECH ELECTRICAL CONTRACTING Closed -
2019-01-08
Interior Alteration - Physio Massage · $100,000
no contractor listed Closed -
2019-01-08
New Warehouse Pump Room · $30,000
SORORA CONSTRUCTION Closed -
2018-12-10
WestJet Wide Body Hangar - Racking · $142,392
no contractor listed Closed -
2018-11-29
Calgary Airport Air Canada STOC Room Upgrades · $300,000
no contractor listed Closed -
2018-11-29
Group F2/ D Industrial/ Office · $60,000
LYNCO INTERIOR SERVICES Closed -
2018-11-06
Interior Alteration - First Tenant · $683,972
no contractor listed Closed -
2018-11-05
Coinmatic Laundry Services Tenant-Fit Out · $68,000
PERSIMMON CONTRACTING Closed -
2018-10-15
[name withheld] - New Mezzanine Office · $250,000
no contractor listed Closed -
2018-10-09
Roof top antennas and equipment · $100,000
no contractor listed Closed -
2018-09-18
New Tenant Interior Alteration - The Burger Federation Restaurant · $145,560
no contractor listed Closed -
2018-08-02
Fedex warehouse modification-new conveyor · $148,820
BIGFOOT INDUSTRIAL SERVICES Closed -
2018-07-13
Interior Alterations - Additional Racking · $30,000
no contractor listed Closed -
2018-07-09
Interior Alteration - 8th Floor Offices · $140,000
no contractor listed Closed -
2018-06-26
Airport Corporate Centre - Integrated Operations Command Centre · $300,000
no contractor listed Closed -
2018-06-14
Interior alteration · $3,700
no contractor listed Closed -
2018-06-12
Exterior Alteration · $35,000
no contractor listed Closed -
2018-06-05
Global Landmark - Selective Rack Storage System · $69,000
no contractor listed Closed -
2018-05-23
Steel Racking - Emco Calgary · $55,000
no contractor listed Closed -
2018-05-11
Westjet Cabin Trainer Fit-up · $540,000
no contractor listed Closed -
2018-05-01
Interior Alteration - Vino Volo - YYC Domestic Terminal Building · $200,000
no contractor listed Closed -
2018-04-24
Interior alterations · $165,000
no contractor listed Closed -
2018-04-18
demising - no tenants · $48,000
no contractor listed Closed -
2018-04-13
Interior office alterations and new OH door. · $270,000
no contractor listed Closed -
2018-04-02
Interior Alterations - I Love Kick Boxing Buildout · $234,812
no contractor listed Closed -
2018-03-29
Interior Alteration - New Edo Japan Restaurant · $250,000
no contractor listed Closed -
2018-02-12
New Westjet Wide Body Aircraft Hanger · $41,500,000
CANA CONSTRUCTION Closed -
2018-01-17
McCall Hotel Mock-Up Suite · $50,000
no contractor listed Closed -
2018-01-02
Tenant Fit-Up - Utility Level · $600,000
no contractor listed Closed -
2017-12-19
Aircraft Hanger Office Tenant Improvement · $350,000
LA VITA PROPERTIES Closed -
2017-12-12
Air Canada Check-in Alterations · $3,250,000
no contractor listed Closed -
2017-11-30
Macs Store - Interior Partition Display Board · $9,000
no contractor listed Closed -
2017-11-27
Westjet Campus Security Upgrades · $392,115
no contractor listed Closed -
2017-11-24
The Local Bistro Restaurant · $110,000
no contractor listed Closed -
2017-11-09
Rack Storage System - Mapei Warehouse · $54,000
G N JOHNSTON EQUIPMENT Closed -
2017-10-23
Fire Alarm Panel replacement · $3,000
no contractor listed Closed -
2017-10-19
Fresh Bites - Food Production & Packaging for Aircraft · $350,000
no contractor listed Closed -
2017-10-17
Opening in warehouse Demising Wall · $5,000
no contractor listed Closed -
2017-10-13
Group F2 Racking · $53,000
no contractor listed Closed -
2017-09-29
support of new RTU · $2,000
SORORA CONSTRUCTION Closed -
2017-09-28
Palmer Road Hanger Upgrades - Bays #1, #2 & #3 · $1,395,014
no contractor listed Closed -
2017-09-20
Solo Liquor Retail - Bay #134 · $148,543
no contractor listed Closed -
2017-09-18
No description · $88,000
no contractor listed Closed -
2017-09-08
first tenant fit out - restaurant · $700,000
no contractor listed Closed -
2017-08-30
Haines Jones Cadbury - Racking · $64,000
no contractor listed Closed -
2017-08-23
Interior alteration (Racking) - Group F2 · $172,467
no contractor listed Closed -
2017-08-03
Interior alteration new tenant · $140,000
NCI CONSTRUCTION Closed -
2017-07-20
Departures Level CATSA PBS Line Reconfiguration · $1,659,000
no contractor listed Closed -
2017-06-29
Interior Alteration - Transport Canada · $675,052
no contractor listed Closed -
2017-06-22
Interior Alteration - Pallet Racking · $65,216
no contractor listed Closed -
2017-06-21
New barrier free washrooms in basement · $70,000
no contractor listed Closed -
2017-06-08
YYC ITB Sterile Corridor Doors · $185,000
no contractor listed Closed -
2017-05-29
2017 Canadian Cancer Society Relay for Life · $2,282
GOOD TIME PARTY RENTALS Closed -
2017-05-11
YYC McCall Way Pump Station Enclosure · $300,000
no contractor listed Closed -
2017-04-26
Mitek · $520,000
no contractor listed Closed -
2017-04-18
New Exterior Windows - West Elevation · $30,000
no contractor listed Closed -
2017-03-27
Hudson News Kiosk - Gates 21-24 DTB · $100,000
no contractor listed Closed -
2017-03-21
Interior Alteration - Aero Mexico Office · $10,000
no contractor listed Closed -
2017-03-16
Warehouse Racking · $312,000
no contractor listed Closed -
2017-03-13
27 kV Calgary airport switchgear building (new) · $200,000
no contractor listed Closed -
2017-03-09
YYC Baggage Handling System Replacement DTB · $29,356,848
no contractor listed Closed -
2017-03-07
No description · $19,302
no contractor listed Closed -
2017-01-04
PSL Realignment - DTB · $596,100
no contractor listed Closed -
2016-12-07
Aviation Commercial Crossing Phase 3 · $2,600,000
SCOTT BUILDERS Closed -
2016-11-23
Interior Alterations - Archway Office/Warehouse · $550,000
no contractor listed Closed -
2016-11-18
New Car Rental Booths in F3 Parkade - ENTERPRISE YYC · $300,000
no contractor listed Closed -
2016-11-18
Parkade & Terminal Counter Reno - HERTZ YYC · $560,000
no contractor listed Closed -
2016-11-08
Racking Only - Area B · $495,000
no contractor listed Closed -
2016-10-06
Baggage Handling System Temporary - Check-in Hall · $4,070,351
no contractor listed Closed -
2016-09-29
Glycol Treatment Blower Building · $1,990,150
no contractor listed Closed -
2016-09-26
International wing hainan airline office · $60,000
no contractor listed Closed -
2016-09-19
Fire Alarm Upgrade, Enterprise Rent a Car · $4,000
PRO-TECH FIRE AND SAFETY Closed -
2016-09-15
Concourse C Air Canada Ramp Upgrades · $350,000
no contractor listed Closed -
2016-09-02
Group F2 Industrial · $12,000
no contractor listed Closed -
2016-08-25
New Communications Room DTB (ATB) - #A74H02 · $155,700
no contractor listed Closed -
2016-08-25
Westjet Fire Alarm Replacement and Sprinkler Upgrades · $2,026,400
CANA CONSTRUCTION Closed -
2016-08-24
Concourse B Regional Upgrades · $1,627,656
no contractor listed Closed -
2016-08-22
Inja Nation Chlildren's Recreation Centre · $450,000
no contractor listed Closed -
2016-08-03
Fed ex ground modifications · $550,000
no contractor listed Closed -
2016-07-14
Selective Interior Demo Only - Fedex Ground Substation · $20,000
SCOTT BUILDERS Closed -
2016-07-11
Westjet Encore - New Euro Cafe Tenant · $200,000
no contractor listed Closed -
2016-06-28
Show Suite 7th Floor - Airport Corporate Centre · $80,000
PERSIMMON CONTRACTING Closed -
2016-06-27
YYC Westjet Elevator Replacement · $900,000
STUART OLSON CONSTRUCTION Closed -
2016-06-16
Temporary Tent - White Hatter Lunch - June 28, 2016
no contractor listed Closed -
2016-06-16
Terminal Conectivity Program Gates 21-24 Widening · $22,110,000
no contractor listed Closed -
2016-06-10
Group F2 Warehouse Racking Only · $8,800
no contractor listed Closed -
2016-05-31
Westjet 5th Floor Tenant Interior Fit-up · $80,999
CANA CONSTRUCTION Closed -
2016-05-26
Special Events - Canadian Cancer Society Relay for Life · $3,889
no contractor listed Closed -
2016-05-24
YYC West Field Electrical Centre Building · $2,600,000
no contractor listed Closed -
2016-05-11
Hide n' seek · $165,000
no contractor listed Closed -
2016-04-13
No description · $338,000
CANA CONSTRUCTION Closed -
2016-04-12
Replacement of Fire Alarm Panel Only · $1,200
no contractor listed Closed -
2016-03-23
New Fire Alarm System - South Location · $80,000
no contractor listed Closed -
2016-03-22
New racking · $40,000
no contractor listed Closed -
2016-03-04
Interior Alteration - A & W restaurant refit - ATB · $10,000
no contractor listed Closed -
2016-02-25
Yyc cococo chocolatiers storage space · $25,000
no contractor listed Closed -
2016-02-10
Interior Alteration - Stella On The Bow - Arrivals Check-in Hall - IFP · $50,000
no contractor listed Closed -
2016-02-08
Airport GSE Building · $5,400,000
SBL CONTRACTORS Closed -
2016-01-11
Interior Alteration - DeBeers Group of Companies Tenant Fit-up · $865,040
no contractor listed Closed -
2016-01-11
Interior alteration - The Boxer Shoppe Retail - ATB · $90,000
no contractor listed Closed -
2015-12-28
No description · $35,000
no contractor listed Closed -
2015-12-23
Interior Alteration - Westjet Ramp and Airlines Offices - IFP · $960,484
no contractor listed Closed -
2015-12-23
Interior Alteration - Tim Horton's - Ticketing Lobby Check-In Hall - IFP · $250,000
no contractor listed Closed -
2015-12-23
Interior Alteration - Vino Volo - Transborder Departures - IFP · $620,000
no contractor listed Closed -
2015-12-23
Interior Alteration - Belgian Beer Cafe - Transborder Departures - IFP · $80,000
no contractor listed Closed -
2015-12-22
Interior Alteration - Swissport Transborder Lounge - IFP · $680,000
no contractor listed Closed -
2015-12-22
Interior Alteration - Swissport International Lounge - IFP · $680,000
no contractor listed Closed -
2015-12-17
Addition to Westjet Temporary Encore & Walkway/Holdroom · $4,520,000
no contractor listed Closed -
2015-12-14
Interior Alteration - RAF (United Kingdom) Ramp Offices - IFP · $89,000
no contractor listed Closed -
2015-12-08
Interior Alteration - ATS- Ramp Offices G & H · $300,000
no contractor listed Closed -
2015-12-03
Interior Alteration - Delta Airways YYC Operations Centre - IFP · $60,000
no contractor listed Closed -
2015-11-26
Interior Alteration - Whos Who in the Zoo - International Departures - IFP · $60,000
no contractor listed Closed -
2015-11-26
Interior Alteration - Whos Who in the Zoo - Transborder Departures - IFP · $60,000
no contractor listed Closed -
2015-11-25
Interior Alteration - United Airlines Ramp Offices - IFP · $105,000
no contractor listed Closed -
2015-11-19
Interior Alteration - United Airlines Airport Ticket Offices (ATO) - IFP · $100,000
no contractor listed Closed -
2015-11-18
Interior Alteration - United Airlines BSO Baggage and Break Rooms - IFP · $80,000
no contractor listed Closed -
2015-11-16
Interior Alteration - yyc british airways - IFP · $79,427
no contractor listed Closed -
2015-11-04
Interior Alteration - Alaska Airlines Ramp Office Transborder Pier - IFP · $132,764
no contractor listed Closed -
2015-11-04
Interior Alteration - IFP Swissport Ramp L1/L2 Offices · $250,800
no contractor listed Closed -
2015-11-04
Interior Alteration - IFP Swissport Ramp M Office Arrivals · $398,970
no contractor listed Closed -
2015-11-04
Interior Alteration - British Airways Operations Centre - IFP · $162,828
no contractor listed Closed -
2015-10-27
Interior Alteration - Chili's Texas Grill International Departures - IFP · $300,000
no contractor listed Closed -
2015-10-26
Interior Alteration - HMS Host Utility Level Storage Space - IFP · $10,000
no contractor listed Closed -
2015-10-26
Interior Alteration - Westjet Training Room · $500,000
no contractor listed Closed -
2015-10-22
A & W Restaurant Cosmetic Refit Alterations · $30,000
no contractor listed Closed -
2015-10-22
Interior Alteration - Starbucks Int. Departures - IFP · $175,000
no contractor listed Closed -
2015-10-21
Interior alterations - warehouse/office · $63,000
no contractor listed Closed -
2015-10-20
TRANS-NORTHERN PIPELINES within Airway Crossing 2 · $400,000
no contractor listed Closed -
2015-10-19
Interior Alteration - Opa! of Greece - Transborder Departures - IFP · $285,000
no contractor listed Closed -
2015-10-08
Interior Alteration - Burger King - Transborder Departures - IFP · $200,000
no contractor listed Closed -
2015-10-05
Interior Alteration - Wolfgang Puck - Transborder Departures - IFP · $1,695,432
no contractor listed Closed -
2015-10-02
Interior Alteration - Sterling North (Aurora) Learning Centre · $328,000
no contractor listed Closed -
2015-09-29
Interior Alterations - Heritage Trading Post - Transborder Departures - IFP · $74,000
no contractor listed Closed -
2015-09-29
Interior Alterations - Heritage Trading Post - International Departures - IFP · $92,000
no contractor listed Closed -
2015-09-28
Two new openings in wall · $9,700
AZTEC RENOVATIONS & REFIT Closed -
2015-09-23
Interior Alteration - Hudson Euro Cafe Transborder Pier - IFP · $575,000
no contractor listed Closed -
2015-09-20
Interior Alteraion - Rocky Mountain Chocolate Factory - IFP · $150,000
no contractor listed Closed -
2015-09-20
Interior Alteration - Menchies - Transborder Departures - IFP · $30,000
no contractor listed Closed -
2015-09-16
Interior Alterations - International Duty Free - International Departures - IFP · $1,500,000
no contractor listed Closed -
2015-09-15
YYC Non-Passenger Screening Vehicle Checkpoint - South · $1,810,200
no contractor listed Closed -
2015-09-14
Interior Alteration - New B/F Washroom/Sink · $18,000
KLM CONTRACTING Closed -
2015-09-04
Interior Alterations - Hudson Transborder Departures - IFP · $862,000
no contractor listed Closed -
2015-08-30
Interior Alterations - Travelex - International Departures - IFP · $160,000
no contractor listed Closed -
2015-08-30
Interior Alteration - Desigual Retail - International Departures - IFP · $632,000
no contractor listed Closed -
2015-08-30
Interior Alteration - Hudson International - International Departures - IFP · $795,000
no contractor listed Closed -
2015-08-27
Interior Alteration - Vin Room International Departures - IFP · $625,000
no contractor listed Closed -
2015-08-27
Interior Alteration - Transborder Departures Duty Free · $1,500,000
no contractor listed Closed -
2015-08-26
Interior Alteration - Hudson Travel & Leisure Dpartures Pre-security Check-in Hall - IFP · $967,000
no contractor listed Closed -
2015-08-25
Interior Alterations - Suite #725 Interior Partition Demolition Only · $20,000
no contractor listed Closed -
2015-08-23
Interior Alteration - Hudson Retail - Int. Departures Domesctic Holdroom Check-in Hall - IFP · $329,000
no contractor listed Closed -
2015-08-23
Interior Alterations - Hudson Group Utilities Level Storage Space Build-out · $127,000
no contractor listed Closed -
2015-08-21
YYC Starbucks Room #A15AC01 - Arrivals - IFP · $175,000
no contractor listed Closed -
2015-08-20
Interior Alteration - Sweet Factory - International Departures - IFP · $90,790
no contractor listed Closed -
2015-08-18
Interior Alteration - Starbucks Coffee -Transborder Departures - IFP · $175,000
no contractor listed Closed -
2015-08-12
Interior Alteration - Level 3 Air Canada Parkade Offices · $30,500
ENG CAN CONTRACTING Closed -
2015-08-12
Interior Alteration - LS Travel Relay - Transborder Departures - IFP · $500,000
no contractor listed Closed -
2015-08-12
Interior Alteration - L S Travel Relay - International Departures - IFP · $500,000
no contractor listed Closed -
2015-08-12
Interior Alteration - Hana Sushi - Transborder Departures - IFP · $180,000
no contractor listed Closed -
2015-08-11
Interior Alteration - Spolumbo's Food Court Tenant Fit-out - IFP · $200,000
no contractor listed Closed -
2015-08-11
Interior Alteration - Cococo Bernard Callebaut - International Departures - IFP · $50,000
no contractor listed Closed -
2015-08-11
Interior Alteration - Subway Sandwiches International Departures - IFP · $100,000
no contractor listed Closed -
2015-08-01
Interior Alteration - Skyway Wine & Liquor Tenant Fit-up -IFP · $250,000
no contractor listed Closed -
2015-08-01
Interior Alterations - Thai Express - IFP Transborder Departures Unit FC-10 · $160,000
no contractor listed Closed -
2015-08-01
Interior Alteration - Thai Express - IFP International Departures · $145,000
no contractor listed Closed -
2015-07-30
Interior Alteration - Lammle's Western Wear - International Departures -IFP · $210,000
no contractor listed Closed -
2015-07-30
Interior Alteration - Lammle's Westernwear - Transborder Departures -IFP · $185,000
no contractor listed Closed -
2015-07-29
Interier Alteration - Jugo Juice - Transborder Departures - IFP · $140,000
no contractor listed Closed -
2015-07-29
Interior Alteration - A & W Restaurant International Departures - IFP · $100,000
no contractor listed Closed -
2015-07-24
Interior Alteration - Green Chili Utility Level Storage Unit · $4,500
applicant withheld (individual) Closed -
2015-07-24
Interior Alteration - Green Chilii Restaurant (Kiosk) · $100,000
applicant withheld (individual) Closed -
2015-07-20
IFP Interior Alteration - ERA Ageless Retail - International Departures Level Unit RS-08 · $120,000
no contractor listed Closed -
2015-07-16
IFP Interior Alteration - Travelex Foreign Exchange · $253,000
no contractor listed Closed -
2015-07-16
IFP Interior Alteration - Travelex Foreign Exchange Kiosk
no contractor listed Closed -
2015-07-16
IFP Interior Alteration - Travelex Foreign Exchange Kiosk Unit RS-41 · $194,000
no contractor listed Closed -
2015-07-15
IFP Interior Alteration - Metalsmiths Sterling (International Departures level) · $90,000
no contractor listed Closed -
2015-07-14
IFP Interior Alteration - YYC Metalsmiths Sterling (Transborder Departrures) · $90,000
no contractor listed Closed -
2015-07-03
First Tenant Group D/E/F2 · $140,000
no contractor listed Closed -
2015-06-05
Arera Technologies - New&First Tenant fit-out · $175,000
no contractor listed Closed -
2015-06-01
Special Event - Relay for Life · $4,030
no contractor listed Closed -
2015-05-21
Racking Only · $50,700
no contractor listed Closed -
2015-04-30
Airport Terminal Building - A-Infill Area Interior partitions · $325,000
no contractor listed Closed -
2015-04-21
Westjet Fred Ring Bldg. - 6th Floor Interior Fit Up · $60,000
no contractor listed Closed -
2015-03-19
Tim Hortons - Relocation Calgary Airport Terminal Building · $500,000
no contractor listed Closed -
2015-03-11
Interior alteration (new tenant) · $200,000
no contractor listed Closed -
2015-02-25
Interior alteration (new / first tenant) · $150,000
no contractor listed Closed -
2015-02-19
Medical Clinic - Interior Alteration for Tenant Improvements · $260,000
no contractor listed Closed -
2015-02-18
Interior Alteration - White Hatters Lounge · $330,000
no contractor listed Closed -
2015-01-26
Interior Alteration - Additional sinks/partition · $61,667
E D M INTERIORS Closed -
2015-01-08
Interior Alteration - New Crepe Delicious · $250,000
no contractor listed Closed -
2014-12-23
Interior Alteration - CRA Retractable Wall · $98,000
NCI CONSTRUCTION Closed -
2014-12-16
Interior Alteration - New Offices · $25,000
no contractor listed Closed -
2014-12-12
Interior Alteration · $31,800
no contractor listed Closed -
2014-12-10
Add wall to create 2 new training rooms. · $35,000
no contractor listed Closed -
2014-11-07
No description · $600,000
no contractor listed Closed -
2014-10-08
Connectivity Project - A Knuckle Renovation · $4,143,900
no contractor listed Closed -
2014-09-26
David Foster Foundation Miracle Concert · $8,338
no contractor listed Closed -
2014-09-23
CP Rail Tenant improvements · $141,400
CLARK BUILDERS Closed -
2014-09-09
Terminal Connectivity Project - B/C-D Decanting · $3,182,000
no contractor listed Closed -
2014-08-21
Norcal Group - Warehouse/office - Airways Crossing II · $4,000,000
no contractor listed Closed -
2014-07-21
Maple Leaf Lounge Restaurant Renovation · $2,000,000
no contractor listed Closed -
2014-07-06
Airport Terminal Building -Departures Level - Junes Jewelery Relocation & Leashold Improvements · $245,500
no contractor listed Closed -
2014-06-18
Addition to ATB Calgary International Airport Terminal · $23,563,800
no contractor listed Closed -
2014-06-07
Calgary Relay For Life · $12,000
GOOD TIME PARTY RENTALS Closed -
2014-05-22
YYC Specialized Cargo Facility · $4,100,000
no contractor listed Closed -
2014-05-22
YYC Airside Maintenance Centre · $9,500,000
no contractor listed Closed -
2014-05-08
YYC Taxi Staging Facility · $1,000,000
no contractor listed Closed -
2014-04-16
Airport Corporate Centre - Interior Alterations - 7th Floor Suite 701/701B · $10,000
no contractor listed Closed -
2014-04-12
Airport Corporate Centre - 2nd Floor Modifications · $124,000
no contractor listed Closed -
2014-04-07
Commercial Project · $31,379,400
ELLISDON CONSTRUCTION Closed -
2014-03-31
Temporary Bus Shelter · $250,000
no contractor listed Closed -
2014-03-31
New restaurant taking over space · $150,000
no contractor listed Closed -
2014-03-25
Airport Expansion/Hotel · $596,614,379
ELLISDON CONSTRUCTION Closed -
2014-03-05
Interior alteration · $280,000
no contractor listed Closed -
2014-02-24
Demising walls and office partitioning · $257,500
CLARK BUILDERS Closed -
2014-02-19
Interior partitioning · $35,000
CENTRON CONSTRUCTION Closed -
2014-02-03
Addition & pedestrian tunnel · $12,116,700
no contractor listed Closed -
2014-01-10
New Building (Materials Handling Facility - IFP) · $7,955,823
no contractor listed Closed -
2013-12-12
Interior Partitioning · $500,000
ELLISDON CONSTRUCTION Closed -
2013-11-27
Walkway · $1,984,000
ELLISDON CONSTRUCTION Closed -
2013-11-25
Interior Alteration · $202,400
no contractor listed Closed -
2013-11-20
Interior partitioning · $1,912,000
no contractor listed Closed -
2013-11-20
Interior Alteration & Use · $30,000
no contractor listed Closed -
2013-11-14
Interior Partioning · $361,506
applicant withheld (individual) Closed -
2013-10-23
AMC Expansion - Vammas Bldg Addition · $5,237,900
no contractor listed Closed -
2013-10-03
Interior Alteration (Fire Alarm Repair) · $2,541
PDS FIRE PROTECTION Closed -
2013-09-19
Addition to office · $60,000
no contractor listed Closed -
2013-09-16
Special Function · $2,000
GREAT EVENTS RENTAL & SHOWROOM Closed -
2013-09-12
New · $2,450,000
no contractor listed Closed -
2013-09-09
interior alteration · $37,900
WHITE OAK CONTRACTING Closed -
2013-07-26
New Building - Sunwest Aviation New Hangar · $22,389,583
CANA MANAGEMENT Closed -
2013-07-08
New Stormwater Lift Station · $1,929,000
no contractor listed Closed -
2013-06-14
New Regional Terminal · $7,100,000
no contractor listed Closed -
2013-06-12
New security hut and gate · $70,000
no contractor listed Closed -
2013-06-12
New security hut and gate · $70,000
no contractor listed Closed -
2013-06-11
Special Function · $4,000
applicant withheld (individual) Closed -
2013-05-30
Commercial Interior Partition · $139,500
LEDCOR CONSTRUCTION Closed -
2013-05-17
Interior Alteration · $188,300
LEDCOR CONSTRUCTION Closed -
2013-05-14
Interior Alteration · $250,000
LEDCOR CONSTRUCTION Closed -
2013-05-09
Interior Partitioning · $12,600
CANA CONSTRUCTION Closed -
2013-03-25
New · $9,500,400
no contractor listed Closed -
2013-03-18
Interior Demolition · $1,900
FOWLIE ENTERPRISES Closed -
2013-03-11
New Building · $8,000,000
CLARK BUILDERS Closed -
2013-03-08
Interior Paritioning · $1,362,000
CANA CONSTRUCTION Closed -
2013-02-20
interior alteration and use · $20,000
CHOICE SPECIALTY SERVICES Closed -
2013-02-04
Interior Alteration (Existing Tenant) · $35,000
no contractor listed Closed -
2013-01-29
Fire Alarm Repair · $1,200
PDS FIRE PROTECTION Closed -
2013-01-28
Fire Alarm Repair · $1,400
PDS FIRE PROTECTION Closed -
2013-01-25
Walkway · $460,000
ELLISDON CONSTRUCTION Closed -
2013-01-25
New · $4,080,000
no contractor listed Closed -
2013-01-15
New Utility Building · $713,500
CUSTOM ELECTRIC* Closed -
2013-01-15
New Utility Building · $586,500
CUSTOM ELECTRIC* Closed -
2012-12-14
Interior Alteration · $450,000
no contractor listed Closed -
2012-12-05
New Equipment Shelter · $75,000
no contractor listed Closed -
2012-10-23
Interior Reno · $1,200,000
no contractor listed Closed -
2012-10-12
New Race track · $300,000
no contractor listed Closed -
2012-10-05
Racking permit: Sanmar Canada · $140,000
no contractor listed Closed -
2012-10-01
Interior partioning and use confirmation · $150,000
LYNCO INTERIOR SERVICES Closed -
2012-10-01
New hangar · $5,500,000
SCOTT BUILDERS Closed -
2012-09-28
Interior Alteration · $12,000
CHOICE SPECIALTY SERVICES Closed -
2012-09-27
interior alteration and use · $1,033,000
no contractor listed Closed -
2012-09-20
Interior Alterations · $220,000
no contractor listed Closed -
2012-09-04
Racking · $74,000
no contractor listed Closed -
2012-08-16
Interior Alteration · $500,000
LEDCOR CONSTRUCTION Closed -
2012-08-13
Racking for cooler · $50,000
STUART OLSON CONSTRUCTION Closed -
2012-07-13
Interior alteration · $520,000
STUART OLSON CONSTRUCTION Closed -
2012-07-13
Commercial Interior Alterations · $200,000
HOPEWELL DEVELOPMENT Closed -
2012-06-25
Interior Alteration · $270,000
ELAN CONSTRUCTION Closed -
2012-05-27
Interior · $38,000
WESTCAN BUILDERS Closed -
2012-05-24
Interior Reno: expansion of space · $70,000
no contractor listed Closed -
2012-05-24
Interior Alteration · $100,000
LEDCOR CONSTRUCTION Closed -
2012-04-17
Interior work · $111,268
no contractor listed Closed -
2012-03-03
Interior alteration and use · $7,000
CHOICE SPECIALTY SERVICES Closed -
2012-02-27
New banquet hall building for golf course. · $300,000
no contractor listed Closed -
2011-12-07
Interior Partioning · $120,000
no contractor listed Closed -
2011-11-30
Conversion of Harvey's to Burger King · $200,000
no contractor listed Closed -
2011-10-11
Interior Alteration · $16,000
no contractor listed Closed -
2011-09-22
New Kiosk · $125,000
LEDCOR CONSTRUCTION Closed -
2011-09-20
New Building · $684,000
no contractor listed Closed -
2011-08-30
Putting new Jugo juice into airport Gate D · $140,000
no contractor listed Closed -
2011-08-09
Interior Alteration · $6,500
CHOICE SPECIALTY SERVICES Closed -
2011-08-09
Commercial Project(exterior alteration) · $50,000
ELAN CONSTRUCTION Closed -
2011-08-06
Interior Alteration · $125,000
no contractor listed Closed -
2011-08-03
RACKING ONLY (existing tenant) · $35,100
no contractor listed Closed -
2011-07-27
Interior Partitioning · $125,000
no contractor listed Closed -
2011-07-19
Interior alteration and use · $106,700
no contractor listed Closed -
2011-07-19
Interior alteration · $171,000
no contractor listed Closed -
2011-07-15
Interior alteration · $135,100
no contractor listed Closed -
2011-07-09
Interior Reno · $30,000
LABBE-LEECH INTERIORS Closed -
2011-07-07
Interior Alteration · $39,000
no contractor listed Closed -
2011-06-10
Commercial Interior Partitioning · $11,650
applicant withheld (individual) Closed -
2011-06-08
Interior alteration and use · $120,000
no contractor listed Closed -
2011-05-26
Interior partition · $160,000
ELAN CONSTRUCTION Closed -
2011-05-25
Temporary Structure · $10,000
no contractor listed Closed -
2011-05-11
Interior partition · $300,000
HOPEWELL DEVELOPMENT Closed -
2011-05-06
Interior Partioning · $53,000
no contractor listed Closed -
2011-04-14
Interior partition · $90,000
ELLISDON CONSTRUCTION Closed -
2011-04-08
Racking · $15,000
no contractor listed Closed -
2011-04-06
Interior alteration · $488,750
no contractor listed Closed -
2011-03-24
Interior Alteration · $350,000
ELAN CONSTRUCTION Closed -
2011-03-22
New Temporary Terminal. · $3,789,000
ELLISDON CONSTRUCTION Closed -
2011-03-09
Interior Partition for Restaurant & Bar · $300,000
no contractor listed Closed -
2011-02-28
Interior Partition for Starbucks · $175,000
no contractor listed Closed -
2011-02-08
Interior Partitioning · $55,000
NCI CONSTRUCTION Closed -
2011-02-03
Interior Alterations and Use · $390,000
3 D INTERIORS Closed -
2011-01-11
Interior Alterations and Expansion · $24,000
MAGNUS INTERIORS Closed -
2010-12-07
Interior Alteration · $820,000
ELAN CONSTRUCTION Closed -
2010-11-29
Interior Alteration · $70,000
LYNCO INTERIOR SERVICES Closed -
2010-10-20
Interior alteration · $141,600
HOPEWELL DEVELOPMENT Closed -
2010-10-07
Commercial Interior Partition and Business Use Confirmation · $150,000
LAZLO ENTERPRISES Closed -
2010-08-19
New Building · $5,275,000
no contractor listed Closed -
2010-08-13
Commercial Interior Partition · $160,000
no contractor listed Closed -
2010-07-08
Interior alteration only · $375,000
NOVACOM CONSTRUCTION Closed -
2010-07-05
Temporary Structure · $10,000
no contractor listed Closed -
2010-06-28
Interior Partitioning
CONCO CONTRACTING Closed -
2010-06-15
Int Alt · $13,216
NORTH AMERICAN STORAGE EQUIPMENT Closed -
2010-06-11
Int Alt · $60,000
no contractor listed Closed -
2010-06-02
bridge replacement · $2,631,000
no contractor listed Closed -
2010-05-26
addition · $104,000
no contractor listed Closed -
2010-04-21
New Commercial Project · $456,800
ELLISDON CONSTRUCTION Closed -
2010-04-14
Interior alteration and use · $337,500
no contractor listed Closed -
2010-03-12
Commercial Interior Partition · $50,000
NCI CONSTRUCTION Closed -
2010-03-10
Commercial Interior Partition · $18,000
NCI CONSTRUCTION Closed -
2010-03-05
Small addition to kiosk · $20,000
no contractor listed Closed -
2010-01-26
Interior Partitioning · $1,080,000
no contractor listed Closed -
2009-12-22
Commercial Interior Partition (racking) · $72,950
ECONO-RACK GROUP (THE) Closed -
2009-11-24
Interior partition · $95,000
LABBE-LEECH INTERIORS Closed -
2009-11-24
Exterior renovations only · $8,000
FACILITY INTERIORS Closed -
2009-11-09
Commercial Interior Partition and Business Use Confirmation · $160,000
LABBE-LEECH INTERIORS Closed -
2009-11-02
Interior Partition; Business Use Confirmation · $85,000
HOPEWELL DEVELOPMENT Closed -
2009-07-22
Interior Partitioning · $95,000
no contractor listed Closed -
2009-07-14
New temporary building and interior alteration · $11,247,000
no contractor listed Closed -
2009-06-11
Interior Partition · $718,000
LEDCOR CONSTRUCTION Closed -
2009-05-28
Temporary Structure · $10,000
no contractor listed Closed -
2009-05-22
Interior Alterations · $88,000
DB CONTRACTING Closed -
2009-05-20
Interior renovation · $102,000
WESTCAN BUILDERS Closed -
2009-05-11
Interior Partitioning · $100,000
no contractor listed Closed -
2009-05-11
Addition · $2,381,700
no contractor listed Closed -
2009-05-06
Interior partitioning · $50,000
no contractor listed Closed -
2009-04-20
Racking and storage · $40,000
no contractor listed Closed -
2009-04-09
Interior Alteration · $109,900
no contractor listed Closed -
2009-03-02
Interior Alterations and Racking Permit · $100,000
no contractor listed Closed -
2009-02-23
Commercial Interior Partition (RACKING) · $19,000
NORTH AMERICAN STORAGE EQUIPMENT Closed -
2009-02-18
Office/Warehouse renovations · $200,000
HOPEWELL DEVELOPMENT Closed -
2009-02-13
Commercial Interior Partition and Business Use Confirmation · $200,000
no contractor listed Closed -
2009-02-03
Commercial Interior Partition · $150,000
HOPEWELL DEVELOPMENT Closed -
2009-01-30
Interior Alteration Leasehold Improvements · $287,800
no contractor listed Closed -
2009-01-14
Interior Alteration Leasehold Improvements · $184,000
no contractor listed Closed -
2008-12-17
Racking · $10,000
3 D INTERIORS Closed -
2008-12-04
Commercial Interior Partition and Business Use Confirmation · $329,000
no contractor listed Closed -
2008-11-19
int alt. (racking only) · $200,000
no contractor listed Closed -
2008-10-22
New Commercial Building · $5,700,000
no contractor listed Closed -
2008-10-15
Car Paint Station · $42,000
ELK RIVER CONTRACTORS Closed -
2008-10-08
Cafeteria kitchen · $685,000
no contractor listed Closed -
2008-10-08
Interior partitioning & demolition · $65,000
no contractor listed Closed -
2008-10-07
Interior partitioning · $30,000
no contractor listed Closed -
2008-10-06
Commercial Interior Partition · $450,000
STRAIGHT LINE CONTRACTING Closed -
2008-10-06
Commercial Interior Partition and Business Use Confirmation · $150,000
BUILD-360 Closed -
2008-10-03
New multi-level Parkade · $4,006,100
no contractor listed Closed -
2008-08-28
Interior partitioning · $410,000
no contractor listed Closed -
2008-08-18
Interior Partitioning w/ use Confirmation · $35,000
BEYERSBERGEN INTERIORS Closed -
2008-08-13
Commercial Interior Partition and Business Use Confirmation · $200,000
3 D INTERIORS Closed -
2008-08-05
Commercial Interior Partition and Business Use Confirmation · $118,000
PERSIMMON CONTRACTING Closed -
2008-06-24
Interior partitoning (phase one) · $400,000
PERSIMMON CONTRACTING Closed -
2008-06-17
Reclassification
no contractor listed Closed -
2008-06-13
Interior alteration · $36,000
no contractor listed Closed -
2008-06-11
Warehouse Industrial Pallet Racking - single tenant · $84,000
no contractor listed Closed -
2008-06-11
Commercial Interior Partition · $90,000
ZIMMER CONSTRUCTION Closed -
2008-06-06
Commercial Interior Partition and Business Use Confirmation · $200,000
HOPEWELL DEVELOPMENT Closed -
2008-06-04
Commercial Interior Partition · $100,000
no contractor listed Closed -
2008-06-04
Special function tents
no contractor listed Closed -
2008-06-04
Addition · $1,980,800
SCOTT BUILDERS Closed -
2008-05-15
New Commercial (Building E) · $3,398,900
ELAN CONSTRUCTION Closed -
2008-05-08
Remove Seating Area to Provide Retail Location · $75,000
no contractor listed Closed -
2008-04-22
Interior Partitioning and Tenant Improvements · $1,112,000
no contractor listed Closed -
2008-04-15
Interior Alteration · $129,000
no contractor listed Closed -
2008-04-04
Racking and washroom · $101,000
no contractor listed Closed -
2008-03-26
Commercial interior partitioning · $30,000
E & P ENTERPRISES Closed -
2008-03-26
Inetrior alteration · $30,000
no contractor listed Closed -
2008-03-12
Commercial Interior Partition · $3,500
DB CONTRACTING Closed -
2008-03-12
Changing locker room into staff lounge · $80,000
no contractor listed Closed -
2008-02-20
Office/racking system · $259,000
no contractor listed Closed -
2008-01-28
Racking · $24,000
no contractor listed Closed -
2008-01-22
Commercial Interior Partition · $60,000
HOPEWELL DEVELOPMENT Closed -
2008-01-18
No description · $230,000
no contractor listed Closed -
2008-01-16
Interior Demo/Partitioning · $476,000
no contractor listed Closed -
2008-01-16
Interior alterations · $80,000
no contractor listed Closed -
2008-01-16
Spray paint booth · $48,000
no contractor listed Closed -
2008-01-16
New Building · $80,000,000
no contractor listed Closed -
2008-01-07
New food kiosk · $120,000
TOTAL COMMERCIAL CONSTRUCTION Closed -
2007-12-11
Interior alteration and use · $70,000
no contractor listed Closed -
2007-12-07
Commercial interior partitioning for calgary air logistics · $956,000
no contractor listed Closed -
2007-12-03
New Warehouse · $5,057,000
HOPEWELL DEVELOPMENT Closed -
2007-11-28
New Warehouse · $5,078,700
HOPEWELL DEVELOPMENT Closed -
2007-11-19
Interior partitioning only · $132,000
BEYERSBERGEN INTERIORS Closed -
2007-11-15
Interior partitioning · $128,000
BEYERSBERGEN INTERIORS Closed -
2007-11-15
interior alterations & use confirmation · $45,000
no contractor listed Closed -
2007-11-08
Interiror Partitioning for Racking · $253,000
REED ATWOOD BUILDERS Closed -
2007-11-08
Commercial Interior Partition · $75,000
ARTIUS CONTRACTING Closed -
2007-11-06
Interior partitioning · $25,000
BEYERSBERGEN INTERIORS Closed -
2007-11-06
Interior partitioning · $99,000
HOPEWELL DEVELOPMENT Closed -
2007-11-01
House of tools build out · $208,500
HOPEWELL DEVELOPMENT Closed -
2007-10-16
Commercial Interior Partition · $162,000
no contractor listed Closed -
2007-10-16
Commercial Interior Partition · $50,000
no contractor listed Closed -
2007-10-15
Commercial Interior Partition · $40,000
no contractor listed Closed -
2007-10-15
Commercial Interior Partition · $203,000
no contractor listed Closed -
2007-10-11
Commercial Interior Partition · $79,000
no contractor listed Closed -
2007-10-02
Racking · $45,000
no contractor listed Closed -
2007-10-01
New Commercial Project · $2,653,000
DAWSON WALLACE CONSTRUCTION Closed -
2007-09-28
Interior Partition · $390,000
REED ATWOOD BUILDERS Closed -
2007-09-24
Storage Racking and Sprinkler System · $31,800
no contractor listed Closed -
2007-09-19
Interior Partitioning for Office Building · $71,600
no contractor listed Closed -
2007-08-30
Acclaim Airport Hotel · $6,111,196
no contractor listed Closed -
2007-08-29
[name withheld] OFFICE RENO · $687,000
no contractor listed Closed -
2007-08-24
Commercial interior partition and business use confimation · $20,000
no contractor listed Closed -
2007-08-15
Commercial Interior Alteration · $2,072,000
no contractor listed Closed -
2007-08-07
Interior alteration and use · $113,000
HOPEWELL DEVELOPMENT Closed -
2007-08-07
New clubhouse building · $922,000
no contractor listed Closed -
2007-06-25
Interior build out · $100,000
no contractor listed Closed -
2007-06-13
Interior alteration and use · $100,000
REED ATWOOD BUILDERS Closed -
2007-06-12
Commercial Interior Partition and Business Use ConfirmationI · $15,000
HURST CONSTRUCTION Closed -
2007-05-31
Interior Alteration · $4,000
applicant withheld (individual) Closed -
2007-05-14
New Commercial Building · $5,776,496
no contractor listed Closed -
2007-05-14
Warehouse Industrial Pallet Racking - single tenant · $2,010,000
no contractor listed Closed -
2007-04-24
Interior alteration & use confirmation · $250,000
MAPLE REINDERS CONSTRUCTORS Closed -
2007-04-18
Interior alteration · $700,000
LEDCOR CONSTRUCTION Closed -
2007-03-29
New interior partitioning · $60,000
no contractor listed Closed -
2007-03-22
Interior Partitioning · $117,557
E & P ENTERPRISES Closed -
2007-03-05
Interior Alteration and Use · $6,000
no contractor listed Closed -
2007-02-21
Temporary Aircraft Storage Facility (Tent) · $350,000
no contractor listed Closed -
2007-02-05
New · $65,000
no contractor listed Closed -
2007-01-18
Commercial Project · $2,700,000
no contractor listed Closed -
2007-01-16
New door between bays. · $3,000
no contractor listed Closed -
2006-12-14
New Aircraft Hangar/Office Building · $5,500,000
no contractor listed Closed -
2006-12-08
New Industrial · $4,267,000
HOPEWELL DEVELOPMENT Closed -
2006-11-23
Commerical project · $3,015,394
no contractor listed Closed -
2006-10-18
Addition & Interior Alteration · $815,000
no contractor listed Closed -
2006-10-05
New Warehouse · $800,000
SCOTT BUILDERS Closed -
2006-09-18
Commercial Project · $5,725,000
DOMINION CONSTRUCTION COMPANY Closed -
2006-09-01
New Warehouse · $5,138,668
no contractor listed Closed -
2006-08-18
Interior Alterations · $3,217,000
SOUNDTEX INTERIORS Closed -
2006-07-04
Commercial Interior Partition · $250,000
P N G CONSTRUCTION Closed -
2006-07-03
New · $4,875,000
DOMINION CONSTRUCTION COMPANY Closed -
2006-07-03
New · $3,650,000
DOMINION CONSTRUCTION COMPANY Closed -
2006-06-21
Commercial Interior Partition · $7,500
no contractor listed Closed -
2006-06-05
Commercial Interior Partition and Business Use Confirmation · $62,000
J C CONSTRUCTION & HOMES Closed -
2006-05-24
interior alterations for new tenant on 3rd floor · $200,000
COUGAR CONTRACTORS Closed -
2006-04-19
Int alt · $18,000
applicant withheld (individual) Closed -
2006-04-11
Int alt (demolition only) · $2,000
applicant withheld (individual) Closed -
2006-03-22
Interior alteration and use approval · $100,000
P N G CONSTRUCTION Closed -
2006-02-08
Interior alteration for existing tenant · $20,000
ARTIUS CONTRACTING Closed -
2005-10-11
Interior Alterations & Use Approval · $100,000
no contractor listed Closed -
2005-09-20
Interior Alteration & Use Approval · $225,500
WESTCORP INC Closed -
2005-09-09
3 Temporary Tents · $2,475
no contractor listed Closed -
2005-09-08
New storage building · $450,000
no contractor listed Closed -
2005-08-26
Interior alterations · $139,200
no contractor listed Closed -
2005-06-16
Interior Alteration · $5,000
no contractor listed Closed -
2005-04-08
Int alt · $2,825,357
ELLISDON CONSTRUCTION Closed -
2005-03-31
Interior Alterations · $92,328
E & P ENTERPRISES Closed -
2005-03-30
Interior Alteration · $214,000
no contractor listed Closed -
2005-03-18
Interior Alteration (Existing Tenant) · $12,000
LYNCO INTERIOR SERVICES Closed -
2005-03-16
Commercial Project - Stadium Locker Rooms · $1,070,000
no contractor listed Closed -
2005-02-28
Interior alterations (relocation to new space) · $350,000
PCL CONSTRUCTION MANAGEMENT Closed -
2005-02-25
Interior Alteration and Use Approval · $30,000
ICE-HOUSE ENTERPRISES Closed -
2005-02-22
Interior Partition & Use Confirmation (1st tenant in new addition) · $50,000
no contractor listed Closed -
2005-01-24
Commercial Interior Partition and Business Use Confirmation · $191,836
NVR CONSTRUCTION Closed -
2005-01-19
Commercial Interior Partition · $170,000
no contractor listed Closed -
2004-12-27
Cellular Mobility Shelter · $40,000
no contractor listed Closed -
2004-12-27
Interior Alteration and Use Approval · $50,000
no contractor listed Closed -
2004-12-11
Interior Alterations · $216,854
no contractor listed Closed -
2004-12-10
Interior alteration · $415,400
no contractor listed Closed -
2004-12-09
Interior alteration · $4,000,000
no contractor listed Closed -
2004-12-08
interior alterations · $1,160,000
no contractor listed Closed -
2004-12-06
Interior alterations to unit R59 · $70,000
P N G CONSTRUCTION Closed -
2004-12-06
Interior Partitioning · $80,000
no contractor listed Closed -
2004-12-06
Interior Alteratoin and Use Confirmation · $87,500
ELLISDON CONSTRUCTION Closed -
2004-11-19
Interior Alteration and Use · $65,000
no contractor listed Closed -
2004-11-19
Interior alteration · $126,000
no contractor listed Closed -
2004-11-16
New Telus Shelter Building (Leasehold Improvement) · $75,000
CUSTOM RIGGERS Closed -
2004-11-05
Interior Alteration and Use · $18,000
no contractor listed Closed -
2004-10-18
Interior alterations · $60,000
no contractor listed Closed -
2004-10-07
Commercial Interior Partition and Business Use Confirmation for Retail · $150,000
no contractor listed Closed -
2004-09-24
Interior Alteration and Use Confirmation · $13,000
BENTLEY CONSTRUCTORS Closed -
2004-09-20
Commercial Interior Partition for existing tenant · $126,000
no contractor listed Closed -
2004-09-18
Interior Partioning · $190,000
no contractor listed Closed -
2004-09-18
Interior Partioning · $100,000
no contractor listed Closed -
2004-09-17
INTERIOR PARTITION & Use Approval · $36,350
no contractor listed Closed -
2004-09-13
Interior alteration · $300,000
no contractor listed Closed -
2004-08-31
Interior Alteration · $40,000
no contractor listed Closed -
2004-08-26
Interior Alteration · $40,000
3 D INTERIORS Closed -
2004-08-21
Addition to main airport terminal and interior renovation · $2,771,710
no contractor listed Closed -
2004-08-20
Commercial interior partition for existing tenant · $100,000
no contractor listed Closed -
2004-08-20
commercial interior partition for existing tenant · $187,000
no contractor listed Closed -
2004-08-19
Interior alterations & use confrimation for new tenant · $55,000
no contractor listed Closed -
2004-08-16
No description · $90,000
no contractor listed Closed -
2004-06-25
Interior Alteration & Use · $55,000
no contractor listed Closed -
2004-04-27
Interior Alterations and Use Approval · $75,000
no contractor listed Closed -
2004-03-16
Interior Alterations · $700,000
no contractor listed Closed -
2004-03-11
Interior alteration · $70,000
no contractor listed Closed -
2004-02-28
Interior Alteration · $50,000
P N G CONSTRUCTION Closed -
2003-12-19
Interior Alteration · $40,000
P N G CONSTRUCTION Closed -
2003-12-18
Interior alteration · $350,000
no contractor listed Closed -
2003-11-27
Commercial Project · $11,597,000
STUART OLSON CONSTRUCTION Closed -
2003-11-19
Interior Restaurant Relocation · $15,000
no contractor listed Closed -
2003-11-19
Interior Restaurant Relocation · $30,000
no contractor listed Closed -
2003-10-28
Atco Trailer · $36,000
BENTLEY CONSTRUCTORS Closed -
2003-10-24
Commercial Interior Partition and Business Use Confirmation · $12,323
E & P ENTERPRISES Closed -
2003-10-10
Commercial Interior Partition (Water Repair) and Business Use Confirmation · $104,000
P N G CONSTRUCTION Closed -
2003-09-17
Interior alterations & use confirmation · $50,000
LEDCOR CONSTRUCTION Closed -
2003-08-12
Interior alterations - storefront renovation into common area increasing seating area by 4.6m2 · $31,400
no contractor listed Closed -
2003-07-16
Interior alterations · $15,000
no contractor listed Closed -
2003-06-21
Interior Partitioning · $600,000
no contractor listed Closed -
2003-06-13
Commercial Interior Partition & Use Approval · $37,500
no contractor listed Closed -
2003-04-24
Interior Alteration with Mezzanine · $126,000
no contractor listed Closed -
2003-04-05
Interior Alteration · $88,000
no contractor listed Closed -
2003-04-05
Interior Alteration · $83,000
no contractor listed Closed -
2003-03-31
No description · $44,990,538
no contractor listed Closed -
2003-03-13
YYC Business Centre · $109,110
no contractor listed Closed -
2003-03-11
Interior Alteration · $40,000
PCL CONSTRUCTION MANAGEMENT Closed -
2003-02-13
Interior alteration · $54,500
no contractor listed Closed -
2003-01-27
Interior Renovations · $280,000
no contractor listed Closed -
2003-01-22
Interior Alteration and Use · $24,000
LEDCOR CONSTRUCTION Closed -
2002-11-29
Interior Partition & Use Approval · $110,000
no contractor listed Closed -
2002-11-29
Interior Alterations and Use Approval · $86,800
LEDCOR CONSTRUCTION Closed -
2002-11-22
Int Alt · $22,264
ELLISDON CONSTRUCTION Closed -
2002-11-20
Int Alt · $32,000
LEDCOR CONSTRUCTION Closed -
2002-11-04
Interior alterations & use confirmation · $8,000
no contractor listed Closed -
2002-10-31
Interior alterations & use confirmation · $14,000
no contractor listed Closed -
2002-10-31
Interior Partioning · $165,000
BRO MAX BUILDERS Closed -
2002-10-29
Interior Alteration · $15,000
no contractor listed Closed -
2002-10-29
Interior Alteration · $223,000
no contractor listed Closed -
2002-10-25
Interior Alteration · $202,000
no contractor listed Closed -
2002-10-25
New Air Terminal · $12,000,000
ELLISDON CONSTRUCTION Closed -
2002-10-23
Commercial Interior Partition · $15,647
no contractor listed Closed -
2002-10-21
Interior alterations · $103,000
no contractor listed Closed -
2002-10-18
Interior Partition · $36,500
no contractor listed Closed -
2002-10-18
Interior Partioning & Business Use Confirmation · $27,264
no contractor listed Closed -
2002-10-11
3 new buildings · $832,000
no contractor listed Closed -
2002-10-11
New · $331,666
no contractor listed Closed -
2002-10-04
Interior Partition · $42,500
no contractor listed Closed -
2002-09-27
Interior Alterations · $230,000
no contractor listed Closed -
2002-09-27
interior Alterations · $400,000
no contractor listed Closed -
2002-09-27
Interior Alterations · $260,000
no contractor listed Closed -
2002-09-27
Interior Partitioning · $592,921
ELLISDON CONSTRUCTION Closed -
2002-09-27
Interior alteration and use approval · $160,000
no contractor listed Closed -
2002-09-27
Interior alteration and use approval · $171,200
no contractor listed Closed -
2002-09-26
Interior alteration and use approval · $192,000
no contractor listed Closed -
2002-09-19
Mechanical & Electrical Relocates - Preparitory work for future development · $788,999
no contractor listed Closed -
2002-08-16
New Office Warehouse · $1,352,167
no contractor listed Closed -
2002-07-23
Interior alteration · $1,966,000
ELLISDON CONSTRUCTION Closed -
2002-07-17
Addition to North Processor - TP#6 · $411,000
no contractor listed Closed -
2002-06-13
Interior alteration · $80,000
no contractor listed Closed -
2002-04-01
North Processor Only · $27,300,000
no contractor listed Closed -
2002-03-21
Addition to Airport · $377,951
no contractor listed Closed -
2002-02-28
Interior Alteration · $40,000
LEDCOR CONSTRUCTION Closed -
2002-02-13
int. alt. · $600,000
no contractor listed Closed -
2002-01-07
Interior Alteration and Business Use Confirmation · $40,000
no contractor listed Closed -
2001-12-18
New · $16,467,000
ELLISDON CONSTRUCTION Closed -
2001-12-13
interior alterations · $39,627
E & P ENTERPRISES Closed -
2001-12-13
Addition to Parkade · $18,500,000
no contractor listed Closed -
2001-11-12
Interior Alteration · $10,000
LEDCOR CONSTRUCTION Closed -
2001-11-10
Interior Alteration · $1,800,000
no contractor listed Closed -
2001-11-10
Interior Alteration · $1,175,866
no contractor listed Closed -
2001-10-12
Interior Alterations to Existing Tenant · $32,000,000
no contractor listed Closed -
2001-07-24
Internal Modifications to HVAC · $596,713
no contractor listed Closed -
2001-05-29
interior renovations · $30,000
MAPLE REINDERS CONSTRUCTORS Closed -
2001-05-28
Mechanical & Electrical Upgrades Boiler & Chiller Installation · $2,053,591
no contractor listed Closed -
2001-04-30
North Processor Only · $95,000
no contractor listed Closed -
2001-04-18
Interior Alteration -Existing Tenant · $5,000
no contractor listed Closed -
2000-12-20
Interior alterations · $650,000
no contractor listed Closed -
2000-12-12
Interior Alterations and use confirmation · $58,000
no contractor listed Closed -
2000-12-06
New car wash & additon to existing repair bay · $1,250,000
MCFARLANE INTERIOR CONTRACTING Closed -
2000-10-31
Interior alterations · $75,000
no contractor listed Closed -
2000-10-10
interior alterations · $75,000
no contractor listed Closed -
2000-10-02
Interior alterations only · $700,000
no contractor listed Closed -
2000-09-01
Interior Alteration & Business Use Confirmation · $20,000
PERSIMMON CONTRACTING Closed -
2000-08-09
interior alterations · $120,000
O'CONNOR ELECTRIC Closed -
2000-08-01
No description · $137,216
no contractor listed Closed -
2000-07-27
int.part · $100,000
PANTHER MANAGEMENT Closed -
2000-07-14
Interior and exterior alterations · $168,000
ELLISDON CONSTRUCTION Closed -
2000-06-26
Int Alt · $30,000
no contractor listed Closed -
2000-06-19
3 New Booths in Parking Garage and alterations to existing booth · $114,000
no contractor listed Closed -
2000-06-01
New Booth In Existing Parkade · $126,000
BENTLEY CONSTRUCTORS Closed -
2000-05-31
new parking booth · $48,500
no contractor listed Closed -
2000-05-25
New kiosk in existing building. · $30,000
no contractor listed Closed -
2000-05-08
int. part. & use for office · $108,202
SOUNDTEX INTERIORS Closed -
2000-04-17
interior alterations · $20,000
PCL CONSTRUCTION MANAGEMENT Closed -
2000-04-14
Interior alterations · $382,365
no contractor listed Closed -
2000-04-03
Interior alterations · $694,000
no contractor listed Closed -
2000-04-03
Int. Alt. for Restaurant -- Food Only · $80,000
PANTHER MANAGEMENT Closed -
2000-03-23
No description · $46,639
PCL CONSTRUCTION MANAGEMENT Closed -
2000-03-22
No description · $41,378
PCL CONSTRUCTION MANAGEMENT Closed -
2000-03-16
Interior Alterations for Restaurant/Lounge · $750,000
PANTHER MANAGEMENT Closed -
2000-03-15
int. part. · $400,000
LEDCOR CONSTRUCTION Closed -
2000-03-13
interior alterations · $250,000
no contractor listed Closed -
2000-01-18
interior alt & use · $173,000
INTEGRA CONTRACTING Closed -
2000-01-17
interior alterations and use permit · $40,000
no contractor listed Closed -
2000-01-03
int. part. · $70,000
HURST CONSTRUCTION Closed -
1999-12-23
Interior Alterations · $70,000
SOUNDTEX INTERIORS Closed -
1999-12-21
interior alterations · $35,000
applicant withheld (individual) Closed -
1999-12-21
No description · $60,000
no contractor listed Closed -
1999-12-13
Interior partitioning · $94,000
no contractor listed Closed -
1999-12-06
Interior Alterations - Slab Loweeing · $750,000
no contractor listed Closed -
1999-11-02
Interior Alterations · $53,000
BREWSTER WEST INDUSTRIES Closed -
1999-10-15
Interior Alterations and Use · $25,000
no contractor listed Closed -
1999-10-13
interior alterations · $398,000
PCL CONSTRUCTION MANAGEMENT Closed -
1999-10-07
Interior Partion · $2,000,000
no contractor listed Closed -
No description · $27,892,000
PCL CONSTRUCTION MANAGEMENT In review -
No description · $25,000
no contractor listed In review -
YYC DTB Restoration Concourse B - TP4.2 Arrivals and Base building Services · $58,868,000
PCL CONSTRUCTION MANAGEMENT In review -
No description · $1,564,400
PCL CONSTRUCTION MANAGEMENT In review -
Temporary event - tents
no contractor listed Closed -
Wholesale Produce Cooler
no contractor listed Closed -
Interior Wall Assembly Between the Worship Hall & Storage Room
no contractor listed Closed -
Food Storage Warehouse - SPUD
no contractor listed Closed -
Racking Only
no contractor listed Closed -
No description
PCL CONSTRUCTION MANAGEMENT Closed -
Racking Only
no contractor listed Closed -
No description
no contractor listed Closed -
No description
BUDAL GROUP Closed -
No description
BUDAL GROUP Closed -
No description
no contractor listed Closed -
No description
no contractor listed Closed -
No description
LEDCOR CONSTRUCTION Closed -
No description
no contractor listed Closed -
New Banquet Facility - temp tent.
no contractor listed Closed -
Interior Alteration
NORCAL CONSTRUCTION Closed
Email alerts and sign-up aren't available yet. Everything on these pages is free to use without an account. Questions: [email protected]
Recent permits in Calgary International Airport
Fire alarm replacement · PRO-TECH FIRE AND SAFETY2026-10-26
Additional Conveyer Added to Existing System · BLACK TIE ELECTRIC2026-09-29
Fedex New Conveyer Sprinkler Upgrade · VIPOND SYSTEMS & FIRE PROTECTION GROUP2026-09-29